What the FY2027 request buys
Verbatim from the R-2A exhibit for project 674609 of PE 0303131F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.
Continue further development with Prime Contractor - Hold System Requirements Review (SRR) and System Functional Review (SFR) - Conduct Preliminary Design Review (PDR) - Conduct analysis to design VLF receiver for new waveform - Conduct analysis to integrate new VLF receiver waveform with existing hardware/software - Conduct prototyping of new VLF receiver waveform - Conduct integration testing with existing system - Conduct EHF software architecture maintenance to integrate future ESS
MMP SLEP is an FY27 New Start.
Three years, and no five-year plan
An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 11.4 |
This activity is 100% of project 674609's FY2027 request and 4.5% of PE 0303131F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.
1 activity in project 674609
Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.