What project 675135 buys
Project 675135, Warfighter Readiness, develops and supports a software tool named Command & Control Simulation Environment for Training (C2SET). C2SET will be the authoritative representation of USAF and Joint theater-level air and space power training to Air and Space Operations Center (AOC) warfighters and Combatant Commanders' battle staffs. C2SET delivers realistic models and tools representing the tactical and operational capabilities the USAF brings to the joint fight. The goal is delivering a fully scalable and more scientific based modeling, simulation, and training stimulation to the users. C2SET will replace legacy model called Air Force Modeling & Simulation Training Toolkit (AFMSTT) with the proven Advanced Framework for Simulation, Integration, and Modeling (AFSIM) and/or similar models. AFMSTT entered sustainment in FY 2021 and continues to receive operational updates to maintain operational currency until fully replaced by C2SET and depreciated. C2SET includes several complimentary initiatives: Warfighter and Joint Training Integration supports the Chief of Staff of the Air Force (CSAF) directed Live, Virtual, and Constructive (LVC) integration efforts and is a critical piece to the USAF's implementation of the Strategic Plan for Transforming DoW Training. The goal of LVC training and mission rehearsal is to prepare our warfighters for the full range of military operations and maintain the combat readiness levels required by the Combatant Commands. This can only be accomplished by training and rehearsing in realistic operational environments. These environments include live training ranges and virtual simulators enhanced with constructive entities. Specific training and mission rehearsal events can include some or all of these simultaneously; making the ability to integrate LVC capabilities a necessity. The Air, Space, and Cyberspace Constructive Environment (ASCCE) is the USAF's authoritative federation of constructive to the Combined Forces Air Component Commander (CFACC).
- Product Development
- Support
- Test and Evaluation
- Management Services
Project 675135 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 15.0 |
| FY2026 | Enacted | 16.2 |
| FY2027 | Request | 12.1 |
| FY2028 | Outyear | 12.5 |
| FY2029 | Outyear | 12.7 |
| FY2030 | Outyear | 12.9 |
| FY2031 | Outyear | 13.2 |
1 accomplishment / planned program
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
- Test and deploy modernized constructive, campaign-level simulation capabilities to users across the simulation centers at Osan, Hickam, and other DoD installations - Continue integration with Air Operations Center modernization and wing-level applications - Accelerate deprecation of existing legacy modeling and simulation capabilities…
Read the FY2027 plan →Named performers on project 675135
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.