Global Aircrew Strategic Network Terminal Increment 2 (Inc 2) replaces aging legacy strategic communications equipment at bomber and tanker Wing Command Posts (WCPs), Nuclear Task Forces, Munitions Support Squadrons (MUNSS), and Mobile Support Teams (MSTs). Global ASNT Inc 2 is a ground-based system that will provide survivable, secure communication paths to disseminate Emergency Action Messages (EAMs) to bomber and tanker aircrews. Global ASNT Inc 2 is being fielded in 2 separate capability incremental blocks; both blocks are High-Altitude Electro-Magnetic Pulse (HEMP) and Radiation Hazard (RADHAZ) protected. Global ASNT Inc 2 Block 1 delivers a replacement Aircrew Alerting System (AAS) consisting of Ultra High Frequency (UHF) personal and general alerting equipment replacing Electromagnetic Pulse Hardened Dispersal Communication (EHDC) and Aircrew Alerting Communications Electromagnetic Pulse (AACE) systems. Global ASNT Inc 2 Block 2 provides High Frequency (HF) Beyond Line of Sight (BLOS) capabilities for fixed ground and transportable units to communicate with bomber and tanker aircraft, and emerging NC3 platforms out of range of Ultra High Frequency (UHF) Line of Sight (LOS). Air Force Global Strike Command approved a requirements document in December 2023 for Global ASNT Inc 2 Block 2. This program element may include necessary revised Security Classification Guide (SCG) implementation activities. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F.
- Product Development
- Support
- Test and Evaluation
- Management Services
Project 676030 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 11.4 |
| FY2026 | Enacted | 13.0 |
| FY2027 | Request | 49.4 |
| FY2028 | Outyear | 110.7 |
| FY2029 | Outyear | 184.8 |
| FY2030 | Outyear | 137.9 |
| FY2031 | Outyear | 60.1 |
1 accomplishment / planned program
The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.
Block 1: Vibration testing (Continued) Block 1: Functional Configuration Audit/Physical Configuration Audit Block 2: Prepare and release Request for Proposal Block 2: Conduct Technology Maturation and Risk Reduction activities Block 2: Develop initial prototype
Read the FY2027 plan →Named performers on project 676030
Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.