Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Navy is requesting $1.05B for Strategic Sub & Wpns Sys Supt under RDT&E program element 0101221N, up 27% over FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 326.6 |
| FY2026 | Enacted | 828.3 |
| FY2027 | Request | 1,051.7 |
| FY2028 | Outyear | 1,190.1 |
| FY2029 | Outyear | 1,307.0 |
| FY2030 | Outyear | 1,287.8 |
| FY2031 | Outyear | 1,313.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 7 — Operational System Development.
4 projects roll up into PE 0101221N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 27% overall, which can hide much larger swings below.
Technical Applications Programs
Integrated Nuclear Weapons Security Sys Dev
Congressional Adds
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Industry primes | 77% | 813.7 |
| Government labs & warfare centers | 9.3% | 98.3 |
| Other / unspecified | 13% | 139.8 |
| FY2027 request | 100% | 1,051.7 |
Mission & acquisition strategy
Trident II D5 Modernization (D5LE2): The Trident II D5LE2 program is crucial for modernizing the U.S. nuclear triad's submarine-launched ballistic missile (SLBM) leg, as the current D5LE system on OHIO-class submarines will become obsolete for the COLUMBIA class through 2084. D5LE2 will address aging components and evolving peer threats by providing a modernized SLBM system with comparable range and accuracy, enhanced adaptability and resilience, and key upgrades in architecture, avionics, guidance, flight structures, and post-boost controls, while leveraging existing viable components and prioritizing critical technologies like radiation-hardened electronics and advanced guidance systems…
TRIAD: Acquisition will involve a mix of contracts and funding sent directly to government partners. As appropriate, contracts will be awarded to those sources who were engaged in program and are currently engaged in the production and/or operational support on the basis of Other Than Full and Open Competition pursuant to the authority of 10 U.S.C. 2304 (c) (1) and (3) implemented by FAR 6.302.-1, 3, 4 INWSS Development: Acquisition will be executed through a combination of private contractors (large and small business) and a robust government technical enterprise.
- Product Development
- Support
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what LMS has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0101221N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksW-93 / Mk 7 — one RDT&E project inside PE 0101221N. Congressional marks are recorded on the program element, not on a project.
Project 3097 — W-93 / Mk 7 — requests $841.2M in FY2027, 80% of the $1.05B requested for program element 0101221N. Year over year it grows 36% against FY2026.
Project 3097 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 259.7 |
| FY2026 | Enacted | 618.8 |
| FY2027 | Request | 841.2 |
| FY2028 | Outyear | 974.5 |
| FY2029 | Outyear | 1,102.0 |
| FY2030 | Outyear | 1,101.6 |
| FY2031 | Outyear | 1,123.6 |
5 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- Prepare for the execution of FCET-10 (FY 2028) and FCET-11 (FY 2029) developmental flight test programs, encompassing hardware manufacturing and test execution readiness activities. - Complete Gen 5 hardware manufacturing, begin Gen 6 development manufacturing, and initiate Gen 7 conceptual design for FCET-11 testing. - Revise and…
Read the FY2027 plan →- Transition to Phase 3 Development Work with DOE CDR. - Complete RB design maturation and AF&F development cycle one builds with continuing requirements development and systems evaluation testing. - Execute Follow-on Commander's Evaluation Test (FCET)-9 program including systems evaluation testing and component level design documents…
Read the FY2027 plan →- Integrate Mk7 capability into Fire Control system including software updates, system modifications, performance parameter integration, and interface requirements development. - Update Fire Control targeting algorithms, databases, and Mission Planning systems to accommodate Mk7 reentry body characteristics, trajectory planning, and…
Read the FY2027 plan →- Execute full-scale software development and missile system engineering for W93/Mk7 integration with all variants of the SWS. - Update Fire Control/Missile/Reentry performance characteristics and missile system requirements to accommodate Mk7 capabilities and specifications. - Execute FCET-9 flight test with Mk7 development test bodies…
Read the FY2027 plan →- Execute systems engineering and integration at SWS-level including requirements management, architecture integration, verification and validation, and coordinated interface analyses for W93/Mk7. - Support major system-level milestone reviews. - Conduct Weapon System Impact reviews and analyses including Strategic Weapons System Program…
Read the FY2027 plan →Named performers on project 3097
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 3097 buys
The W93/Mk7 warhead project (3097) will provide the US Navy with a third submarine launched ballistic missile (SLBM) warhead variant, enhancing flexibility in managing the nuclear stockpile. Designed to meet STRATCOM requirements and maintain a credible sea-based deterrent, the W93/Mk7 incorporates advanced technology to address emerging threats. W93/Mk7 will provide opportunities to improve the current force by delivering the President flexible options to deter or limit conflict. The W93/Mk7 is being designed to allow for modifications if needed to adapt to the changing threat environment. This project also reinforces the US commitment to supporting the UK's independent nuclear deterrent. Critical early investments are required for the development of critical skills and recapitalization of the atrophied industrial base. The U.S. has not delivered an integrated ballistic reentry system since the 1980s. The program will align to the President's priority of strengthening our Nation's manufacturing and defense industrial base while improving supply chain resiliency and reducing reliance on foreign countries. In order to manage the development, production, maintenance, and retirement of W93/Mk7, the Department of War (DoW) and Department of Energy (DOE) / National Nuclear Security Administration (NNSA) will utilize the DoW-DOE/NNSA Nuclear Weapons Lifecycle Process (Phase X). Phase X process is a joint effort which provides a common framework to conduct and manages phased activities: Phase 1 - Concept Assessment, Phase 2 - Feasibility Study and Design Options, Phase 2A - Design Definition and Cost Study, Phase 3 - Development Engineering, Phase 4 - Production Engineering, Phase 5 - First Production, Phase 6 - Full-Scale Production/Sustainment, Phase 7 - Retirement, Dismantlement, and Disposal. W93/Mk7 Program entered Phase 2A in March 2025. Progress and accomplishments achieved between Phase 1 and Phase 2A include the following: - Early efforts primarily consisted of developing programmatic planning and structure to support the future program along with further exploration and refinement of the concept studies that resulted from the Feasibility Management Team Study, which was directed in the 2018 Nuclear Posture Review (NPR).
- Product Development
- Support
- Test and Evaluation
Technical Applications Programs — one RDT&E project inside PE 0101221N. Congressional marks are recorded on the program element, not on a project.
Project 2228 — Technical Applications Programs — requests $210.5M in FY2027, 20% of the $1.05B requested for program element 0101221N. Year over year it grows 14% against FY2026.
Project 2228 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 51.4 |
| FY2026 | Enacted | 185.2 |
| FY2027 | Request | 210.5 |
| FY2028 | Outyear | 215.6 |
| FY2029 | Outyear | 205.0 |
| FY2030 | Outyear | 186.2 |
| FY2031 | Outyear | 190.0 |
6 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Trident II D5 Modernization (D5LE2): The RDT&E efforts listed for D5LE2 system level requirements and architecture efforts will complete in FY 2026 with stable technical baselines for subsystem development and procurement to execute going forward. System Level Studies and Architecture Development efforts: Refinement of system…
Funding for mission effectiveness is allocated across both unclassified and classified efforts. The unclassified portion, totaling $38.769 million, includes the following tasks: - Expand and continue efforts on Halcyon: Radar and algorithm integration for upcoming test flight - Continue efforts on Non-Line of Sight free-space optical…
Read the FY2027 plan →All efforts will continue from FY 2026 in addition to: - Begin the expansion of NAV/Guidance Integrated Gravity Enhancement efforts, including temporary alteration (TEMPALT) for Capability III, to calibrate guidance accelerometers at sea or at un-surveyed port locations - Begin the modernization of the Navigation Sonar System (NSS) by…
Read the FY2027 plan →- Building upon our FY 2026 foundation, expand the utilization of high fidelity simulation environments and integrated threat system models to evaluate the performance of current and emerging threats against a broader spectrum of potential technologies considered for maturation. - As part of the Transit Protection Program (TPP), begin…
Read the FY2027 plan →All efforts will continue from FY 2026 in addition to: - Begin the development of a Compact Boost Rocket Motor Chemical Sensor (CBRMCS) for advanced health monitoring to collect data and infer stabilizer content from the propellant in a solid rocket motor assembly - Begin enhancements for Missile Segment Mating in the Missile Assembly…
Read the FY2027 plan →Continued efforts from Project 3158: Integrated Nuclear Weapon Security System (INWSS): - Continue the development and deployment of the Electronic Security System (ESS) Alarm Control and Display (AC&D) Integration to Bangor for Limited Area security, based on FY 2026 lessons learned - Continue the Development and Testing for the ESS to…
Named performers on project 2228
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.
What project 2228 buys
Trident II D5 Modernization (D5LE2): The Trident II D5LE2 program is crucial for modernizing the U.S. nuclear triad's submarine-launched ballistic missile (SLBM) leg, as the current D5LE system on OHIO-class submarines will become obsolete for the COLUMBIA class through 2084. D5LE2 will address aging components and evolving peer threats by providing a modernized SLBM system with comparable range and accuracy, enhanced adaptability and resilience, and key upgrades in architecture, avionics, guidance, flight structures, and post-boost controls, while leveraging existing viable components and prioritizing critical technologies like radiation-hardened electronics and advanced guidance systems within a modular architecture to ensure a credible, survivable, and adaptable sea-based deterrent for decades. Threat & Risk-Informed Advanced Development (TRIAD): The Threat & Risk-Informed Advanced Development program leverages technological advancements, coordinates advanced research across stakeholders, and collaborates with government and industry partners to identify and outpace future threats to the nation's Sea-based Strategic Deterrent. Specific RDT&EN investments will aim to (1) preserve Trident II D5LE missile strategic weapon system (SWS) survivability against current and future threats; (2) respond to warfighter demands at the speed of relevance by enhancing effectiveness and capabilities in accordance with USSTRATCOM and Navy priorities; and (3) ensure the sustainment of the SWS demonstrated performance through 2084. Between 1955 and 1990, consistent investment in Research and Development (R&D) fueled the success of the Strategic Weapons System (SWS) through a series of development and production programs. However, unlike previous transitions between SLBM systems (A1, A2, A3, C3, C4), development of a Trident D5 follow-on was not immediately initiated. This resulted in a significant decline in R&D funding for submarine-launched ballistic missile (SLBM) systems in the early 1990s. Additionally as the U.S. shifted towards a nuclear force sustainment paradigm, investments in advanced delivery system capabilities to counter emerging threats were curtailed. Consequently, the pipeline for developing cutting-edge technologies has weakened considerably.
- Product Development
Integrated Nuclear Weapons Security Sys Dev — one RDT&E project inside PE 0101221N. Congressional marks are recorded on the program element, not on a project.
Project 3158 — Integrated Nuclear Weapons Security Sys Dev — requests $0.0M in FY2027, 0.0% of the $1.05B requested for program element 0101221N. Year over year it falls 100% against FY2026.
Project 3158 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 3.1 |
| FY2026 | Enacted | 3.1 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Efforts continue in Project 2228 for FY 2027.
FY2026 to FY2027 change Funds realigned to Project 2228 starting in FY 2027.
FY2026 plans — current year Integrated Nuclear Weapon Security Systems: - Electronic Security System (ESS) Alarm Control and Display (AC&D) Development: Conduct operational test and development of ESS AC&D system. - Common Operational Picture (COP): Initial research, development, test, and evaluation of tactical situational awareness capabilities deployed to maneuver security forces. - Touch Table Tool (TTT): Conduct development and testing of technology in order to work towards transition of system to sustainment within the SSP enterprise. Transit Protection Program: - N/A Counter Unmanned Systems: - Conduct development, test, and evaluation of Electronic Warfare sensors for the Sense and Interdict (SENSEI) Afloat…
What project 3158 buys
Funding in FY 2027 has been realigned to Project 2228. This budget supports the research, development, testing, and evaluation of new technologies across multiple domains - Integrated Nuclear Weapons Security Systems (INWSS), Submarine Transit Protection Program (TPP), and Counter Unmanned Systems (C-UXS) - to significantly increase the mission effectiveness in protecting Navy Strategic Assets. This directly supports the National Defense Strategy's priorities of maintaining a credible nuclear deterrent and defending the homeland, by enhancing the security and survivability of critical assets. Specifically, funding is allocated within these technological areas to upgrade security systems to reduce cybersecurity vulnerabilities, increase detection ranges, and improve response options, thereby improving the ability to deter, detect, delay, deny, and/or defeat adversaries, and ensure continuity between nuclear weapon security and operational missions. This is critical because INWSS development efforts directly support the Nuclear Weapons Surety (NWS) program and the Transit Protection Program (TPP), as outlined in DoDM S-5210.41. Current security systems are increasingly vulnerable to advanced drone swarms sophisticated underwater intrusion tactics necessitating these upgrades to maintain an effective deterrent. Within the Department of the Navy, these efforts are focused on TRIDENT Fleet Ballistic Missiles (FBM) deployed aboard Ballistic Missile submarines or stored at Strategic Weapons Facilities in Kings Bay and Bangor. The Chief of Naval Operations (CNO) has assigned Strategic Systems Programs (SSP) the mission responsibility for safeguarding these FBM nuclear assets, including land-side and pier operations for storage, loading, and unloading, as well as security and protection of SSBNs during transit to and from their dive point. Each of these environments presents unique security challenges to personnel and currently fielded NWS security systems, making these upgrades essential to SSP's responsibility to the Nuclear Deterrence Mission. These upgrades will directly benefit SSP security personnel and Strategic Weapons Facility commanders at Kings Bay and Bangor by providing them with enhanced situational awareness, improved threat response capabilities, and increased mission effectiveness.
- Product Development
Congressional Adds — one RDT&E project inside PE 0101221N. Congressional marks are recorded on the program element, not on a project.
Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $1.05B requested for program element 0101221N. Year over year it falls 100% against FY2026.
Project 9999 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 12.4 |
| FY2026 | Enacted | 21.2 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
What project 9999 buys
- FY 2025 Congressional add for security monitoring at maritime chokepoints will evaluate a network of passive seismic and hydroacoustic phased arrays to determine its effectiveness in detecting, classifying, localizing, and tracking hostile submarines and unmanned underwater vehicles (UUVs). This assessment should focus on the system's ability to counter covert threats posed to ballistic missile submarines (SSBNs) while transiting critical maritime chokepoints or during port visits. FY 2026 Congressional adds for the following efforts: - Navigation Research and Development Center (NRDC) Facility Modernization funding includes the upgrade and expansion of critical Warminster, PA facility. This modernization will expand the facility by providing state-of-art infrastructure to accelerate R&D, rapid prototyping, test and evaluation capabilities for autonomous, advanced, and strategic weapon systems. These capabilities are essential for Navy strategic objectives to support future strategic defense solutions, critical test capabilities, faster fielding of technologies to meet pacing threats, and modernize innovation and collaboration with Government and industry partners. These investments will foster innovation, attract a talented workforce, and ensure a long-term commitment to the strategic readiness. - Strategic Systems Supply Chain Management will bolster the Strategic Defense Industrial Base (SDIB), mitigate supply chain vulnerabilities, and accelerate the development of high-priority national security systems. This initiative will enhance industrial readiness by optimizing the Conventional Prompt Strike (CPS) transition to fielding, assessing vendor viability for the Sea-Launched Cruise Missile-Nuclear (SLCM-N), and investing in emerging propulsion and guidance technologies to maintain a decisive technological advantage. Foundational to this effort is enterprise-level analysis to support strategic sourcing, targeted workforce development, and key acquisition reforms that stabilize demand signals across the industrial base. The execution of these tasks is vital to reducing production risks for our most critical defense programs, ensuring the timely delivery of advanced capabilities to the warfighter, and maintaining our nation's strategic deterrent.
- Product Development