RDT&E Project · President's Budget PB2027

CV-22

Project SF200·PE 1160403BB — Aviation Systems·Defense-Wide·BA7
FY2027 Request
$16.8M
▲ 409% vs FY2026
HitchAI read

Project SF200 — CV-22 requests $16.8M in FY2027, 7.7% of the $216.8M requested for program element 1160403BB, up 409% on FY2026. 3 R-2A activities decompose the request.

FY2027 Request
$16.8M
▲ 409% vs FY2026
FY2026 Enacted
$3.3M
▼ 77% vs FY2025
FY2025 Actual
$14.5M
Prior year
Project detail

What project SF200 buys

This project supports integration, design, development, rapid prototyping, and test to provide improved capabilities to include, but not limited to: more robust performance in situational awareness (SA); intelligence, surveillance, and reconnaissance (ISR), weapons, avionics; Special Operations Forces (SOF) communications; defensive/survivability systems; interoperability; speed and maneuverability; mission deployment and improved reliability and maintainability of the CV-22 platform. The CV-22 Osprey is a SOF variant of the V-22 vertical medium lift, multi-mission aircraft. The CV-22 provides long-range, high speed, all weather, infiltration (infil), exfiltration (exfil), and resupply of SOF teams in hostile, denied, and politically sensitive areas that allows the Joint Force to be more agile and responsive. These capabilities are not currently provided by other existing SOF vertical lift aircraft. Funding supports the following CV-22 requirements: CV-22 SOF Common Terrain Following (TF)/Terrain Avoidance (TA) Silent Knight Radar (SKR), Development, Reliability Improvements, and Test Aircraft Flying Hours and Maintenance.

R-3 lines of work
  • Product Development
  • Test and Evaluation
Funding trajectory

Project SF200 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25014.5FY25ACTUAL3.3FY26ENACTED16.8FY27REQUEST42.8FY2837.3FY2939.3FY3027.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual14.5
FY2026Enacted3.3
FY2027Request16.8
FY2028Outyear42.8
FY2029Outyear37.3
FY2030Outyear39.3
FY2031Outyear27.8
Inside the project

3 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

CV-22 Development, Program Number 773▲ 813%
FY2025 actual$3.9M
FY2026 enacted$0.8M
FY2027 request$6.9M

FY2027 planned work Continues to develop a federated AbMN hardware and software system to receive, process, display, and disseminate battlespace information. Begins efforts to update Radio Frequency Countermeasures (RFCM) capabilities to meet threats in a contested environment.

FY2026 to FY2027 change Increase of $6.100 million supports continuing development of AbMN capability and updating RFCM survivability capability.

FY2026 plans — current year Continue to develop a federated AbMN hardware and software system to receive, process, display, and disseminate battlespace information.

FY2025 accomplishments Continue to develop an integrated AbMN hardware and software system to receive, process, display, and disseminate battlespace information.

SOF Common TF/TA SKR, Program Number 44Z▲ 2105%
FY2025 actual$6.1M
FY2026 enacted$0.2M
FY2027 request$5.4M

FY2027 planned work Planned activities include: Updating and enhancing OFP software; developing and integrating advanced radar weather penetrating capabilities; and correcting prioritized system Deficiency Reports (DRs) encountered during testing.

FY2026 to FY2027 change Increase of $5.199 million supports continuing efforts to fully implement SKR including but not limited to: updating OFP software, weather penetration capabilities, and correction of DRs encountered during testing.

FY2026 plans — current year Continue developing and integrating advanced radar weather penetrating capabilities.

FY2025 accomplishments Complete developmental test and evaluation of SOF Common TF/TA SKR OFP integration. Begin development of advanced radar weather penetrating capabilities.

Test Aircraft Flying Hours and Maintenance▲ 96%
FY2025 actual$4.5M
FY2026 enacted$2.3M
FY2027 request$4.5M

FY2027 planned work Continues supporting flying hours and maintaining two test CV-22 aircraft to conduct developmental flight tests.

FY2026 to FY2027 change Increase of $2.199 million supports additional testing of AbMN Beyond-Line-of-Site system and RFCM developmental testing.

FY2026 plans — current year Continue supporting flying hours and maintaining two test CV-22 aircraft to conduct developmental flight tests.

FY2025 accomplishments Continue supporting flying hours and maintaining two test CV-22 aircraft to conduct developmental flight tests.