R-2A Activity · President's Budget PB2027

Collaborative Defense

FY2027 Request
$25.9M
▲ 39% vs FY2026
HitchAI read

This activity requests $25.9M in FY2027, 56% of project BG7, up 39% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$25.9M
▲ 39% vs FY2026
FY2026 Enacted
$18.6M
In law
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project BG7 of PE 0603462A. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Will further develop integrated collaborative defense system design based on data from previous component-level demonstrations; mature and demonstrate threat and effector sensing and tracking modalities and optimize associated hardware and software; optimize effector and payload hardware for required terminal effects performance; demonstrate physical installation onto host ground platforms or representative structures, and optimize integration aspects to minimize size, weight, and power burdens; demonstrate live defeat of multiple threat classes; develop hardware for subsequent capability enhancements and demonstrations.

FY2026 to FY2027 change

Increase reflects natural progression of the technology development, moving from system design and component-level work to system build and demonstration.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Will leverage prior research from 0602145A, Next Generation Combat Vehicle Technology / BG6 - Collaborative Defense to mature physical, electrical, and software designs, and package the selected individual component technologies that comprise the system in preparation for environmental, durability and performance validation; provide updates to the system architecture design model, control software, as well as the physical system integration design to prepare for full-system sample build.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25018.6FY26ENACTED25.9FY27REQUEST
Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted18.6
FY2027Request25.9

This activity is 56% of project BG7's FY2027 request and 22% of PE 0603462A's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

11 activities in project BG7

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Collaborative Defense — this activity$25.9M ▲ 39%
Active Protection$12.5M NEW
Armor$6.5M NEW
Integrated Signature Management$1.5M ▼ 5%
Advanced Radar and Soft-Kill (A-RASK) Suite
Soft-Kill System Development▼ 100%
Survivability Capability Characterization and Demonstration
APS Residuals Protection Maturation and Complex Threat Attack Protection (CTAP)
Controls and Architecture
Hard Kill Active Protection System (HK APS) Development, Integration, and Demonstration
Next Generation Adaptive Armor▼ 100%
Source
FY2027 Department of the Army RDT&E Budget Justification · Exhibit R-2A · PE 0603462A, project BG7 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.