RDT&E Program Element · President's Budget PB2027

Force Protection Applied Res

PE 0602123N·U.S. Navy·Approp. 1319 — RDT&E·BA2 — Applied Research
FY2027 Request
$137.8M
Navy · RDT&E
HitchAI read

U.S. Navy funding falls 43% to a $137.8M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House added 5.4% (to $145.3M); the Senate funded it in full; House appropriators added 37% (to $188.3M).

FY2027 Request
$137.8M
▼ 43% vs FY2026
FY2026 Enacted
$243.1M
▲ 33% vs FY2025
FY2025 Actual
$183.2M
Prior year

Roll-up of 4 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $137.8M for Force Protection Applied Res under RDT&E program element 0602123N, down 43% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

501001502000183.2FY25ACTUAL243.1FY26ENACTED137.8FY27REQUEST148.2FY28154.0FY29154.1FY30156.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual183.2
FY2026Enacted243.1
FY2027Request137.8
FY2028Outyear148.2
FY2029Outyear154.0
FY2030Outyear154.1
FY2031Outyear156.4
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 2 — Applied Research.

Current
Research
BA 1–2
Later
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

4 projects roll up into PE 0602123N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -43% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$137.8M
House NDAA (HASC)HASC
$145.3M +$7.5M · +5.4%
Senate NDAA (SASC)SASC
$137.8M full · +$0
House Approps (HAC-D)HAC_D
$188.3M +$50.5M · +37%
▲ $50.5M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

America is a maritime nation with global responsibilities that require U.S. naval forces be respected around the world and decisive when it matters. The Office of Naval Research (ONR) was established to guide ongoing research to ensure the technical superiority of the U.S. Navy and Marine Corps. This Program Element (PE) addresses applied research associated with providing the capability of Platform and Force Protection for the U.S. Navy. This program supports the development of technologies associated with all naval platforms (surface, subsurface, terrestrial, and air) and the protection of those platforms.

Project 0000, 1510, 3270, 9999 — Force Protection Applied Res
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0602123N is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0602123N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Force Protection Applied Res (PE 0602123N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0602123N
Machine access
Markdown twin /programs/0602123N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$127.1M
▲ 1.1% vs FY2026
FY2026 Enacted
$125.7M
▲ 11% vs FY2025
FY2025 Actual
$113.4M
Prior year

Force Protection Applied Res — one RDT&E project inside PE 0602123N. Congressional marks are recorded on the program element, not on a project.

Project 0000 — Force Protection Applied Res — requests $127.1M in FY2027, 92% of the $137.8M requested for program element 0602123N. Year over year it grows 1.1% against FY2026.

Funding trajectory

Project 0000 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550751001250113.4FY25ACTUAL125.7FY26ENACTED127.1FY27REQUEST136.0FY28141.7FY29141.4FY30143.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual113.4
FY2026Enacted125.7
FY2027Request127.1
FY2028Outyear136.0
FY2029Outyear141.7
FY2030Outyear141.4
FY2031Outyear143.6
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$26.1M
FY2026 enacted$31.5M
FY2027 request$30.2M

AERODYNAMICS Continue: - Advanced computational methods for fully coupled aerodynamic interface between ships and aircraft - Reduced-order modeling of complex flow fields enabling real-time, high-fidelity simulations of ship-based aircraft operations - Flow field manipulation and control for air vehicles in maritime environments - In…

Read the FY2027 plan →
Fleet Force Protection and Defense Against Undersea Threats▲ 142%
FY2025 actual$2.1M
FY2026 enacted$2.1M
FY2027 request$5.1M

- Continue efforts in Materials for Advanced Sensor Technology. The focus of these efforts is to demonstrate at pertinent scale and environment of the performance of advanced materials and innovative processing techniques, which include sensor and data analysis capabilities for enhanced situational awareness for platform protection…

FY2025 actual$5.5M
FY2026 enacted$5.1M
FY2027 request$10.9M

Continue: - Computational studies of reaction pathways in terms of mechanistic and kinetic details to guide energetic materials synthesis and scale up development. - Research focused on new reactive material formulations and configurations for warhead use. New consolidated effort towards high performing explosive oxidizer materials…

Read the FY2027 plan →
FY2025 actual$70.3M
FY2026 enacted$75.0M
FY2027 request$68.2M

Power & Energy Technologies, includes the following: -Alternative Fuels -Power Distribution & Control -Design Tool development -Thermal Management Technology -Energy Storage -Power Generation - Complete applied research in Medium Voltage Direct Current (MVDC) electrical architectures to reduce risk on future platforms. - Complete…

Read the FY2027 plan →
FY2025 actual$9.4M
FY2026 enacted$12.0M
FY2027 request$12.6M

- Continue three-year projects selected in FY2026 to further develop and maintain the Science and Engineering workforce by providing funding to Naval Warfare Centers and Laboratories to foster high risk/ high reward applied research initiatives of Naval interest. Each Naval site conducts peer reviews for existing research projects…

Read the FY2027 plan →
Project 0000 — every activity in full →
Project detail

What project 0000 buys

This project addresses applied research associated with providing the capability of Platform and Force Protection for the U.S. Navy. It supports the development of technologies associated with all naval platforms (surface, subsurface, terrestrial, and air) and the protection of those platforms. Research is focused on providing technologically superior defense of naval assets and delivering warfighting capabilities at reduced total ownership costs for surface and subsurface platforms through investments in applied research in Power, Energy, Propulsion, Engineering, and Design. This project develops technologies for reducing detectable signatures, while enhancing the mission effectiveness of naval platforms (surface, subsurface, terrestrial, and air) through improvements in platform range, responsiveness, survivability, observability, readiness, safety and life cycle cost. The project addresses technology development that provides substantial performance improvements in energetic material systems and subsystems, while addressing safety, reliability, and affordability concerns. This project is broken out into five primary areas of study: Aircraft Technology, Fleet Force Protection and Defense Against Undersea Threats, Advanced Energetics, Surface Ship and Submarine Hull Mechanical & Electrical (HM&E), and Naval Research Enterprise/Innovation Operations.

FY2027 Request
$10.7M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Expeditionary Campaign — one RDT&E project inside PE 0602123N. Congressional marks are recorded on the program element, not on a project.

Project 1510 — Expeditionary Campaign — requests $10.7M in FY2027, 7.8% of the $137.8M requested for program element 0602123N. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 1510 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.0FY26ENACTED10.7FY27REQUEST12.2FY2812.4FY2912.6FY3012.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request10.7
FY2028Outyear12.2
FY2029Outyear12.4
FY2030Outyear12.6
FY2031Outyear12.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$10.7M

Explosive Hazard Defeat in Expeditionary Warfare: Continue: - Design and development of modular compact sensors and automated algorithms to rapidly assess, analyze, and report damage to infrastructure for repair following an attack or natural disaster particularly damage to runways, roads, piers, utilities, and buildings. - Research to…

Read the FY2027 plan →
Project 1510 — every activity in full →
Project detail

What project 1510 buys

This project addresses applied research associated with providing the capability of Platform and Force Protection for Expeditionary Forces. It supports the development of technologies associated with all naval platforms (surface, subsurface, terrestrial, and air) and the protection of those platforms. Research is focused on providing technologically superior defense of naval assets and delivering warfighting capabilities at reduced total ownership costs for surface and subsurface platforms through investments in applied research in Power, Energy, Propulsion, Engineering, and Design. This project develops technologies for reducing detectable signatures, while enhancing the mission effectiveness of naval platforms (surface, subsurface, terrestrial, and air) through improvements in platform range, responsiveness, survivability, observability, readiness, safety and life cycle cost. The project addresses technology development that provides substantial performance improvements in energetic material systems and subsystems, while addressing safety, reliability, and affordability concerns.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$1.2M
Prior year

Sec. 2912 Operational Energy Savings — one RDT&E project inside PE 0602123N. Congressional marks are recorded on the program element, not on a project.

Project 3270 — Sec. 2912 Operational Energy Savings — requests $0.0M in FY2027, 0.0% of the $137.8M requested for program element 0602123N.

Funding trajectory

Project 3270 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.2FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.2
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Operational Energy Savings
FY2025 actual$1.2M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 3270 buys

This project addresses applied research associated with providing the capability of Platform and Force Protection for the U.S. Navy. It supports the development of technologies associated with all naval platforms (surface, subsurface, terrestrial, and air). Research is focused on providing technologically superior defense of naval assets and delivering warfighting capabilities at reduced total ownership costs for surface and subsurface platforms through investments in applied research in Power and Energy.

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$117.4M
▲ 71% vs FY2025
FY2025 Actual
$68.5M
Prior year

Congressional Adds — one RDT&E project inside PE 0602123N. Congressional marks are recorded on the program element, not on a project.

Project 9999 — Congressional Adds — requests $0.0M in FY2027, 0.0% of the $137.8M requested for program element 0602123N. Year over year it falls 100% against FY2026.

Funding trajectory

Project 9999 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100068.5FY25ACTUAL117.4FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual68.5
FY2026Enacted117.4
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Project detail

What project 9999 buys

Congressional add projects not included in other efforts.