R-2A Activity · President's Budget PB2027

Effector Product Improvement

FY2027 Request
$161.4M
▲ 31% vs FY2026
HitchAI read

This activity requests $161.4M in FY2027, 100% of project DJ6, up 31% on FY2026. The R-2A exhibit describes it across FY2025–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$161.4M
▲ 31% vs FY2026
FY2026 Enacted
$123.1M
▲ 48% vs FY2025
FY2025 Actual
$83.1M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project DJ6 of PE 0607865A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

-Continue program development through system level modeling, simulation, integration and test support to address emerging threats -Continue test program to include utilization of targets/threat simulators, flight simulator and modeling efforts to maintain effectiveness -Continue supporting Integrated Fires and current force PATRIOT integrated fires PAC-3 missile segment testing -Continue PATRIOT program M&S laboratory infrastructure maintenance as well as the conduct of M&S for hardware/software capability improvements -Continue U.S. Government and contractor support to ensure force effectiveness is maintained to keep pace with evolving and emerging threats -Continue system integration activities, test and analysis, and threat analysis and modeling -Continue development of PAC-3 Fire Control and LoE -Continue AMD Effectors Survivability efforts for enhanced electronic protection across lower tier effectors (interceptors, fire control and M903 launching stations) -Continue development of PAC-3 MSE and Fire Control Enhancements specific to GDS for use in developmental testing in the LTAMDS/IBCS configuration. -Continue support for Hardware in the Loop (HWIL): Millimeter-wave Simulation System - 1 (MSS-1), Millimeter-wave Simulation System - 2 (MSS-2), and PATRIOT Simulation (PATSIM)

FY2026 to FY2027 change

Funding increase is due to acceleration of AMD Effectors Survivability efforts and increased Hardware in the Loop activity

Before the request year

FY2025–FY2026: what came before

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Activities continued below were funded through project DV8 prior to FY25 -Continue program development through system level modeling, simulation, integration and test support to address emerging threats -Continue test program to include utilization of targets/threat simulators, flight simulator and modeling efforts to maintain effectiveness -Continue supporting Integrated Fires and current force PATRIOT integrated fires PAC-3 missile segment testing -Continue PATRIOT program M&S laboratory infrastructure maintenance as well as the conduct of M&S for hardware/software capability improvements -Continue U.S. Government and contractor support to ensure force effectiveness is maintained to keep pace with evolving and emerging threats -Continue system integration activities, test and analysis, and threat analysis and modeling -Continue development of PAC-3 Fire Control and LoE -Continue AMD Effectors Survivability efforts for enhanced electronic protection across lower tier effectors (interceptors, fire control and M903 launching stations) -Continue development of PAC-3 MSE and Fire Control Enhancements specific to GDS for use in developmental testing in the LTAMDS/IBCS configuration.

FY2025 accomplishments

Activities continued below were funded through project DV8 prior to FY25 -Continue program development through system level modeling, simulation, integration and test support to address emerging threats -Continue test program to include utilization of targets/threat simulators, flight simulator and modeling efforts to maintain effectiveness -Continue supporting Integrated PAC-3 Fire Testing -Continue PATRIOT program M&S laboratory infrastructure maintenance as well as the conduct of M&S for hardware/software capability improvements -U.S. Government and contractor support to ensure force effectiveness is maintained to keep pace with evolving and emerging threats -Continue system integration activities, test and analysis, and threat analysis and modeling -Continue development of PAC-3 Fire Control and LoE

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

50100150083.1FY25ACTUAL123.1FY26ENACTED161.4FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual83.1
FY2026Enacted123.1
FY2027Request161.4

This activity is 100% of project DJ6's FY2027 request and 74% of PE 0607865A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

1 activity in project DJ6

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Effector Product Improvement — this activity$161.4M ▲ 31%
Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0607865A, project DJ6 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.