RDT&E Program Element · President's Budget PB2027

B-52 Squadrons

PE 0101113F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$1.48B
◆ Scaling +66%
HitchAI read

U.S. Air Force funding ramps 66% to a $1.48B request in FY2027, before stepping down 43% across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators added 3.4% (to $1.53B). Boeing leads the industry work.

FY2027 Request
$1,478.6M
▲ 66% vs FY2026
FY2026 Enacted
$888.2M
▼ 13% vs FY2025
FY2025 Actual
$1,019.1M
Prior year

Roll-up of 11 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $1.48B for B-52 Squadrons under RDT&E program element 0101113F, up 66% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

5001,0001,50001,019.1FY25ACTUAL888.2FY26ENACTED1,478.6FY27REQUEST1,664.6FY281,263.8FY29936.6FY30849.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1,019.1
FY2026Enacted888.2
FY2027Request1,478.6
FY2028Outyear1,664.6
FY2029Outyear1,263.8
FY2030Outyear936.6
FY2031Outyear849.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

11 projects roll up into PE 0101113F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 66% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.

Project 675160

B-52 Crypto Modernization

$2.9MFY2027 request ▲ 146%
FY2025 actual$5.3M
FY2026 enacted$1.2M
FY2027 request$2.9M
Product DevelopmentSupportManagement Services

B-52 Crypto Modernization upgrades aircraft with Mobile User Objective System (MUOS) capable ARC-210 radio systems that prevent loss of beyond line of sight (BLOS) voice and data communications capability. The program will upgrade the B-52 aircraft with secure voice and data communications via SATURN (Second Generation Anti-Jam Technical UHF Radio for NATO) network, MUOS (Mobile User Objective System) Satellite constellation, and DAMA-IW (Demand Assigned Multiple Access - Integrated Waveform) SATCOM connection. These updates are required by the National Security Agency (NSA), DoW mandates, and directives. Funds may be used to address requirements including, but not limited to, emerging and short-notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/ Operational Testing (OT), and safety of flight issues. Additionally, funds may accommodate Program Management Administration (PMA) and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. FY27 includes a New Start Program B-52 Intelligence Broadcast System (IBS) that will be split out into its own BPAC during the FY27 PB. The IBS program replaces the currently installed IBR-3 with the Joint Tactical Terminal - Next Generation (JTT-NG). The JTT-NG is a low Size, Weight, and Power (SWaP) transceiver to replace the aging fleet of JTT systems, as part of the part of the Intelligence Broadcast System. The JTT-NG will serve as the primary radio communications component of the Joint IBS enterprise that allows Warfighter access to tactical intelligence, and Indication and Warning (I&W) information during early operation or at locations where network connection is limited or being denied. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
B-52 Crypto Modernization▲ 7%
FY2025 actual$5.3M
FY2026 enacted$1.2M
FY2027 request$1.3M

FY2027 planned work Completion of EMD and Software Integration.

FY2026 to FY2027 change Increase from FY 2026 to FY 2027 is due to extension and completion of EMD and the Software Integration effort.

FY2026 plans — current year Continuation of EMD and Software Integration.

Intelligence Broadcast System (IBS)NEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$1.7M

FY2027 planned work Begin EMD efforts including the purchase of a Prototype kit, antenna hardware, and software integration development.

FY2026 to FY2027 change The increase in FY27 is due to the start of a new program (IBS)

FY2026 plans — current year N/A New Start in FY27

Project 675165

B-52 Quad Crew

$1.2MFY2027 request ▼ 88%
FY2025 actual$4.7M
FY2026 enacted$10.3M
FY2027 request$1.2M
Product DevelopmentManagement Services

The Quad Crew program reduces B-52 crew size from five to four personnel. The program will transition controls and displays for the electronic warfare system from the Electronic Warfare Officer (EWO) station to the B-52 Navigator Station supporting situational awareness, self-protection, and survivability in a contested environment and any other requirement needed to reduce the crew from five to four personnel. Funds may be used to address requirements including, but not limited to, system integration, emerging and short notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/Operational Testing (OT), and safety of flight issues. Additionally, funds may accommodate Program Management Administration (PMA) and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
B-52 Quad Crew▼ 88%
FY2025 actual$4.7M
FY2026 enacted$10.3M
FY2027 request$1.2M

FY2027 planned work Finish Engineering and Manufacturing Development activities, complete test aircraft modification. Conduct verification and testing in support of upcoming installation activities

FY2026 to FY2027 change Decrease due to EMD completion in FY27.

FY2026 plans — current year Continue Engineering and Manufacturing Development activities that will include aircraft structure and design efforts, development of aircraft technical documentation, kit development, complete critical design review, begin modification of test aircraft, and developmental/operational test.

The whole program

AEHF is funded on 2 lines across 2 appropriations

This page shows $194.0M of AEHF, 72% of the program's $270.2M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Mobile Advanced Extremely High Frequency (AEHF) Terminal (MAT)RDT&ENavy76.2
AEHF totalAir Force, Navy270.2

Lines whose title names the program. 29 further lines only mention AEHF in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$1,478.6M
House NDAA (HASC)HASC
$1,478.6M full · +$0
Senate NDAA (SASC)SASC
$1,478.6M full · +$0
House Approps (HAC-D)HAC_D
$1,529.2M +$50.6M · +3.4%
▲ $50.6M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Boeing
$980.4M · 66%
Engineering & Manufacturing Development (EMD) Phase · CPIF
Where FY2027 funding flowsShare$M
Industry primes73%1,083.3
Other / unspecified27%395.4
FY2027 request100%1,478.6
See Boeing's full federal contract ledger members
Program detail

Mission & acquisition strategy

B-52 System Improvements is a comprehensive project to facilitate future capabilities and ensure the B-52's viability in performing current and future wartime missions. The scope of work may include, but not limited to, the development of an Analysis of Alternative (AoA), studies and analyses, a Capability Development Document (CDD), and/or any other analyses or documentation necessary to establish a Program of Record (POR). Additionally, this project may include airborne integration experiments or demonstrations of emerging technologies.

The Milestone Decision Authority approved the B-52 RMP Acquisition Strategy (AS) on 13 March 2018. Per the AS, the Original Equipment Manufacturer completed radar and other supplier selections in June 2019. The team completed System Preliminary Design Review in October 2020, Milestone B in June 2021, awarded the EMD contract in June 2021, and conducted System Critical Design Review in February 2022. RMP will enter into Milestone C in June of 2026, and Developmental Flight Test will begin. RMP will wrap up its EMD effort in March of 2029.

Project 675129, 671810, 675039, 675056, 676039, 670011, 671803, 670008, 675160, 675165, 670132 — B-52 CERP
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0101113F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Boeing has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0101113F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "B-52 Squadrons (PE 0101113F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0101113F
Machine access
Markdown twin /programs/0101113F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$998.6M
▲ 68% vs FY2026
FY2026 Enacted
$595.7M
▼ 21% vs FY2025
FY2025 Actual
$753.4M
Prior year

B-52 CERP — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 675129 — B-52 CERP — requests $998.6M in FY2027, 68% of the $1.48B requested for program element 0101113F. Year over year it grows 68% against FY2026.

Funding trajectory

Project 675129 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2505007501,0000753.4FY25ACTUAL595.7FY26ENACTED998.6FY27REQUEST1,068.9FY28849.7FY29666.7FY30674.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual753.4
FY2026Enacted595.7
FY2027Request998.6
FY2028Outyear1,068.9
FY2029Outyear849.7
FY2030Outyear666.7
FY2031Outyear674.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

B-52 CERP▲ 68%
FY2025 actual$753.4M
FY2026 enacted$595.7M
FY2027 request$998.6M

Continue execution of the Post-CDR Development contract. Continue ordering hardware for two test aircraft on material contracts and deliver necessary components to modify the aircraft. Continue F130 engine integration testing. Begin modification of test aircraft.

Read the FY2027 plan →
Project 675129 — every activity in full →
Who's building it

Named performers on project 675129

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Boeing
$897.0M · 90%
AFLCMC/FZA
$21.0M · 2.1%
412TW
$15.2M · 1.5%
Rolls Royce
$12.8M · 1.3%
Project detail

What project 675129 buys

The B-52J Commercial Engine Replacement Program (CERP) supports nuclear and conventional operations by replacing the current TF33-PW-103 engine on the B-52H aircraft. The TF33-PW-103 engine is experiencing significant supportability challenges due to diminished manufacturing sources and obsolescent technologies. This program will replace the current TF33-PW-103 engine with new military derivative commercial Rolls-Royce F130 engines of similar size, weight, and thrust characteristics. Along with the new engines, CERP will replace associated subsystems, such as engine struts and nacelles, the electrical power generation system, and cockpit displays. The development, production and installation of new engines and related subsystems will replace the legacy equipment on all 76 B-52H aircraft. Any B-52H aircraft modified with the new commercial engines and associated subsystems will be designated as B-52J. B-52J CERP is taking advantage of advances in technology and on-going development efforts to acquire engines and integrate them into the B-52. The new technology will increase both the overall reliability and maintainability of the propulsion system and produce additional electrical power generation capabilities for emerging requirements. The B-52J CERP will allow the operational command (Air Force Global Strike Command) to fully utilize the capabilities of the B-52 aircraft to employ an array of nuclear and conventional weapons while increasing fuel efficiency and extending the range/loiter capabilities of the aircraft. In addition, applicable training devices must be developed, modified and/or upgraded in conjunction with the aircraft modifications. As B-52J CERP brings additional capability to the B-52, emerging security/certification requirements (nuclear hardening, cyber security, program protection, etc.) are being addressed. Several concurrent aircraft upgrades during the B-52J CERP necessitate temporary facilities or facility upgrades/modifications. In addition, the upgrades may necessitate studies be performed to determine optimal engine installation and deployment options. Additionally, funds will be used to procure long lead material and installation for test aircraft to include engines and all required associated components in the B-52J CERP configuration baseline (i.e. RMP A & B EMD kits).

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$194.0M
▲ 958% vs FY2026
FY2026 Enacted
$18.3M
▲ 210% vs FY2025
FY2025 Actual
$5.9M
Prior year

B-52 AEHF Integration — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 671810 — B-52 AEHF Integration — requests $194.0M in FY2027, 13% of the $1.48B requested for program element 0101113F. Year over year it grows 958% against FY2026.

Funding trajectory

Project 671810 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

5010015005.9FY25ACTUAL18.3FY26ENACTED194.0FY27REQUEST194.2FY2881.5FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.9
FY2026Enacted18.3
FY2027Request194.0
FY2028Outyear194.2
FY2029Outyear81.5
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$5.9M
FY2026 enacted$18.3M
FY2027 request$194.0M

Continue Risk Reduction efforts and award follow-on risk reduction & EMD efforts, which will focus on completing preliminary design review with multiple contractors.

Read the FY2027 plan →
Project 671810 — every activity in full →
Project detail

What project 671810 buys

The B-52 Advanced Extremely High Frequency (AEHF) Integration satellite communications (SATCOM) system provides a survivable, low probability of intercept/detection, high bandwidth system that ensures secure intra/inter-flight and two-way command and control communications in the modern anti-access/aerial denial battle space. This communications upgrade replaces the Military Strategic and Tactical Relay (MILSTAR) Ultra High Frequency (UHF) SATCOM capability (MILSTAR is nearing system end of life) on the B-52. The AEHF Integration effort will integrate the Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Force Element Terminal (FET) onto the B-52 to provide two-way satellite communication for the B-52. Funds may be used to address requirements including, but not limited to, emerging and short-notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/ Operational Testing (OT), and safety of flight issues. Additionally, funds may accommodate Program Management Administration (PMA) and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. As AEHF Integration provides future communication growth to the B-52, emerging security/certification requirements (nuclear certification, cyber security, program protection, crypto modernization, etc.) as well as other aircraft upgrades may require studies and/or support for potential impact to AEHF. Funds will be used to conduct development and test activities. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$126.3M
▲ 267% vs FY2026
FY2026 Enacted
$34.5M
▼ 15% vs FY2025
FY2025 Actual
$40.5M
Prior year

B-52 System Improvements — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 675039 — B-52 System Improvements — requests $126.3M in FY2027, 8.5% of the $1.48B requested for program element 0101113F. Year over year it grows 267% against FY2026.

Funding trajectory

Project 675039 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150040.5FY25ACTUAL34.5FY26ENACTED126.3FY27REQUEST169.9FY28165.8FY29176.6FY30152.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual40.5
FY2026Enacted34.5
FY2027Request126.3
FY2028Outyear169.9
FY2029Outyear165.8
FY2030Outyear176.6
FY2031Outyear152.1
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

B-52 Systems Improvements
FY2025 actual$4.5M
FY2026 enacted$0.0M
FY2027 request$0.0M
B-52 Advance Extremely High Frequency (AEHF) Integration▼ 100%
FY2025 actual$0.0M
FY2026 enacted$16.5M
FY2027 request$0.0M

$16.450M was inadvertently moved from Project 671810 B-52 AEHF Integration, please see Project 671810 for information on this effort.

Advanced Concept DemonstrationRESTART
FY2025 actual$3.9M
FY2026 enacted$0.0M
FY2027 request$1.0M

New Heavy Bomber Analysis of Alternatives. New heavy bomber analysis of alternatives will begin initial planning activities to develop key performance parameters, key system attributes, and additional performance attributes for a follow-on heavy bomber in the USAF. The FY27 work scope will include key planning activities for…

FY2025 actual
FY2026 enacted$0.0M
FY2027 request$50.3M

Engineering & Manufacturing Development (EMD) for LRASM/JASSM Integration including computational fluid dynamics, system safety, SEEK EAGLE, and software updates to successfully employ the latest variant of LRASM/JASSM. Integrating the latest variants of LRASM/JASSM onto the B-52. The activities in FY27 will include integrating the…

Read the FY2027 plan →
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$30.0M

Engineering & Manufacturing Development (EMD) for AWWP is the key for all future heavy-weight weapon capabilities for the B-52. FY2027 will address Pre-acquisition activities to structure the integration of a GFE weapon onto the AWWP. The AWWP will design, develop, integrate and field a new pylon onto the B-52 to take advantage of…

Read the FY2027 plan →
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$45.0M

Engineering & Manufacturing Development (EMD) to enable the B-52 to launch weapons currently in development. This may include hypersonic weapons too large for internal carriage capacity or other classified efforts underway. FY2027 plans begin acquisition activities to field a new heavy hypersonic weapon currently in development. Program…

Read the FY2027 plan →
Project 675039 — every activity in full →
Project detail

What project 675039 buys

B-52 System Improvements is a comprehensive project to facilitate future capabilities and ensure the B-52's viability in performing current and future wartime missions. The scope of work may include, but not limited to, the development of an Analysis of Alternative (AoA), studies and analyses, a Capability Development Document (CDD), and/or any other analyses or documentation necessary to establish a Program of Record (POR). Additionally, this project may include airborne integration experiments or demonstrations of emerging technologies. Support of the platform integration efforts are necessary to identify and resolve challenges associated with integrating multiple programs and activities planned for the B-52 fleet. Costs include any analysis, documentation, and related expenses necessary to establish a POR and support the B-52 weapon system. Additionally, other costs include, but are not limited to Program Management Administration (PMA), civilian pay expenses, rapid technology insertion, centralized support and initiatives for anticipated weapon system enhancements (to include efforts to improve weapon system operational capabilities, safety, supportability, maintainability, reliability, and total cost of ownership), emerging and short-notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/ Operational Testing (OT), safety of flight issues and to fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. Advanced Wing Weapon Pylon (AWWP) is currently within the Systems Improvement Budget Line and will be moved to a new consolidated Weapons BPAC during execution in FY27. The B-52 Advanced Pylon overcomes critical structural limitations of the 1960s-era pylon to enable carriage of next-generation, heavy-weight standoff weapons. It will dramatically increase the B-52's "magazine depth” by allowing it to carry a larger quantity of advanced munitions or single, massive payloads (20,000 lb. class). Long Range Anti-Ship Missile/ Joint Air-to-Surface Standoff Missile (LRASM/JASSM) Integration is currently within the Systems Improvement BPAC but will be moved to a new consolidated Weapons BPAC during execution in FY27. LRASM / JASM Integration integrates next-generation stealthy cruise missiles.

R-3 lines of work
  • Product Development
  • Management Services
FY2027 Request
$106.9M
▼ 30% vs FY2026
FY2026 Enacted
$153.1M
▼ 23% vs FY2025
FY2025 Actual
$200.0M
Prior year

B-52 Radar Modernization Program (RMP) — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 675056 — B-52 Radar Modernization Program (RMP) — requests $106.9M in FY2027, 7.2% of the $1.48B requested for program element 0101113F. Year over year it falls 30% against FY2026.

Funding trajectory

Project 675056 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001502000200.0FY25ACTUAL153.1FY26ENACTED106.9FY27REQUEST52.2FY2813.1FY294.1FY300.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual200.0
FY2026Enacted153.1
FY2027Request106.9
FY2028Outyear52.2
FY2029Outyear13.1
FY2030Outyear4.1
FY2031Outyear0.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$200.0M
FY2026 enacted$153.1M
FY2027 request$106.9M

Will continue Agile and incremental software code development for version 1.0; continue development flight testing; create, test, and deploy software fix releases to integration labs and development flight test aircraft; prepare for Initial Operational Test and Evaluation (IOT&E).

Read the FY2027 plan →
Project 675056 — every activity in full →
Who's building it

Named performers on project 675056

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Boeing
$83.5M · 78%
Edwards AFB
$10.4M · 9.7%
AFLCMC/FZA
$6.0M · 5.7%
AFOTEC
$1.4M · 1.3%
Project detail

What project 675056 buys

The B-52 Radar Modernization Program (RMP) supports nuclear and conventional operations by replacing the current AN/APQ-166 radar on the B-52 aircraft with the AN/APQ-188 radar. The APQ-166 system is increasingly difficult to sustain due to Diminishing Manufacturing Sources & obsolescent technologies, and the current failure rate places long-duration missions at risk. This modernization program will encompass the radar antenna array, 12 individual Line Replaceable Units (LRU), the radar control panel, and the Group A allocation that comprise the entire radar system. RMP will take advantage of advances in technology and on-going development efforts to acquire, to the maximum extent possible, previously developed radar systems and integrate them into the B-52. The use of new technology will increase both the overall reliability of the radar system and the capabilities for new missions. RMP will allow the operational command (AF Global Strike Command) to fully utilize the capabilities of the B-52 aircraft to employ an array of nuclear and conventional weapons and perform mission-essential navigation and weather avoidance functions. AF Global Strike Command approved the removal of the radome from the baseline program for considerations of cost control and satisfactory legacy radome performance. In addition, applicable training devices for the new radar subsystem must also be developed, modified, and/or upgraded in conjunction with the aircraft modifications. This modification includes the installation of Engineering and Manufacturing Development (EMD) kits on two B-52 test aircraft to support Developmental/Operational Test and Evaluation (DT/OT). This program upgrades one B-52 Software Integration Lab (SIL) with radar functionality and builds a new Radar Development Lab and a new Radar SIL. Additionally, this program will develop a desktop training tool.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$17.9M
▲ 39% vs FY2026
FY2026 Enacted
$12.8M
▲ 654% vs FY2025
FY2025 Actual
$1.7M
Prior year

B-52 Airspace Compliance — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 676039 — B-52 Airspace Compliance — requests $17.9M in FY2027, 1.2% of the $1.48B requested for program element 0101113F. Year over year it grows 39% against FY2026.

Funding trajectory

Project 676039 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2501.7FY25ACTUAL12.8FY26ENACTED17.9FY27REQUEST23.8FY2828.0FY2910.5FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.7
FY2026Enacted12.8
FY2027Request17.9
FY2028Outyear23.8
FY2029Outyear28.0
FY2030Outyear10.5
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$1.7M
FY2026 enacted$12.8M
FY2027 request$17.9M

Airspace Compliance plans to continue B-52/R-EGI software development, with delivery of B-52/R-EGI software load (May 2027); program to award B-52 M-Code EMD contract and initiate EMD activities (May 2027)

Read the FY2027 plan →
Project 676039 — every activity in full →
Project detail

What project 676039 buys

The B-52 Airspace Compliance Program ensures the B-52 meets regulatory Airspace Compliance, DoW and FAA mandates by integrated required hardware, software and firmware. Integrates a new Global Positioning System that provides advanced encryption to prevent spoofing and increases jamming protection for the fleet. This also includes the new Global Positioning System (GPS) Military Code (M-Code) signal design that provides a robust signal for the B-52 Fleet, enhancing Anti-Jam/Anti-Spoof capabilities and improving security to the GPS data message as military applications, technology, and mission requirements evolve. The scope of work may include, but not limited to studies and analyses, and/or any additional analyses or documentation necessary to establish a Programs of Record (POR) the meet mandated functions. Funds may also be used to address emerging and short-notice Diminishing Manufacturing and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/Operational Testing (OT), safety of flight issues, and associated components of the B-52 baseline configurations. DMSMS efforts may include removal of end-of-life/obsolete software and hardware due to the future emergence of Modular Open Systems Approach (MOSA) implementation. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F

R-3 lines of work
  • Product Development
  • Support
  • Management Services
FY2027 Request
$13.5M
▲ 115% vs FY2026
FY2026 Enacted
$6.3M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

ARC-260 — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 670011 — ARC-260 — requests $13.5M in FY2027, 0.9% of the $1.48B requested for program element 0101113F. Year over year it grows 115% against FY2026.

Funding trajectory

Project 670011 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL6.3FY26ENACTED13.5FY27REQUEST6.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted6.3
FY2027Request13.5
FY2028Outyear6.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

B-52 ARC-260▲ 115%
FY2025 actual$0.0M
FY2026 enacted$6.3M
FY2027 request$13.5M

Program will continue EMD phase and complete SRR, PDR, and CDR with subsequent Milestone C decision planned in 2QFY27.

Project 670011 — every activity in full →
Project detail

What project 670011 buys

The B-52 ARC-260 program replaces a legacy HF radio with a modernized radio to ensure Beyond Line of Sight (BLOS) communications in a satellite denied environment. The legacy ARC-190 legacy radio is end of life (EOL) and is no longer procurable with increasing sustainment phase-out through FY31. The scope of the work includes, but is not limited to, the replacement of the existing ARC-190 system with an ARC-260 Radio Set Control (RSC) and Receiver/Transmitter (R/T). The current program intent is to reuse the existing HF antenna/coupler and reuse Group A items to the maximum extent. The ARC-260 will be integrated into the B-52 platform to improve HF voice communications and take full advantage of the HF Automatic Link Establishment (ALE) capabilities. The ARC-260 radio integration on the B-52 aircraft is essential to maintaining BLOS communications and improving mission capabilities well into the future. Funds may be used to address requirements including, but not limited to, emerging and short-notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/ Operational Testing (OT), and safety of flight issues. Additionally, funds may accommodate Program Management Administration (PMA) and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$10.8M
▲ 618% vs FY2026
FY2026 Enacted
$1.5M
▼ 2.8% vs FY2025
FY2025 Actual
$1.6M
Prior year

B-52 AFMC Test Assets — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 671803 — B-52 AFMC Test Assets — requests $10.8M in FY2027, 0.7% of the $1.48B requested for program element 0101113F. Year over year it grows 618% against FY2026.

Funding trajectory

Project 671803 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.6FY25ACTUAL1.5FY26ENACTED10.8FY27REQUEST12.5FY283.1FY293.1FY303.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.6
FY2026Enacted1.5
FY2027Request10.8
FY2028Outyear12.5
FY2029Outyear3.1
FY2030Outyear3.1
FY2031Outyear3.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$1.6M
FY2026 enacted$1.5M
FY2027 request$10.8M

Will continue to provide funding for the test aircraft, manpower, BMDAS, and facilities at the Air Force Test Center, Edwards AFB. This will support the developmental testing, facility, and sustainment needs of the B-52 test assets.

Read the FY2027 plan →
Project 671803 — every activity in full →
Who's building it

Named performers on project 671803

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

AFTC
$10.8M · 100%
Project detail

What project 671803 buys

The B-52 AFMC Test Assets project will provide funding for the test aircraft, manpower, and facilities at the Air Force Test Center located at Edwards AFB, California. The project will support the development testing and Bomber Modular Data Acquisition System (BMDAS) integration on B-52 test aircraft. The project can support Programmed Depot Maintenance (PDM) costs supporting test aircraft modifications occurring at Tinker AFB, OK. Costs include, but are not limited to, any analysis, documentation, and related expenses necessary to establish a program of record and support the B-52 weapon system. Additionally, other costs include Program Management Administration (PMA) and centralized support and initiatives for anticipated weapon system enhancements (to include efforts to improve weapon system operational capabilities, safety, supportability, maintainability, reliability, and total cost of ownership). Funds may be used to address requirements including, but not limited to, emerging and short notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT), and safety of flight issues. Additionally, funds may accommodate PMA and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F.

R-3 lines of work
  • Test and Evaluation
FY2027 Request
$6.0M
▼ 27% vs FY2026
FY2026 Enacted
$8.2M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Resilient Operation Capability Suite — one RDT&E project inside PE 0101113F. Congressional marks are recorded on the program element, not on a project.

Project 670008 — Resilient Operation Capability Suite — requests $6.0M in FY2027, 0.4% of the $1.48B requested for program element 0101113F. Year over year it falls 27% against FY2026.

Funding trajectory

Project 670008 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL8.2FY26ENACTED6.0FY27REQUEST23.2FY2839.7FY2939.7FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted8.2
FY2027Request6.0
FY2028Outyear23.2
FY2029Outyear39.7
FY2030Outyear39.7
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

B-52 ROCS▼ 27%
FY2025 actual$0.0M
FY2026 enacted$8.2M
FY2027 request$6.0M

FY2027 planned work Plan to continue EMD contract, complete design reviews, and purchase additional test assets.

FY2026 to FY2027 change Decrease from FY2026 to FY2027 due to a reduction of Discretionary efforts. The FY2027 ROCS efforts will be addressed with Mandatory funding.

FY2026 plans — current year Plan to complete an Acquisition Strategy Plan (ASP) and start program at MS B. Plan to award EMD contract and purchase communications/computer test assets to begin system integration lab test activities.

Who's building it

Named performers on project 670008

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Tinker AFB
$4.9M · 82%
SIL Tinker AFB
$1.0M · 17%
Project detail

What project 670008 buys

In response to urgent warfighter needs, the Resilient Operational Capability Suite (ROCS) program connects B-52 to the Department of the Air Force (DAF) Battle Management Network (BMN) to bring resilient and reliable Beyond Line-Of-Sight (BLOS) capability and an open computing environment. The program will install antennas, aerial networked, software defined radio communications with embedded cryptography, aircraft integration/computing interfaces, and aircrew peripheral devices on the B-52 aircraft. The aircraft integration, testing, and installation includes Group A components such as an equipment rack, mounts, and wiring needed to connect B-52 to the BMN system of systems enabling robust, aerial network connectivity and data dissemination. The ROCS program will start with an interim, limited capabilities solution to fill an Air Force Bombers urgent need and then transition to permanent solution with two spirals. The ROCS system shortens the long range kill chain decision cycle, enables in-flight mission objective changes and enhance communications in an open computing environment allowing faster integration of adjacent capabilities to meet mission requirements such as Alternate Position, Navigation, and Timing (PNT), Digital High Frequency (HF) (ARC-260) BLOS Communications, Directional Line-Of-Sight waveforms, and SATURN enhanced data rate (SEDR) waveforms. Costs include, but are not limited to, any analysis, documentation, and related expenses necessary to establish a program of record and support the B-52 weapon system. Additionally, other costs include Program Management Administration (PMA) and centralized support and initiatives for anticipated weapon system enhancements (to include efforts to improve weapon system operational capabilities, safety, supportability, maintainability, reliability, and total cost of ownership). Funds may be used to address requirements including, but not limited to, emerging and short-notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for aircraft and associated training systems, Development Testing (DT), and safety of flight issues. Additionally, funds may accommodate PMA and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services