RDT&E Project · President's Budget PB2027

Integration and Battle Management

FY2027 Request
$172.3M
▼ 56% vs FY2026
HitchAI read

Project 643729 — Integration and Battle Management requests $172.3M in FY2027, 14% of the $1.25B requested for program element 1206410SF, down 56% on FY2026. 1 R-2A activity decomposes the request.

FY2027 Request
$172.3M
▼ 56% vs FY2026
FY2026 Enacted
$391.7M
▲ 49% vs FY2025
FY2025 Actual
$262.7M
Prior year
Project detail

What project 643729 buys

SDA is rapidly developing and demonstrating next generation space capabilities for the joint warfighter enabled by proliferation of satellites in Low Earth Orbit (LEO) and expedited acquisition model utilizing rapid spiral development. SDA is developing capabilities to address a wide range of Department of War (DoW) space needs that align with the United States Space Force Space Warfighting framework and includes space-based battle management and a ground support infrastructure. SDA will orchestrate the rapid development and fielding of the Proliferated Warfighter Space Architecture (PWSA), a resilient military sensing and data transport capability via a proliferated space architecture in LEO. This program element funds the development and demonstration of space technologies to deliver space-based command and control, tasking, mission processing and dissemination capabilities, as well as an integrated, resilient network of ground support capabilities, to U.S. joint warfighting forces in bi-annual tranches, which began in FY 2022.

R-3 lines of work
  • Product Development
Funding trajectory

Project 643729 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

1002003000262.7FY25ACTUAL391.7FY26ENACTED172.3FY27REQUEST96.9FY2874.2FY2956.5FY3057.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual262.7
FY2026Enacted391.7
FY2027Request172.3
FY2028Outyear96.9
FY2029Outyear74.2
FY2030Outyear56.5
FY2031Outyear57.6
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$262.7M
FY2026 enacted$391.7M
FY2027 request$172.3M

Tranche 0 - Conduct residual experimentation in support of PWSA Risk Reduction. Tranche 1 - Sustain and continue automation of ground mission management, network management, enterprise system management capabilities to support Proliferated Warfighter Space Architecture (PWSA) operations. - Maintain Operation Centers, ground networks, and…

Read the FY2027 plan →