R-2A Activity · President's Budget PB2027

Test and Evaluation

Activity a2·Project DM2 — AIAMD Software Development & Integration·PE 0606118A·U.S. Army
FY2027 Request
$110.4M
▲ 15% vs FY2026
HitchAI read

This activity requests $110.4M in FY2027, 17% of project DM2, up 15% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$110.4M
▲ 15% vs FY2026
FY2026 Enacted
$96.0M
In law
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project DM2 of PE 0606118A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Support developmental testing with LTAMDS, IFPC, Sentinel A4, RIG-360 and ALPS in support of IFTC 27. IFTC 27 will support fielding of the Guam Defense System capability including all PEO MS Guam components (IBCS, LTAMDS, Patriot & IFPC Inc. 2 interceptors, Sentinel A4, RIG-360, ALPS) both at WSMR and in a littoral environment for over the water testing. Activities include OCONUS testing (shipping, range infrastructure requirements, TDY, range execution personnel), complex testing scenarios, and implementation of a robust flight test matrix with Developmental Test as risk reduction, pre-Flight Lab Work for pre-mission analysis, post flight analysis, Joint external test participants and range safety data packages. This effort crosses multiple components within the architecture, to include THAAD, ensuring an integrated fires operational capability. Testing will be conducted against the GDS threat set including particular targets for that littoral area of operations. Specific test efforts include software development testing, component integration testing, software requirements verification, system of systems capability validation and test articles to support other component testing and requirements verification. Continue to participate in Joint events to include Orange Flag, Project Convergence, Joint All-Domain Command and Control (JADC2). Funding also includes test hardware to integrate 1-N capabilities. SoS updates to the architecture and verification testing with complex targets.

FY2026 to FY2027 change

FY 2027 funding increase supports IFTC 27 activities as well as SoS updates to the architecture and verification testing with complex targets.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Support developmental testing with LTAMDS, IFPC, Sentinel A4, RIG-360 and ALPS in support of IFTC 26. IFTC 26 will support fielding of the Guam Defense System capability including all PEO MS Guam components (IBCS, LTAMDS, Patriot & IFPC Inc. 2 interceptors, Sentinel A4, RIG-360, ALPS) both at WSMR and in a littoral environment for over the water testing. Activities include OCONUS testing (shipping, range infrastructure requirements, TDY, range execution personnel), complex testing scenarios, and implementation of a robust flight test matrix with Developmental Test as risk reduction, pre-Flight Lab Work for pre-mission analysis, post flight analysis, Joint external test participants and range safety data packages. This effort crosses multiple components within the architecture ensuring an integrated fires operational capability. Testing will be conducted against the GDS threat set including particular targets for that littoral area of operations. Specific test efforts include software development testing, component integration testing, software requirements verification, system of systems capability validation and test articles to support other component testing and requirements verification. Continue to participate in Joint events to include Orange Flag, Project Convergence, Joint All-Domain Command and Control (JADC2). Funding also includes test hardware to integrate 1-N capabilities.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

255075100096.0FY26ENACTED110.4FY27REQUEST
Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted96.0
FY2027Request110.4

This activity is 17% of project DM2's FY2027 request and 17% of PE 0606118A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

4 activities in project DM2

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0606118A, project DM2 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0606118A/DM2/a2.md · MCP mcp.hitchintel.combudget_get_activity