RDT&E Project · President's Budget PB2027

Patriot Product Improvement

Project DV8·PE 0607865A — Patriot Product Improvement·U.S. Army·BA7
FY2027 Request
$57.6M
▲ 1.3% vs FY2026
HitchAI read

Project DV8 — Patriot Product Improvement requests $57.6M in FY2027, 26% of the $219.0M requested for program element 0607865A, up 1.3% on FY2026. 1 R-2A activity decomposes the request. RTX / Raytheon is the largest named R-3 performer at $4.4M, 7.6% of the project's FY2027 R-3 total.

FY2027 Request
$57.6M
▲ 1.3% vs FY2026
FY2026 Enacted
$56.9M
▼ 28% vs FY2025
FY2025 Actual
$79.2M
Prior year
Project detail

What project DV8 buys

The PATRIOT system includes a family of hardware, software, interceptors (PAC-2, Guidance Enhanced Missiles, PAC-3 and PAC-3 Missile Segment Enhancement) and Ground Support Equipment. PATRIOT system components (interceptors, launcher, and radar) are integrated with current force PATRIOT and Army Integrated Air and Missile Defense (IAMD) components, including IBCS. As PATRIOT system components software and hardware improvements are developed, there is a continuing need for system level modeling, simulation, integration and testing. Modeling and Simulation (M&S) allow for performance assessment against specific threats in a manner that is not practical to demonstrate with live fire flight tests alone due to cost, target availability, and range constraints. Flight testing is periodically required for M&S validation as well as satisfying ATEC/DOTE requirements of segment improvements. The FY 2027 funding in the amount of $57.640 Million supports the following: -PATRIOT system components software and hardware improvements for threat evolution: Performs necessary analysis and development efforts to maintain PATRIOT system (interceptors, ground support equipment, and current radar) effectiveness against evolving threat technologies and capabilities, support convergence with the IBCS, and complete PATRIOT Component Software Builds (PCSB). This effort identifies evolving threats and threat characteristics that present a challenge to PATRIOT's current capabilities and develops initial concepts to maintain system effectiveness including detection, tracking, discrimination, and engagement relative to these threats. Additionally, evolving threat information is used to develop, integrate, and assess evolving lethality models in high-fidelity interceptor simulations supporting system level assessment of hit-to-kill and warhead interceptor performance. -Advanced Electronic Counter Measures (AECM): This task investigates the implications of advanced technology Digital Radio Frequency Memory available on airborne platforms that enables new ECM techniques which could adversely degrade Air and Missile Defense System effectiveness. AECM efforts support PATRIOT system interceptors, ground support equipment, and current radar.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
Funding trajectory

Project DV8 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075079.2FY25ACTUAL56.9FY26ENACTED57.6FY27REQUEST58.2FY2856.9FY2958.5FY3059.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual79.2
FY2026Enacted56.9
FY2027Request57.6
FY2028Outyear58.2
FY2029Outyear56.9
FY2030Outyear58.5
FY2031Outyear59.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$79.2M
FY2026 enacted$56.9M
FY2027 request$57.6M

-Continue Software Improvement for Threat Evolution and AECM to address emerging threats and convergence with IBCS -Continue Combat ID enhancements to reduce fratricide potential -Continue Tasks 2, 6, and 7 activities to develop hardware and software to maintain PATRIOT system effectiveness in the field -Continue program development…

Read the FY2027 plan →
Who's building it

Named performers on project DV8

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$4.4M · 7.6%
RSA, AL
$2.4M · 4.2%
RDEC and OGA'S
$1.8M · 3.2%
RSA
$0.9M · 1.6%