R-2A Activity · President's Budget PB2027

Integration, Experimentation, and Evaluation Solutions

Activity a3·Project 634094 — Next Gen Platform Dev/Demo·PE 0603273F·U.S. Air Force
FY2027 Request
$37.6M
▲ 6.4% vs FY2026
HitchAI read

This activity requests $37.6M in FY2027, 23% of project 634094, up 6.4% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$37.6M
▲ 6.4% vs FY2026
FY2026 Enacted
$35.3M
▲ 137% vs FY2025
FY2025 Actual
$14.9M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 634094 of PE 0603273F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Continue establishing the requisite testing infrastructure needed to perform and evaluate nuclear re-entry system science and technology (S&T) activities relevant environments. - Continue the procurement of long-lead time special equipment for installation into government integration facilities. - Continue the construction design of a second facility supporting experimental re-entry mockup integration. - Continue procurement planning of long-lead time equipment for installation into the re-entry mockup integration facility. - Continue planning and design of high lateral acceleration (high-g), high-precision centrifuge to align with construction schedules and deliverables. - Continue developing enhanced ground and complementary experimentation capabilities and establish supporting strategic-grade inertial sensor characterization and validation to meet Guidance, Navigation, and Control (GNC) analyses for future flights to achieve Technology Readiness Level (TRL) 6 for Inertial Measurement Units (IMU) and related components/systems/subsystems. - Continue integration planning for recoverable re-entry testbeds across multiple experimental payloads. - Continue developing functional requirements to establish an integration strategy and a proposed test plan for telemetry, GNC, Aeroshell, and fuzing technologies for future flights. - Continue developing requirements for enduring Government Reference Design (GRD) flights. - Continue coordination with GRD delivery system developer and launch facility coordinator. - Continue the development of subscale re-entry testbeds supporting modeling and simulation validation and TRL maturation for nuclear re-entry system components and materials. - Continue design and development for a reliable portfolio of sub-scale, dual-use nuclear re-entry system flight experiment platforms. - Complete design of the nuclear modeling and simulation capabilities facility. - Complete accreditation and certification processes for REVIL infrastructure, personnel, and equipment. - Commence operational use of REVIL, including use of IT equipment, networks, and contracted operational staffing costs for facility management and maintenance.

FY2026 to FY2027 change

This effort increases by $2.256 million from FY 2026 to FY 2027 due to the accreditation, certification, and preparation for the operational use of REVIL, as well as the acquisitions and expertise development necessary to modernize nuclear S&T infrastructure. Continued modernization of nuclear S&T and infrastructure is vital to remaining on schedule with the jointly developed twenty-five (25)-year roadmap between the DAF and the U.S. Navy in accordance with strategic guidance provided by the Office of the Undersecretary of War (OUSW) for Research and Engineering (R&E) in FY 2023.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Continue establishing the requisite testing infrastructure needed to perform and evaluate nuclear re-entry system science and technology (S&T) in relevant environments. - Continue the procurement of long-lead time special equipment for installation into government integration facilities. - Continue accreditation and certification processes for the Re-Entry Vehicle Integration Laboratory (REVIL) infrastructure, personnel, and equipment. - Continue the construction design of a second facility supporting experimental re-entry mockup integration. - Continue procurement planning of long-lead time equipment for installation into the re-entry mockup integration facility. - Continue planning and design of high lateral acceleration (high-g), high-precision centrifuge to align with construction schedules and deliverables. - Continue developing enhanced ground and complementary experimentation capabilities and establish supporting strategic-grade inertial sensor characterization and validation to meet Guidance, Navigation, and Control (GNC) analyses for future flights to achieve Technology Readiness Level 6 (TRL 6) for IMU and related components/systems/subsystems. - Continue integration planning for recoverable re-entry testbeds across multiple experimental payloads. - Continue developing functional requirements to establish an integration strategy and a proposed test plan for telemetry, GNC, Aeroshell, and fuzing technologies for future flights. - Continue developing requirements for enduring GRD flights. - Continue coordination with GRD delivery system developer and launch facility coordinator. - Continue the development of a re-entry testbed supporting modeling & simulation validation and TRL maturation for nuclear re-entry system components and materials. - Continue design and development for a reliable portfolio of sub-scale, dual-use nuclear re-entry system flight experiment platforms. - Complete construction of the Re-Entry Vehicle Integration Laboratory (REVIL), which will support integration of strategic technologies and testbeds. - Commence design of the nuclear modeling and simulation capabilities facility.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25014.9FY25ACTUAL35.3FY26ENACTED37.6FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual14.9
FY2026Enacted35.3
FY2027Request37.6

This activity is 23% of project 634094's FY2027 request and 23% of PE 0603273F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

4 activities in project 634094

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the program-element page.

Aeroshell Technologies$96.6M ▲ 43%
Integration, Experimentation, and Evaluation Solutions — this activity$37.6M ▲ 6%
Advanced Guidance, Navigation and Control (GNC) Technologies$25.0M ▲ 20%
Advanced Fuzing Technologies$6.8M ▲ 91%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0603273F, project 634094 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access