RDT&E Project · President's Budget PB2027

B-52 AEHF Integration

Project 671810·PE 0101113F — B-52 Squadrons·U.S. Air Force·BA7
FY2027 Request
$194.0M
▲ 958% vs FY2026
HitchAI read

Project 671810 — B-52 AEHF Integration requests $194.0M in FY2027, 13% of the $1.48B requested for program element 0101113F, up 958% on FY2026. 1 R-2A activity decomposes the request.

FY2027 Request
$194.0M
▲ 958% vs FY2026
FY2026 Enacted
$18.3M
▲ 210% vs FY2025
FY2025 Actual
$5.9M
Prior year
Project detail

What project 671810 buys

The B-52 Advanced Extremely High Frequency (AEHF) Integration satellite communications (SATCOM) system provides a survivable, low probability of intercept/detection, high bandwidth system that ensures secure intra/inter-flight and two-way command and control communications in the modern anti-access/aerial denial battle space. This communications upgrade replaces the Military Strategic and Tactical Relay (MILSTAR) Ultra High Frequency (UHF) SATCOM capability (MILSTAR is nearing system end of life) on the B-52. The AEHF Integration effort will integrate the Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Force Element Terminal (FET) onto the B-52 to provide two-way satellite communication for the B-52. Funds may be used to address requirements including, but not limited to, emerging and short-notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/ Operational Testing (OT), and safety of flight issues. Additionally, funds may accommodate Program Management Administration (PMA) and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. As AEHF Integration provides future communication growth to the B-52, emerging security/certification requirements (nuclear certification, cyber security, program protection, crypto modernization, etc.) as well as other aircraft upgrades may require studies and/or support for potential impact to AEHF. Funds will be used to conduct development and test activities. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 671810 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015005.9FY25ACTUAL18.3FY26ENACTED194.0FY27REQUEST194.2FY2881.5FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.9
FY2026Enacted18.3
FY2027Request194.0
FY2028Outyear194.2
FY2029Outyear81.5
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$5.9M
FY2026 enacted$18.3M
FY2027 request$194.0M

Continue Risk Reduction efforts and award follow-on risk reduction & EMD efforts, which will focus on completing preliminary design review with multiple contractors.