R-2A Activity · President's Budget PB2027

Arming and Fuzing Development

Activity a1·Project 3097 — W-93 / Mk 7·PE 0101221N·U.S. Navy
FY2027 Request
$279.7M
▲ 81% vs FY2026
HitchAI read

This activity requests $279.7M in FY2027, 33% of project 3097, up 81% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$279.7M
▲ 81% vs FY2026
FY2026 Enacted
$154.9M
▲ 60% vs FY2025
FY2025 Actual
$96.9M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3097 of PE 0101221N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Transition to Phase 3 Development Work with DOE CDR. - Complete RB design maturation and AF&F development cycle one builds with continuing requirements development and systems evaluation testing. - Execute Follow-on Commander's Evaluation Test (FCET)-9 program including systems evaluation testing and component level design documents. - Manufacture components for Product Realization Teams (PRTs) including Application-Specific Integrated Circuit (ASIC) development, qualification on legacy components. - Execute Initial Development Builds at Kansas City National Security Campus (KCNSC) and develop tester designs, tooling, and fixtures while procuring raw materials and Commercial off the Shelf (COTS) hardware. - Procure Mod11 parts and ASIC tester equipment to establish testing and repair capability. - Support NNSA Conceptual Design Reviews and Baseline Design Reviews for subcomponents. - Complete assembly of Development Warhead Flight (DWF-1) body for second developmental flight and begin DWF-1 data analysis following FCET-9 - Complete assembly of MK7 second DOW flight test body, (DEV-3), and begin DEV-3 analysis following FCET-9 - Complete assembly of MK7 flight test bodies DEV-4, DWF-2, and DWF-3 in FY27 for FCET-10 in early FY 2028

FY2026 to FY2027 change

The requested $124.756 million funding increase is required for the transition from Phase 2A technology maturation to Phase 3 full-scale engineering development. This funding will support Product Realization Team component manufacturing and Initial Development Builds at the Kansas City National Security Campus, which requires specialized tooling, fixtures, and the procurement of long-lead items like Mod11 parts and ASIC testers. A primary effort involves the assembly of multiple flight test bodies (DWF and DEV series) for the FCET-9 and FCET-10 developmental flight tests, along with the subsequent data analysis in collaboration with DOE labs. The increased funding also supports the mature design development of future flight test units. Additional details are held at a higher classification level.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Continue to mature technologies and down select where needed for entry into future Phase 3. - Finalize and deliver the comprehensive WDCR, providing a definitive baseline for the projected costs associated with the W93/Mk7 system. - Continue design and assembly efforts for Development Warhead Flight-0 (DWF-0) test body in FY 2026. - Provide detailed cost breakdowns for A&F system engineering and integration activities that clearly delineate Navy funded scope. - Conduct the DOE System Requirements Review (SRR) and Conceptual Design Review (CDR) in FY 2026.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

50100150200250096.9FY25ACTUAL154.9FY26ENACTED279.7FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual96.9
FY2026Enacted154.9
FY2027Request279.7

This activity is 33% of project 3097's FY2027 request and 27% of PE 0101221N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

5 activities in project 3097

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0101221N, project 3097 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0101221N/3097/a1.md · MCP mcp.hitchintel.combudget_get_activity