RDT&E Program Element · President's Budget PB2027

Launch and Test Range System (LTRS) Modernization

PE 1203182SF·U.S. Space Force·Approp. 3620F — RDT&E·BA7 — Operational System Development
FY2027 Request
$56.8M
Space Force · RDT&E
HitchAI read

U.S. Space Force requests $56.8M in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full.

FY2027 Request
$56.8M
▲ 4.6% vs FY2026
FY2026 Enacted
$54.3M
▲ 24% vs FY2025
FY2025 Actual
$43.9M
Prior year

For fiscal year 2027, the U.S. Space Force is requesting $56.8M for Launch and Test Range System (LTRS) Modernization under RDT&E program element 1203182SF, up 4.6% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550043.9FY25ACTUAL54.3FY26ENACTED56.8FY27REQUEST58.3FY2859.4FY2960.5FY3061.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual43.9
FY2026Enacted54.3
FY2027Request56.8
FY2028Outyear58.3
FY2029Outyear59.4
FY2030Outyear60.5
FY2031Outyear61.7
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 1203182SF

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 5% overall, which can hide much larger swings below.

Project 674137

Launch and Test Range System (LTRS) Modernization

$56.8MFY2027 request ▲ 5%
FY2025 actual$43.9M
FY2026 enacted$54.3M
FY2027 request$56.8M
Product DevelopmentManagement Services

System Delta 80 is developing and executing the Launch and Test Range System (LTRS) Modernization (aka Spacelift Range System) (Project 674157) for Guardians across Space Access, Command and Control, Operations, and Ops Commands. As a result, the Service will deliver space domain awareness capabilities, improve readiness and operational reach of existing force structure, deter, neutralize, defeat and/or destroy counterspace threats and defend the homeland, continue to advance all near term effects, and ensure resilient infrastructure, equipment, and personnel. The Spacelift Range System (SLRS), also known as the Launch and Test Range System (LTRS), provides public safety and assured access to space. LTRS operates at the Eastern Range (ER) at Patrick SFB/Cape Canaveral SFS, FL and the Western Range (WR) at Vandenberg SFB, CA. LTRS provides tracking, telemetry, communications, flight safety, and other capabilities to support launch of national security space (NSS), civil and commercial space payloads, Intercontinental and Sea Launched ballistic missile and missile defense evaluations, and aeronautical and guided weapon tests. LTRS ensures ability to meet the national launch requirement, safely supports the launch cadence of ER/WR launch requirement holders and provides assured access to space for the nation. The ER and WR are designated as Department of War Major Range and Test Facility Bases (MRTFB). To meet evolving technological requirements and Spaceport of the Future guidance, LTRS rebalanced funding from a predominantly Procurement focused appropriation to a balanced appropriation mix of Procurement and RDT&E funding through a Zero Baseline Transfer FY 2025 and beyond. This realignment of appropriations ensures requirements expend against the appropriation most suited for the type of development work required for mission fulfillment. No requirements planned for Procurement obligations were sacrificed to achieve this shift in funding profile, but a large subset of these requirements to modernize Range Instrumentation and associated services were moved to the software acquisition pathway effort as core capabilities. LTRS is comprised of 12 subsystems that together provide this capability to the ranges.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Delta-V▲ 39%
FY2025 actual$26.2M
FY2026 enacted$25.9M
FY2027 request$36.0M

Delta-V will continue to build upon developmental capabilities initiated in prior years such as the Cloud-based Infrastructure, Continuous Integration/Continuous Delivery (CI/CD) platform, software development and test environments, Zero Trust pilot program and work to mature agile and DevSecOps processes across LTRS. Delta-V will also…

Read the FY2027 plan →
Enterprise Systems Engineering and Integration to Support Government-Controlled Baseline
FY2025 actual$9.5M
FY2026 enacted$0.0M
FY2027 request$0.0M
FY2025 actual$8.2M
FY2026 enacted$28.4M
FY2027 request$20.8M

Maintaining capability while modernizing and accelerating engineering innovation to the Ranges and Spaceports. Adopt modern systems, infrastructure, platforms, and processes to increasingly rely on Cloud-based infrastructure with Cloud-native data governance regimes to sustain future operational data needs. Facilitating the shift of…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$56.8M
House NDAA (HASC)HASC
$56.8M full · +$0
Senate NDAA (SASC)SASC
$56.8M full · +$0
House Approps (HAC-D)HAC_D
$56.8M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Government labs & warfare centers2.4%1.3
Other / unspecified98%55.4
FY2027 request100%56.8
Program detail

Mission & acquisition strategy

System Delta 80 is developing and executing the Launch and Test Range System (LTRS) Modernization (aka Spacelift Range System) (Project 674157) for Guardians across Space Access, Command and Control, Operations, and Ops Commands. As a result, the Service will deliver space domain awareness capabilities, improve readiness and operational reach of existing force structure, deter, neutralize, defeat and/or destroy counterspace threats and defend the homeland, continue to advance all near term effects, and ensure resilient infrastructure, equipment, and personnel.

The Launch and Test Range System (LTRS) program acquisition strategy is Incremental System Modernization and Digital Transformation to ensure continued enablement of the accelerating National launch cadence executing on the Eastern Range (ER) and Western Range (WR). This strategy addresses the US Space Force (USSF) Spaceport of the Future (SOTF) objectives, formerly known as Range of the Future (ROTF), envisioned by Range instrumentation architecture—one of multiple SOTF lines of effort. The LTRS program is focused on developing a scalable system capable of responding to the demands of National Security Space objectives and DoW test and evaluation needs as well as assuring the Nation's ability to access space.

Project 674137 — Launch and Test Range System (LTRS) Modernization
  • Product Development
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?How is the FY2027 request split between industry and government performers?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 1203182SF (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Launch and Test Range System (LTRS) Modernization (PE 1203182SF)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/1203182SF
Machine access
Markdown twin /programs/1203182SF.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks