RDT&E Program Element · President's Budget PB2027

Minimum Essential Emergency Communications Network (MEECN)

PE 0303131F·U.S. Air Force·Approp. 3600 — RDT&E·BA7 — Operational System Development
FY2027 Request
$254.8M
⚑ Contested — House approps cuts 31%
HitchAI read

U.S. Air Force funding ramps 159% to a $254.8M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators cut 31% (to $176.7M). RTX / Raytheon leads the industry work.

FY2027 Request
$254.8M
▲ 159% vs FY2026
House approps mark
$176.7M
▼ $78.1M vs request
FY2026 Enacted
$98.5M
In law

Roll-up of 9 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $254.8M for Minimum Essential Emergency Communications Network (MEECN) under RDT&E program element 0303131F, up 159% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $176.7M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

100200300400024.8FY25ACTUAL98.5FY26ENACTED254.8FY27REQUEST368.5FY28402.9FY29413.9FY30296.8FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual24.8
FY2026Enacted98.5
FY2027Request254.8
FY2028Outyear368.5
FY2029Outyear402.9
FY2030Outyear413.9
FY2031Outyear296.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

9 projects roll up into PE 0303131F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 159% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.

Project 672832

MEECN System Improvements

$0.0MFY2027 request ▼ 99%
FY2025 actual$1.1M
FY2026 enacted$1.1M
FY2027 request$0.0M
Product DevelopmentSupport

MSI is a long-range planning effort with users [Air Force Global Strike Command (AFGSC), Air Combat Command (ACC), United States Space Force (USSF), Air Mobility Command (AMC), Air Force Special Operations Command (AFSOC), US Strategic Command (USSTRATCOM), and the US Navy] to monitor and assess the performance of existing NC3 systems and develop recommendations for strategic and tactical architecture upgrades, requirements, and issues based on available and emerging technologies. MSI is used to conduct technology testing; model performance; analyze technology strategies; conduct requirement trade space analyses, technology maturation and risk reduction efforts, mission analysis; and build technology Roadmaps as proactive support to the NC3 community. MSI performs analysis, integration, and testing activities for the NC3 Weapon System. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
MEECN System Improvements▼ 99%
FY2025 actual$1.1M
FY2026 enacted$1.1M
FY2027 request$0.0M

FY2027 planned work - Complete the annual 2026 MSI Summary Report - Finalize analysis of the performance/condition of prototype Very Low Frequency (VLF) configuration on KC-46 tankers - Finalize analysis of the performance/condition of prototype Very Low Frequency (VLF) configuration on KC-135 tankers

FY2026 to FY2027 change Decrease due to reduction of studies and Roll On/Roll Off (RORO) Very Low Frequency (VLF) capability development moving out of the MEECN Program Element into KC-135 Program 0401218F

FY2026 plans — current year - Complete the annual 2025 MSI Summary Report - Conduct analysis of the performance/condition of prototype Very Low Frequency (VLF) configuration on KC-46 tankers - Conduct analysis of the performance/condition of prototype Very Low Frequency (VLF) configuration on KC-135 tankers - Conduct analysis and identify means of improving transmission and receipt of Very Low Frequency (VLF) messages in NC3 exercise events - Conduct analysis and identify potential Very Low Frequency (VLF) transmit and receive capabilities of existing antennas by modifying existing aircraft and ICBM installation designs and leveraging novel electromagnetic effects to enhance performance of existing antennas - Conduct…

The whole program

ICBM is funded on 8 lines across 3 appropriations

This page shows $15.8M of ICBM, 6.2% of the program's $255.5M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
ICBM FUZE MODProcurementAir Force169.7
ICBM Guidance ApplicationsRDT&EAir Force28.4
ICBM Reentry Vehicle ApplicationsRDT&EAir Force22.2
ICBM Command & Control (C2) ApplicationsRDT&EAir Force19.3
ICBM FUZE SUPPORTRDT&EAir Force0.0
Install WasteWater "Force" Main, ICBM RoadMILCONAir Force
Install Water Main, ICBM RoadMILCONAir Force
ICBM totalAir Force255.5

Lines whose title names the program. 22 further lines only mention ICBM in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$254.8M
House NDAA (HASC)HASC
$254.8M full · +$0
Senate NDAA (SASC)SASC
$254.8M full · +$0
House Approps (HAC-D)HAC_D
$176.7M −$78.1M · −31%
▲ $78.1M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

RTX / Raytheon
$116.8M · 46%
FAB-T CPT Prime Contract
General Dynamics
$9.3M · 3.6%
Block 1 Product Development · CPIF
Where FY2027 funding flowsShare$M
Industry primes52%131.4
Government labs & warfare centers1.9%4.7
Other / unspecified47%118.7
FY2027 request100%254.8
See RTX / Raytheon's full federal contract ledger members
Program detail

Mission & acquisition strategy

Nuclear Deterrence Operations (NDO) is an Air Force Core Function. Within this core function, Nuclear Command and Control (NC2) is the exercise of authority and direction by the President, as Commander in Chief, through established command lines, over nuclear weapon operations of military forces. The President's authority and direction are exercised through the Nuclear Command and Control System (NCCS).

FAB-T FET Acquisition Strategy: Per the Acquisition Strategy Panel briefed to SAF/AQ on February 7, 2019, FAB-T FET pursued a Rapid Prototyping development Middle Tier of Acquisition approach of the National Defense Authorization Act for FY 2016. This Rapid Prototyping program enabled FAB-T FET to accelerate the nominal program development timeline in support of an accelerated USSTRATCOM-requested Initial Operating Capability. FAB-T FET awarded a development effort on January 16, 2020, to develop, build, and test prototypes and test terminals. This Rapid Prototyping effort enabled FAB-T FET to develop, install, and obtain test data from early B-52 FAB-T FET prototypes which will also have residual operations capability.

Project 673040, 676030, 672835, 672490, 676029, 673041, 674609, 673035, 672832 — Force Element Terminal
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0303131F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what RTX / Raytheon has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0303131F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Minimum Essential Emergency Communications Network (MEECN) (PE 0303131F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0303131F
Machine access
Markdown twin /programs/0303131F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$81.3M
▲ 22% vs FY2026
FY2026 Enacted
$66.7M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Force Element Terminal — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 673040 — Force Element Terminal — requests $81.3M in FY2027, 32% of the $254.8M requested for program element 0303131F. Year over year it grows 22% against FY2026.

Funding trajectory

Project 673040 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25507500.0FY25ACTUAL66.7FY26ENACTED81.3FY27REQUEST41.6FY2843.2FY2944.9FY3046.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted66.7
FY2027Request81.3
FY2028Outyear41.6
FY2029Outyear43.2
FY2030Outyear44.9
FY2031Outyear46.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FAB-T FET▲ 22%
FY2025 actual$0.0M
FY2026 enacted$66.7M
FY2027 request$81.3M

Funding is for the continued development of FETs and ESS Development. FAB-T FET integration and testing activities will include reliability growth testing and fabrication of test assets; test terminals will support terminal security, environmental, and functional testing, to include flight testing, and early integration efforts. Planning…

Read the FY2027 plan →
Project 673040 — every activity in full →
Who's building it

Named performers on project 673040

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$65.4M · 80%
Project detail

What project 673040 buys

The Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Force Element Terminal (FET) program is not a New Start in FY 2026. FAB-T FET was transferred from Space Force (PE 1203001SF / Project 673040 / Appropriation 3620 / Research, Development, Test, and Evaluation) to Air Force (PE 0303131F / Project 673040 / Appropriation 3600 / Research, Development, Test, and Evaluation), Transfer Memo signed 12 Nov 2024. The FAB-T FET program replaces the Ultra High Frequency (UHF) Milstar terminal and provides secure, protected, and survivable communications for the strategic warfighter through airborne-based Military Satellite Communication (MILSATCOM) terminals. The FAB-T FET will provide worldwide nuclear and non-nuclear, survivable, anti-jam Low Probability of Detect (LPD)/ Low Probability of Intercept (LPI) data. The FAB-T FET will be interoperable with Advanced Extremely High Frequency (AEHF), Enhanced Polar Systems - Recapitalization (EPS-R), and Evolved Strategic SATCOM (ESS) satellite constellations and will be installed on the B-52 aircraft (threshold). FAB-T FET was designated as a Middle Tier of Acquisition (MTA) in February 2019 and in January 2026 was designated as a Major Capability Acquisition (MCA) with closure of the MTA program. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
FY2027 Request
$49.4M
▲ 281% vs FY2026
FY2026 Enacted
$13.0M
▲ 13% vs FY2025
FY2025 Actual
$11.4M
Prior year

Global ASNT Inc 2 — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 676030 — Global ASNT Inc 2 — requests $49.4M in FY2027, 19% of the $254.8M requested for program element 0303131F. Year over year it grows 281% against FY2026.

Funding trajectory

Project 676030 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150011.4FY25ACTUAL13.0FY26ENACTED49.4FY27REQUEST110.7FY28184.8FY29137.9FY3060.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual11.4
FY2026Enacted13.0
FY2027Request49.4
FY2028Outyear110.7
FY2029Outyear184.8
FY2030Outyear137.9
FY2031Outyear60.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$11.4M
FY2026 enacted$13.0M
FY2027 request$49.4M

Block 1: Vibration testing (Continued) Block 1: Functional Configuration Audit/Physical Configuration Audit Block 2: Prepare and release Request for Proposal Block 2: Conduct Technology Maturation and Risk Reduction activities Block 2: Develop initial prototype

Read the FY2027 plan →
Project 676030 — every activity in full →
Who's building it

Named performers on project 676030

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

General Dynamics
$9.3M · 19%
96 TW
$1.8M · 3.7%
Booz Allen
$0.4M · 0.8%
Project detail

What project 676030 buys

Global Aircrew Strategic Network Terminal Increment 2 (Inc 2) replaces aging legacy strategic communications equipment at bomber and tanker Wing Command Posts (WCPs), Nuclear Task Forces, Munitions Support Squadrons (MUNSS), and Mobile Support Teams (MSTs). Global ASNT Inc 2 is a ground-based system that will provide survivable, secure communication paths to disseminate Emergency Action Messages (EAMs) to bomber and tanker aircrews. Global ASNT Inc 2 is being fielded in 2 separate capability incremental blocks; both blocks are High-Altitude Electro-Magnetic Pulse (HEMP) and Radiation Hazard (RADHAZ) protected. Global ASNT Inc 2 Block 1 delivers a replacement Aircrew Alerting System (AAS) consisting of Ultra High Frequency (UHF) personal and general alerting equipment replacing Electromagnetic Pulse Hardened Dispersal Communication (EHDC) and Aircrew Alerting Communications Electromagnetic Pulse (AACE) systems. Global ASNT Inc 2 Block 2 provides High Frequency (HF) Beyond Line of Sight (BLOS) capabilities for fixed ground and transportable units to communicate with bomber and tanker aircraft, and emerging NC3 platforms out of range of Ultra High Frequency (UHF) Line of Sight (LOS). Air Force Global Strike Command approved a requirements document in December 2023 for Global ASNT Inc 2 Block 2. This program element may include necessary revised Security Classification Guide (SCG) implementation activities. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$47.7M
▲ 168% vs FY2026
FY2026 Enacted
$17.8M
▲ 45% vs FY2025
FY2025 Actual
$12.3M
Prior year

Common VLF/LF Receiver Inc 2 — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 672835 — Common VLF/LF Receiver Inc 2 — requests $47.7M in FY2027, 19% of the $254.8M requested for program element 0303131F. Year over year it grows 168% against FY2026.

Funding trajectory

Project 672835 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075012.3FY25ACTUAL17.8FY26ENACTED47.7FY27REQUEST60.3FY2812.9FY2981.1FY3054.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual12.3
FY2026Enacted17.8
FY2027Request47.7
FY2028Outyear60.3
FY2029Outyear12.9
FY2030Outyear81.1
FY2031Outyear54.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

CVR Inc 2▲ 168%
FY2025 actual$12.3M
FY2026 enacted$17.8M
FY2027 request$47.7M

- Award delivery order incentive contracts to two qualified vendors to begin Prime Contract development work - Hold System Requirements Review (SRR) and System Functional Review (SFR)

Read the FY2027 plan →
Project 672835 — every activity in full →
Who's building it

Named performers on project 672835

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Cost
$2.3M · 4.9%
96th Test Wing
$0.5M · 1.1%
Project detail

What project 672835 buys

The Common Very Low Frequency/Low Frequency (VLF/LF) Receiver (CVR) Increment 2 (CVRi2) Program will develop and produce a modular open systems approach (MOSA), Cryptographic Modernization 2.0 (CM-2), New VLF Waveform (WF) compliant advanced VLF/LF receiver for all ground and airborne NC3 platforms. As the USAF VLF receiver integrator, the VLF Enterprise Program Office (VLF EPO) will continue to be responsible for VLF receiver sustainment, to include configuration management of the CVR Increment 1 (CVRi1) materiel solution (KGR-72) and sustainment of legacy receivers, while also providing management support to the B-52 VLF Modernization Program for its procurement and production of the directed VLF receiver (KGR-72). The VLF EPO will provide management and engineering support for VLF receiver requirements across legacy and emerging NC3 platforms. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$31.0M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

FAB-T CPT — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 672490 — FAB-T CPT — requests $31.0M in FY2027, 12% of the $254.8M requested for program element 0303131F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 672490 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25507500.0FY25ACTUAL0.0FY26ENACTED31.0FY27REQUEST71.2FY2881.8FY2935.4FY3011.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request31.0
FY2028Outyear71.2
FY2029Outyear81.8
FY2030Outyear35.4
FY2031Outyear11.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FAB-T CPT Production Restart and ModificationNEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$31.0M

This funding is for an existing contract that has been executing since 2024 with SAOC funding: UCA/ APR Restart Contract FA8735-21-D-0001, Delivery Order FA229324FB004. The requirement is a continuation of the SAOC effort to restart the FAB-T production line. Activities will also include mitigations to address Diminishing Manufacturing…

Project 672490 — every activity in full →
Who's building it

Named performers on project 672490

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$31.0M · 100%
Project detail

What project 672490 buys

The Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Command Post Terminal (CPT) program was transferred from Space Force (Program 1203001SF / Project 672490 / Appropriation 3620 / Research, Development, Test, and Evaluation) to Air Force (Program 0303131F / Project 672490 / Appropriation 3600 / Research, Development, Test, and Evaluation), Transfer Memo. The FAB-T CPT project replaces legacy Milstar (AFCPT) terminals and will provide Extremely High Frequency (EHF) protected high data rate communication for nuclear and conventional forces to include Presidential and National Voice Conferencing (PNVC). FAB-T CPT will provide this new, highly secure, state-of-the-art capability for Department of War (DoW) platforms to include strategic platforms and airborne/ground command posts via Advanced EHF (AEHF) and Evolved Strategic Satellite Communications (ESS) satellite constellations. FAB-T CPTs will also support the critical command and control (C2) of the AEHF and ESS satellite constellations. The Department of the Air Force (DAF) will continue development of the FAB-T CPT, performing systems engineering, architecture studies, development and operational test efforts, terminal interoperability with the full AEHF satellite constellation activities, and other program activities to meet current and future emerging Satellite Communication (SATCOM) requirements. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
FY2027 Request
$18.0M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Global Aircrew Strategic Network Terminal — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 676029 — Global Aircrew Strategic Network Terminal — requests $18.0M in FY2027, 7.1% of the $254.8M requested for program element 0303131F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 676029 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.0FY26ENACTED18.0FY27REQUEST16.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request18.0
FY2028Outyear16.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Global ASNT Inc 1 ModernizationNEW
FY2025 actual$0.0M
FY2026 enacted
FY2027 request$18.0M

- Release ESS Software Development, Integration & Test Request for Proposal (RFP) - Begin NSA Certification efforts - Award ESS Software Development, Integration & Test Contract

Project 676029 — every activity in full →
Who's building it

Named performers on project 676029

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$12.1M · 67%
NSA, Maryland
$0.2M · 1.1%
Project detail

What project 676029 buys

Global Aircrew Strategic Network Terminal Increment 1 (Global ASNT Inc 1) system replaces inadequate, unsustainable strategic communications equipment at bomber and tanker Wing Command Posts (WCPs), Munitions Support Squadrons (MUNSS), and Mobile Support Teams (MSTs). The system supports Nuclear Response CONOPS to produce operational outcomes supporting Global Force Management, Global Defense, Information Transport, Information Assurance, and Space Force operations. Global ASNT Inc 1 systems provide 24 hours, 7 days per week survivable, redundant communication links for the Command and Control of Nuclear Task Forces (NTF) by the President through the National Military Command System, with advice from the Secretary of War, Combatant Commanders, and associated senior leadership. To ensure interoperability with the Evolved Strategic Satellite Communication system, the Global ASNT Inc 1 system needs to modernize its hardware and software suite to enable continued protected survivable communications services with high availability receipt and relay of Emergency Action Messages at United States Air Force NTF, WCPs, MUNSS, and MST. Additionally, the Global ASNT Inc 1 system must continue to operate and survive during all phases of chemical, biological, and radiological conflicts or incidents. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
FY2027 Request
$15.8M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

ICBM MEECN Terminals (IMT) — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 673041 — ICBM MEECN Terminals (IMT) — requests $15.8M in FY2027, 6.2% of the $254.8M requested for program element 0303131F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 673041 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25507510012500.0FY25ACTUAL0.0FY26ENACTED15.8FY27REQUEST44.8FY2855.2FY2996.7FY30124.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request15.8
FY2028Outyear44.8
FY2029Outyear55.2
FY2030Outyear96.7
FY2031Outyear124.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted$0.0M
FY2027 request$15.8M

Work to be accomplished during the next FY includes, but is not limited to, standing up the program office to support the initial development activities of the IMT program, develop the acquisition and contract strategy, assist AFGSC in requirements development, conduct market research and award studies to evaluate industry capabilities…

Read the FY2027 plan →
Project 673041 — every activity in full →
Project detail

What project 673041 buys

ICBM MEECN Terminal (IMT) will provide resilient Nuclear Command, Control, and Communications capabilities for the Intercontinental Ballistic Missile (ICBM) Forces. IMT will deliver an integrated NC3 suite which includes Extremely High Frequency (EHF) capabilities and an open architecture-based framework. This framework will enable faster and extensible capabilities integration and upgrades for other communication pathways. IMT will integrate the Common Very Low Frequency (VLF) Receiver (CVR). For ICBM risk reduction, IMT will prepare for integration with ICBM weapon systems. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
FY2027 Request
$11.4M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Minuteman MEECN Program - Service Life Extension Program (MMP-SLEP) — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 674609 — Minuteman MEECN Program - Service Life Extension Program (MMP-SLEP) — requests $11.4M in FY2027, 4.5% of the $254.8M requested for program element 0303131F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 674609 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL0.0FY26ENACTED11.4FY27REQUEST24.0FY2825.0FY2918.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request11.4
FY2028Outyear24.0
FY2029Outyear25.0
FY2030Outyear18.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted$0.0M
FY2027 request$11.4M

Continue further development with Prime Contractor - Hold System Requirements Review (SRR) and System Functional Review (SFR) - Conduct Preliminary Design Review (PDR) - Conduct analysis to design VLF receiver for new waveform - Conduct analysis to integrate new VLF receiver waveform with existing hardware/software - Conduct prototyping…

Read the FY2027 plan →
Project 674609 — every activity in full →
Who's building it

Named performers on project 674609

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$8.0M · 70%
Project detail

What project 674609 buys

The Minuteman Minimum Essential Emergency Communication Network (MEECN) Program (MMP) Service Life Extension Program (SLEP) will enable the legacy MMP System that is beyond end-of-life to continue to provide Intercontinental Ballistic Missile (ICBM) Forces with a survivable link for reception of Emergency Action Messages (EAMs) from the President and Secretary of War (SECWAR). MMP is a Command and Control (C2) system directly supporting the Chairman of the Joint Chiefs of Staff in the National Command Center and the Strategic Nuclear Command Centers. MMP provides super high-frequency (SHF) down-link/extremely high-frequency (EHF) up-link and very low-frequency (VLF)/low-frequency (LF) messaging support for Minuteman III ICBM Launch Control Centers (LCCs). The MMP SLEP is needed to support the Minuteman III weapon system, beyond its expected service life of 2030. The significant delay to the Sentinel requires life extension program of the current Minuteman III system, and subsystems that include MMP. Diminishing Manufacturing Sources and Material Shortages (DMSMS) have resulted in spare parts being in short supply. Without a SLEP, access to MMP spare parts will become increasing difficult, resulting in extended system downtime and high repair costs. The MMP operational availability will continue to decrease, and future modifications will not be addressed creating a significant gap in capability, further reducing our nation's nuclear deterrence. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development
  • Support
FY2027 Request
$0.3M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Presidential and National Voice Conferencing — one RDT&E project inside PE 0303131F. Congressional marks are recorded on the program element, not on a project.

Project 673035 — Presidential and National Voice Conferencing — requests $0.3M in FY2027, 0.1% of the $254.8M requested for program element 0303131F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 673035 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.0FY26ENACTED0.3FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request0.3
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

PNVC IntegratorNEW
FY2025 actual
FY2026 enacted
FY2027 request$0.3M

FY2027 planned work The PNVC Integrator will continue to conduct integration and checkout activities and continue to work closely with the applicable sustainment organizations. PNVC Integrator activities will include, but are not limited, to deficiency resolution, logistics and sustainment support planning, component product support, platform integration, and integration of laboratory support.

FY2026 to FY2027 change Increase accounts for transition of program from United States Space Force (USSF) to United States Air Force (USAF).

Who's building it

Named performers on project 673035

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

RTX / Raytheon
$0.3M · 100%
Project detail

What project 673035 buys

The Presidential and National Voice Conferencing (PNVC) Integrator program was transferred from Space Force (Program 1203001SF / Project 673035 / Appropriation 3620 / Research, Development, Test, and Evaluation) to Air Force (Program 0303131F / Project 673035 / Appropriation 3600 / Research, Development, Test, and Evaluation), Transfer Memo. The Presidential and National Voice Conferencing (PNVC) Integrator project is a critical element of the Nuclear Command, Control, and Communications (NC3) System. PNVC integrator replaces the Survivable Emergency Conferencing Network (SECN) capability, and will provide anti-jam, anti-scintillation, survivable, and enduring voice communications via Milstar, Advanced EHF, and ESS satellite constellations for national and strategic users. There are several components being developed, procured and updated by other organizations that must be synchronized to expeditiously field this capability. The PNVC Integrator is responsible for end-to-end integration of these components, to include requirements traceability, end-to-end system testing, configuration and checkout activities, training and technical manuals, network transition support, identification of deficiencies in overall PNVC system capability, enterprise, and life cycle support for PNVC components. The AFPEO/SP approved entry into the acquisition life-cycle as a post MS-A Acquisition Category (ACAT) III Program of Record in January 2016. In March 2019 the AFPEO/NC3 declared the PNVC Integrator an ACAT II Program based on updated approved budget request. Starting in December 2018, PNVC Integrator became responsible for the funding requests of all program elements related to the Defense Information Systems and Agency (DISA) components of the PNVC System in accordance with FY 2018 National Defense Authorization Act, Sec. 1661. In October 2021, PNVC completed Milestone B/C. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.

R-3 lines of work
  • Product Development