This activity requests $10.6M in FY2027, 19% of project BC1 — a new start with no prior-year and no current-year money. The R-2A exhibit describes it across FY2027, including what the FY2027 money is planned to buy.

New start

This activity requests $10.6M in FY2027 with no prior-year and no current-year funding. There is no incumbent line to compare it with — it did not exist before this President's Budget.

FY2027 Request
$10.6M
President's Budget
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project BC1 of PE 0603118A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Will begin demonstration and validation of next generation static line parachute, incorporating new material and design characteristics; Perform integration and demonstration of technologies in support of long range Joint Precision AirDrop System (JPADS) variants, at distances in excess of 10x of current capabilities; Validate mission planning software algorithms, to rapidly facilitate route planning of autonomous aerial delivery vehicles; Demonstrate and validate technologies to increase Dual Row Airdrop System (DRAS) capability by ~20%.

FY2026 to FY2027 change

Funding increase reflects transfer from Program Element (PE) 0603118A (Soldier Lethality Advanced Technology) / Project BE5 (Personnel & Airdrop Safety Advanced Technology) to streamline and optimize the Science and Technology (S&T) portfolio.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

010.6FY27REQUEST
Request
Fiscal YearEstimate TypeAmount ($M)
FY2027Request10.6

This activity is 19% of project BC1's FY2027 request and 8.5% of PE 0603118A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

9 activities in project BC1

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Soldier/Squad-System Technology Integration for Lethality & Readiness$15.6M NEWTraining and Simulation Technology, AdvTech$14.3M NEW
Personnel and Airdrop Safety Advanced Technology — this activity$10.6M NEW
Institute for Advanced Composites Engineering - Advanced Technology Development$6.1M NEW
Domestically Sourced Next Generation Batteries Advanced Technology$3.7M NEW
Blast Overpressure Data Movement & Display Technologies$2.5M NEW
Joint Service Combat Feeding Advanced Technology$2.1M NEW
Operational Unit Partnership and Soldier Touch Point▼ 100%
Soldier/Squad Performance Metrics for Lethality▼ 100%
Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0603118A, project BC1 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0603118A/BC1/a5.md · MCP mcp.hitchintel.combudget_get_activity