RDT&E Program Element · President's Budget PB2027

Data Transport and Networking

PE 1203156SF·U.S. Space Force·Approp. 3620F — RDT&E·BA7 — Operational System Development
FY2027 Request
$165.0M
Space Force · RDT&E
◆ New start in FY2027 — no prior-year funding
HitchAI read

U.S. Space Force requests $165.0M in FY2027 against nothing enacted in FY2026 — the program's peak. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. sev1Tech leads the industry work.

FY2027 Request
$165.0M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Space Force is requesting $165.0M for Data Transport and Networking under RDT&E program element 1203156SF, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

5010015000.0FY25ACTUAL0.0FY26ENACTED165.0FY27REQUEST133.2FY28135.3FY29137.8FY30140.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request165.0
FY2028Outyear133.2
FY2029Outyear135.3
FY2030Outyear137.8
FY2031Outyear140.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

3 projects roll up into PE 1203156SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

The whole program

ORION is funded on 3 lines across 2 appropriations

This page shows $34.8M of ORION, 100% of the program's $34.8M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Integrated Operations NetworkingRDT&ESpace Force0.0
Curious OrionRDT&ENavy0.0
ORION totalNavy, Space Force34.8

Lines whose title names the program. 8 further lines only mention ORION in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$165.0M
House NDAA (HASC)HASC
$165.0M full · +$0
Senate NDAA (SASC)SASC
$165.0M full · +$0
House Approps (HAC-D)HAC_D
$165.0M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

sev1Tech
$43.0M · 26%
Cyber Secure Mission Data Transport · Various
Booz Allen
$4.2M · 2.6%
Enterprise Systems Engineering and Integration (SE&I) · CPIF
Where FY2027 funding flowsShare$M
Industry primes29%47.2
Government labs & warfare centers2.0%3.3
Other / unspecified69%114.5
FY2027 request100%165.0
See sev1Tech's full federal contract ledger members
Program detail

Mission & acquisition strategy

Space Systems Command is developing the Unified Data Library (UDL), meshOne-Terrestrial (M1T), and Integrated Operations Networking (ION) projects for Guardians across warfighting, operations commands, combat support, and combat service support units. As a result, the Service will improve battle management of all weapon systems; deliver space domain awareness capabilities; improve readiness and operational reach of existing force structure; deter, neutralize, defeat and/or destroy counterspace threats and defend the homeland; augment, supplement, and/or integrate Allies, partners, and commercial space to USSF units; continue to advance all near term effects; and achieve resilient…

The meshONE-T acquisition strategy seeks to implement new, tailored mission data transport services for USSF and other DoW mission partners. The approach addresses warfighter needs for a cyber-secure network presence at key operational locations around the globe to enable inter- and intra-mission, producer-to consumer, and sensor-to-shooter data flows. This strategy continued the prototype M1T effort to establish an Enterprise USSF mission data transport capability beyond the (purposeful) limitations of the prototype effort through a a non-competitive, 5-year follow-on development and deployment Other Transaction Agreement (OTA) awarded in FY 2024 using a combination of Cost and Fixed Price contract strategies.

Project 673941, 673944, 673945 — Unified Data Library (UDL)
  • Product Development
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 1203156SF is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what sev1Tech has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1203156SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Data Transport and Networking (PE 1203156SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1203156SF
Machine access
Markdown twin /programs/1203156SF.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$74.3M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Unified Data Library (UDL) — one RDT&E project inside PE 1203156SF. Congressional marks are recorded on the program element, not on a project.

Project 673941 — Unified Data Library (UDL) — requests $74.3M in FY2027, 45% of the $165.0M requested for program element 1203156SF. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 673941 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25507500.0FY25ACTUAL0.0FY26ENACTED74.3FY27REQUEST75.8FY2877.1FY2978.6FY3080.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request74.3
FY2028Outyear75.8
FY2029Outyear77.1
FY2030Outyear78.6
FY2031Outyear80.2
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted
FY2027 request$74.3M

Modernize the UDL to support a truly federated data architecture that offers enhanced scalability and flexibility for the Joint Force and allies. This modern architecture will enable the UDL to increase the data volume and number of data sources as new commercial sensors and systems are integrated into the SDA ecosystem. This…

Read the FY2027 plan →
Project 673941 — every activity in full →
Project detail

What project 673941 buys

This is not a New Start. FY 2025-2026 UDL funds are allocated in the Space Situation Awareness Operations (SSAO) Program Element (PE) 1203940SF and in FY2027+ UDL funds transferred to a new Program Element (PE) 1203156SF, Project 673941, Unified Data Library (UDL). The UDL project (673941) supports integration, exploitation, and delivery of Space Domain Awareness (SDA) and other space-related data sources for C2 and battle management of space forces. It focuses on enabling data sharing, establishing the data architecture required to aggregate multi-sensor data for broader use at different classification levels, transforming any-source data into normalized, usable information via data exploitation tools, followed by data handoff to Battle Management Command and Control mission systems to support actual space operations. The UDL will directly connect to dedicated USSF collateral, contributing and non-traditional sensors and systems with modernized interfaces and transport options to broadly expose data. The UDL will be the single source for accessing and managing all data in support of the USSF, providing a central location to find and access data, enabling superior analytics.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
FY2027 Request
$55.9M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

meshONE-T (M1T) — one RDT&E project inside PE 1203156SF. Congressional marks are recorded on the program element, not on a project.

Project 673944 — meshONE-T (M1T) — requests $55.9M in FY2027, 34% of the $165.0M requested for program element 1203156SF. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 673944 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255000.0FY25ACTUAL0.0FY26ENACTED55.9FY27REQUEST57.3FY2858.2FY2959.3FY3060.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request55.9
FY2028Outyear57.3
FY2029Outyear58.2
FY2030Outyear59.3
FY2031Outyear60.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted
FY2027 request$55.9M

Continue to enhance and expand the meshONE-T network to provide secure, scalable, and reliable communication for mission data transport. Continue deploying nodes, network upgrades, and capabilities in key theaters (INDOPACOM, NORTHCOM,EUCOM, and CENTCOM) to improve kill-chain effectiveness and ground resilience. Finalize the Rapid…

Read the FY2027 plan →
Project 673944 — every activity in full →
Who's building it

Named performers on project 673944

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

sev1Tech
$43.0M · 77%
Booz Allen
$4.2M · 7.6%
Project detail

What project 673944 buys

This is not a new start. In FY 2027, Cyber Secure Mission Data Transport, known as meshONE-Terrestrial or meshONE-T, efforts were transferred from PE 1203110SF, Satellite Control Network (SPACE), Project 673276, to PE 1203156SF, Data Transport & Networking, Project 673944, meshONE-T, in order to consolidate data transport and networking efforts to provide greater transparency and alignment of common functions. The meshONE-T (M1T) system provides an enterprise networking capability for USSF and other customers through proliferation of nodes utilizing diversified long-haul communication circuits to provide high speed, scalable, resilient, cyber-secure transport services for mission data producers and consumers. These services are operated and managed via Enterprise Service Desk (ESD) / Network Operation Center (NOC) sites. The multi-tenant, mission-agnostic system uses Commercial Off The Shelf (COTS)-based solutions and industry standard protocols to move data traffic quickly, efficiently, and securely across the Internet Protocol (IP)-based network architecture. M1T meets the needs of the Combatant Commands—with specific focus on USINDOPACOM and USEUCOM. Modern mission data transport services will support Next-Gen and Future Operationally Resilient Ground Evolution (FORGE) Overhead Persistent Infrared (OPIR), Advanced Battle Management System (ABMS), Missile Track Custody (MTC), Space Domain Awareness (SDA), SCN, USSF Integrated Operations Networking (ION), Launch and Test Range System (LTRS), and other mission partners. Supplementary/backup NOCs, communication links, bandwidth upgrades, and system improvements increase global operational reach, resiliency, and responsiveness to support warfighter operations through all phases of conflict. Software defined networking capabilities accelerate onboarding of new mission partners and the delivery of transport services, providing the agility necessary to counter emerging threats. M1T resolves current space mission network shortfalls including antiquated protocols, bandwidth constraints, lack of resiliency, cyber vulnerability, and excessive fielding times. All mission partners using M1T will become part of the USSF ground network enterprise, with access to every node and network-provided cyber-secure services.

R-3 lines of work
  • Product Development
  • Management Services
FY2027 Request
$34.8M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Integrated Operations Networking (ION) — one RDT&E project inside PE 1203156SF. Congressional marks are recorded on the program element, not on a project.

Project 673945 — Integrated Operations Networking (ION) — requests $34.8M in FY2027, 21% of the $165.0M requested for program element 1203156SF. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 673945 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL0.0FY26ENACTED34.8FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request34.8
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted
FY2027 request$34.8M

FY 2027 efforts will focus on scaling and accelerating the expansion of classified cloud and networking infrastructure to support secure data transport in alignment with projected threat timelines. This includes building upon the existing pathfinder implementation to connect disparate classified space capabilities into integrated…

Read the FY2027 plan →
Project 673945 — every activity in full →
Project detail

What project 673945 buys

This is not a New Start. In FY 2027, funds for Integrated Operations Networking (ION) are transferred from PE 1203010SF, Project 646602 to PE 1203156SF, Project 673945. The USSF's Integrated Operations Networking (ION) effort is a critical component of the Space Force's mission to enable the Battle Management, Command, Control, and Communications (BMC3) warfighter missions. ION will integrate commercially available information technology (IT) capabilities to address urgent operational needs and close networking gaps tied to kill chain gaps identified by Space Forces - Space operating in support of USSPACECOM. ION aims to improve tactical and operational timelines within the kill-chain to enable USSF's ability to deliver credible combat power effects in support of the Joint Force. The program will focus on developing a secure, reliable, and multi-classification transport layer to support space missions, with an emphasis on direct connection between all elements of force packages, establishing a special access program (SAP)-level network with overlays, and developing high-speed connectivity and high resilience to Commercial Cloud Services (C2S). The ION program will also pursue opportunities to leverage existing efforts, such as meshONE-T, to support the development of ION. Funding in FY 2027 will enable the program to maintain a steady pace of execution throughout the year, ensuring that the Space Force can leverage the ION capability to enhance its mission effectiveness. The ION program will provide a critical capability to the Space Force, enabling the service to operate in a contested environment and to defend against adversary operations. The program will be executed in a manner that is consistent with the Space Force's priorities, including the development of a digital engineering ecosystem, the implementation of zero trust capabilities, and the modernization of cryptography and supply chain risk management.

R-3 lines of work
  • Support
  • Management Services