# Project S1684 — Surface Craft

**Program element:** 1160483BB — Maritime Systems  
**Project:** S1684  
**Component:** Defense-Wide  
**Appropriation:** 0400 — RDT&E, Defense-Wide  
**Budget Activity:** 7 — Operational System Development  
**Vintage:** President's Budget PB2027  
**Canonical URL:** https://hitchintel.com/programs/1160483BB/S1684  
**Parent:** https://hitchintel.com/programs/1160483BB

## Summary

Project S1684 — Surface Craft requests $64.8M in FY2027, 18% of the $351.7M requested for program element 1160483BB, up 763% on FY2026. 8 R-2A activities decompose the request, 5 restarted this cycle.

## Funding profile

| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 33.1 |
| FY2026 | Enacted | 7.5 |
| FY2027 | Request | 64.8 |
| FY2028 | Outyear | 37.0 |
| FY2029 | Outyear | 28.5 |
| FY2030 | Outyear | 26.3 |
| FY2031 | Outyear | 27.2 |

> Estimate types are not summed. This project is one leaf of PE 1160483BB; the PE total is the sum of its projects, never added to them.

## What project S1684 buys

This project provides for the Engineering and Manufacturing Development (EMD) of combatant craft, combatant craft mission equipment, Pre-Planned Product Improvement (P3I), and technology insertion to meet the unique requirements of Special Operations Forces (SOF). This project also provides for pre-acquisition activities (materiel solutions analysis, advanced component development and prototypes) to quickly respond to new requirements for maritime craft and subsystems, leading to increased lethality and survivability of personnel and equipment. The craft capabilities and unique equipment provide small, highly trained forces the ability to successfully conduct operations associated with SOF maritime missions. The FY 2026 request for Maritime Systems includes $120.745 million of discretionary and $180.813 million of mandatory (reconciliation) funding for a total of $301.288 million.

**R-3 lines of work:** Product Development; Test and Evaluation; Management Services.

## Activities (R-2A) — 8

| Activity | FY2025 | FY2026 | FY2027 | Move | Page |
|---|---|---|---|---|---|
| Combatant Craft Medium (CCM), Program Number 818 | 18.2 | 0.0 | 43.5 | restart | [a0](https://hitchintel.com/programs/1160483BB/S1684/a0) |
| Combatant Craft Mission Equipment (CCME) | 3.3 | 0.0 | 17.8 | restart | [a2](https://hitchintel.com/programs/1160483BB/S1684/a2) |
| Combatant Craft Assault (CCA), Program Number 820 | 1.6 | 0.0 | 1.8 | restart | — |
| Combatant Craft Heavy (CCH), Program Number 819 | 1.0 | 0.0 | 1.0 | restart | — |
| Special Operations Craft Riverine (SOCR), Program Number 821 | 0.6 | 0.0 | 0.6 | restart | — |
| Maritime Precision Engagement (MPE), Program Number 671 | 2.1 | 0.0 | 0.0 | — | — |
| Combatant Craft Forward Looking Infrared (CCFLIR) Program No. 822 | 0.0 | 0.0 | 0.0 | — | — |
| Classified Program | 6.3 | 0.0 | 0.0 | — | — |

> Activities carry the prior, current and budget year only — no five-year plan. In the request year they partition this project exactly; in earlier years they can under-cover it.

### Combatant Craft Medium (CCM), Program Number 818 — RESTART

Continues the incremental design, development, and production of the CCM Mk2 EDM, to include Government engineering services, test agency support, and industry subject matter expertise.

Full year-by-year narrative: https://hitchintel.com/programs/1160483BB/S1684/a0

### Combatant Craft Mission Equipment (CCME) — RESTART

Continues ALTPNT capability development; continues the AI/ML data collection study to provide future enhancement to surface crafts; continues further development of the MMS which will integrate current and future system displays into one software suite; Continues unique power and energy capabilities such as hybrid electric propulsion…

Full year-by-year narrative: https://hitchintel.com/programs/1160483BB/S1684/a2

### Combatant Craft Assault (CCA), Program Number 820 — RESTART

**FY2027 planned work.** Continues integration and testing of MTMN and modernization efforts to reduce operational risk and ensure agility.

**FY2026 to FY2027 change.** Increase of $1.814 million supports testing of modernization efforts to reduce operational risk and ensure agility.

**FY2026 plans — current year.** Continue development, integration, and testing of Maritime Tactical Mission Network (MTMN) and modernization efforts to reduce operational risk and ensure agility. Note: FY 2026 President's Budget included $0.00 million in discretionary funding and $1.772 million in mandatory funding for CCA.

**FY2025 accomplishments.** Continue development, integration, and testing of Maritime Tactical Mission Network (MTMN) and modernization efforts to reduce operational risk and ensure agility.

### Combatant Craft Heavy (CCH), Program Number 819 — RESTART

**FY2027 planned work.** Continues development and integration of C5ISR and survivability enhancements.

**FY2026 to FY2027 change.** Increase of $1.031 million supports continued CCH survivability enhancements and signature testing.

**FY2026 plans — current year.** Continue development and integration of Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) and survivability enhancements. Note: FY 2026 President's Budget included $0.00 million in discretionary funding and $1.011 million in mandatory funding for CCH.

**FY2025 accomplishments.** Continue development and integration of C5ISR/SA and survivability enhancements.

### Special Operations Craft Riverine (SOCR), Program Number 821 — RESTART

**FY2027 planned work.** Begin prototype installation of developed C5ISR capabilities (Comms Box, TOCNET, and SEAFLIR and operator station console redesign for improved navigation display.

**FY2026 to FY2027 change.** Increase of $0.649 million supports prototype installation and testing for developed C5ISR capabilities (Comms Box, TOCNET, and SEAFLIR) and operator station console redesign for improved navigation display.

**FY2026 plans — current year.** Continue development and testing of C5ISR capabilities (Comms Box, Tactical Operations Center Network (TOCNET) and Sea Forward Looking Infrared (SEAFLIR) thermal imaging system) and craft armor replacement. Note: FY 2026 President's Budget included $0.00 million in discretionary funding and $0.637 million in mandatory funding for SOCR.

**FY2025 accomplishments.** Continue development and testing of C5ISR capabilities (Comms Box, Tactical Operations Center Network (TOCNET) and Sea Forward Looking Infrared (SEAFLIR) thermal imaging system) and craft armor replacement.

### Maritime Precision Engagement (MPE), Program Number 671

**FY2025 accomplishments.** Complete integrated development testing, and system demonstration event. Complete engineering support to establish baseline and configuration management control. Complete the final, Baseline 3, Technical Data Package (drawings) for CCM MK2

### Combatant Craft Forward Looking Infrared (CCFLIR) Program No. 822

**FY2026 plans — current year.** Begin development of Next Generation CCFLIR unit 3 (CCLFLIR 3), initiate government design study. Note: FY 2026 President's Budget included $0.00 million in discretionary funding and $2.031 million in mandatory funding for CCFLIR.

### Classified Program

**FY2025 accomplishments.** Details provided under separate cover.

## What is NOT on this page

Congressional marks, the R-2 mission description and acquisition strategy, the industry vs government split of the whole request, and related program elements are recorded at **program-element** grain — an NDAA mark lands on a PE, never on a project. They are at https://hitchintel.com/programs/1160483BB.

## Source & machine access

- **Source:** FY2027 Office of the Secretary of Defense RDT&E Budget Justification, Exhibits R-2/R-2A/R-3, PE 1160483BB project S1684 (PB PB2027).