RDT&E Project · President's Budget PB2027

Expeditionary Campaign

Project 1510·PE 0602123N — Force Protection Applied Res·U.S. Navy·BA2
FY2027 Request
$10.7M
◆ New start in FY2027
HitchAI read

Project 1510 — Expeditionary Campaign requests $10.7M in FY2027, 7.8% of the $137.8M requested for program element 0602123N — a new start, with no prior-year and no current-year money. 1 R-2A activity decomposes the request, 1 new this cycle.

New start

This project requests $10.7M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

FY2027 Request
$10.7M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year
Project detail

What project 1510 buys

This project addresses applied research associated with providing the capability of Platform and Force Protection for Expeditionary Forces. It supports the development of technologies associated with all naval platforms (surface, subsurface, terrestrial, and air) and the protection of those platforms. Research is focused on providing technologically superior defense of naval assets and delivering warfighting capabilities at reduced total ownership costs for surface and subsurface platforms through investments in applied research in Power, Energy, Propulsion, Engineering, and Design. This project develops technologies for reducing detectable signatures, while enhancing the mission effectiveness of naval platforms (surface, subsurface, terrestrial, and air) through improvements in platform range, responsiveness, survivability, observability, readiness, safety and life cycle cost. The project addresses technology development that provides substantial performance improvements in energetic material systems and subsystems, while addressing safety, reliability, and affordability concerns.

Funding trajectory

Project 1510 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.0FY26ENACTED10.7FY27REQUEST12.2FY2812.4FY2912.6FY3012.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request10.7
FY2028Outyear12.2
FY2029Outyear12.4
FY2030Outyear12.6
FY2031Outyear12.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$10.7M

Explosive Hazard Defeat in Expeditionary Warfare: Continue: - Design and development of modular compact sensors and automated algorithms to rapidly assess, analyze, and report damage to infrastructure for repair following an attack or natural disaster particularly damage to runways, roads, piers, utilities, and buildings. - Research to…

Read the FY2027 plan →