RDT&E Program Element · President's Budget PB2027

Next Generation Combat Vehicle Advanced Technology

PE 0603462A·U.S. Army·Approp. 2040 — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$118.2M
⚑ Contested — Senate adds 12%
HitchAI read

U.S. Army funding falls 62% to a $118.2M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House added 21% (to $143.6M); the Senate added 12% (to $132.2M); House appropriators added 154% (to $299.8M).

FY2027 Request
$118.2M
▼ 62% vs FY2026
Senate mark
$132.2M
▼ $14.0M vs request
FY2026 Enacted
$308.2M
In law

Roll-up of 10 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $118.2M for Next Generation Combat Vehicle Advanced Technology under RDT&E program element 0603462A, down 62% from FY2026. In the FY2027 defense authorization, Senate moved to raise it to $132.2M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1002003000240.1FY25ACTUAL308.2FY26ENACTED118.2FY27REQUEST146.6FY28145.9FY29153.2FY30159.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual240.1
FY2026Enacted308.2
FY2027Request118.2
FY2028Outyear146.6
FY2029Outyear145.9
FY2030Outyear153.2
FY2031Outyear159.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

10 projects roll up into PE 0603462A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -62% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.

Project BG3

Modeling and Simulation for MUMT Advanced Tech

FY2027 request ▼ 100%
FY2025 actual$3.5M
FY2026 enacted$5.1M
FY2027 request

This project matures and demonstrates modeling and simulation (M&S) tools/technologies to assess and improve freedom of movement for ground forces and supports vehicle developers by addressing challenges for robotic and ground vehicles. This project matures and demonstrates obstacle detection capabilities for autonomous systems operating in complex environments. This project also matures and demonstrates real-time mobility decision support tools, vehicle-terrain interaction models for autonomous convoy operations, simulation tools for vehicle mobility in highly altered terrain, and M&S tools for predicting the performance of autonomous vehicles. These M&S technologies can be integrated across Army vehicle platforms as required. Work in this project is coordinated with Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology) / Project BG2 (Modeling and Simulation for MUMT Technology). Work in this project is performed by the United States Army Engineer Research and Development Center Geotechnical and Structures Laboratory.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Autonomous Vehicle/Terrain Interactions Demonstration▼ 100%
FY2025 actual$3.5M
FY2026 enacted$5.1M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.

FY2026 plans — current year Will mature and demonstrate validated high-fidelity modeling and simulation tools integrated with Software-in-the-Loop (SITL) capabilities simulating and predicting coordinated human and machine interactions. Will validate advanced vehicle terrain interface relationships for predicting performance of autonomous vehicle platforms operating in heterogeneous terrain and deformable soils; will mature, demonstrate, and validate robust, high-fidelity, physics-based thermal modeling and simulation sensor models.

FY2025 accomplishments Demonstrated advanced vehicle terrain interface and soft-soil terramechanics for ground vehicle systems operating and highly altered terrain/environments. Integrated and demonstrated real-time, physics-based thermal sensor modeling capabilities in operational environments.

Project BI3

Sensor Protection Advanced Technology

FY2027 request ▼ 100%
FY2025 actual$1.7M
FY2026 enacted$1.0M
FY2027 request

This project matures and demonstrates novel sensor protection capabilities which dramatically reduce the susceptibility of our thermal electro-optic/infrared (EO/IR) sensors to ever increasing threats on the battlefield. This project enables continuation of the mission despite potential threat laser engagements. Low-cost modular solutions will be demonstrated that can be applied across current and planned EO/IR targeting, surveillance, and situational awareness sensor systems against existing and emerging threats in support of combined arms maneuver. Research in this project is coordinated with Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology), 0602143A (Soldier Lethality Technology), 0603465A (Future Vertical Lift Advanced Technology) and 0603118A (Soldier Lethality Advanced Technology). Work in this project is performed by the Command, Control, Computers, Communications, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Center

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Sensor Protection Advanced Technology▼ 100%
FY2025 actual$1.7M
FY2026 enacted$1.0M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects realignment to Program Element (PE) 0603462A (Next Generation Combat Vehicle Advanced Technology) / Project BG1 (Sensors for Autonomous Operations and Survivability Advanced Technology) to streamline and optimize the Science and Technology portfolio.

FY2026 plans — current year Will optimize automatic selectable filter for high-performance infrared (IR) sensors; will demonstrate TRL6 laser ID algorithm with an automatic selectable filter on a current high-performance forward looking IR system.

FY2025 accomplishments Will mature, demonstrate, and deliver high transmission in-dewar optics with advanced coatings for improved performance and signature management. Will optimize laser ID algorithm to detect a laser incident and automatically select or tune a filter to provide protection.

The whole program

ADIDAS is funded on 2 lines across 1 appropriations

This page shows $9.1M of ADIDAS, 52% of the program's $17.4M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Adv Direct In-Direct Armament Sys (ADIDAS) TechRDT&EArmy8.4
ADIDAS totalArmy17.4

Lines whose title names the program. 1 further lines only mention ADIDAS in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$118.2M
House NDAA (HASC)HASC
$143.6M +$25.4M · +21%
Senate NDAA (SASC)SASC
$132.2M +$14.0M · +12%
House Approps (HAC-D)HAC_D
$299.8M +$181.6M · +154%
▲ $167.6M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

This Program Element (PE) executes development, maturation, and demonstration for the Army's modernization priority for the Next Generation of Combat Vehicle (NCCV). This PE matures, integrates and demonstrates combat vehicle technologies that enable the Army to have a smarter, faster, more lethal, more precise, more protected, and more adaptable force. Technology development builds upon the foundational vehicle architectures to support the NGCV, to include autonomy architecture, power architecture, vehicle electronic architecture, physical architecture, lethality architecture and vehicle protection architecture.

Project BG7, BF4, BH8, BG1, BK6, BF7, BP6, BH6, BG3, BI3 — Ground Systems Active Defense (GSAD) Advanced Tech
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did Senate do to this request, and what is still unresolved?Which project inside PE 0603462A is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603462A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Next Generation Combat Vehicle Advanced Technology (PE 0603462A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603462A
Machine access
Markdown twin /programs/0603462A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$46.3M
▲ 6.5% vs FY2026
FY2026 Enacted
$43.5M
▼ 15% vs FY2025
FY2025 Actual
$51.2M
Prior year

Ground Systems Active Defense (GSAD) Advanced Tech — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BG7 — Ground Systems Active Defense (GSAD) Advanced Tech — requests $46.3M in FY2027, 39% of the $118.2M requested for program element 0603462A. Year over year it grows 6.5% against FY2026.

Funding trajectory

Project BG7 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550051.2FY25ACTUAL43.5FY26ENACTED46.3FY27REQUEST55.8FY2849.2FY2942.7FY3043.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual51.2
FY2026Enacted43.5
FY2027Request46.3
FY2028Outyear55.8
FY2029Outyear49.2
FY2030Outyear42.7
FY2031Outyear43.1
Inside the project

11 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Advanced Radar and Soft-Kill (A-RASK) Suite
FY2025 actual$6.6M
FY2026 enacted
FY2027 request

Will mature soft-kill countermeasure techniques to defeat laser-guided ATGM threats; Will determine optimized sensor configuration for detection of unknown/unexploited threats; Will improve threat detection algorithms to include additional emerging threat classes and increase accuracy of threat tracking; Will demonstrate representative…

Soft-Kill System Development▼ 100%
FY2025 actual$12.8M
FY2026 enacted$16.0M
FY2027 request

Will begin development and maturation of next increment of soft-kill subsystems to address additional threats; environmentally harden the system, begin upgrading to the latest revision of the Modular Active Protection System Framework; improve optimization of subsystems for space, weight, and power (SWAP) and begin virtual and lab…

Survivability Capability Characterization and Demonstration
FY2025 actual$2.5M
FY2026 enacted
FY2027 request

Will complete Survivability subsystem/system demonstration, provide documentation and reports for selected survivability subsystems, and transition relevant information to stakeholders.

APS Residuals Protection Maturation and Complex Threat Attack Protection (CTAP)
FY2025 actual$6.7M
FY2026 enacted
FY2027 request

Will build upon prior year's work, at the system level for demonstration, to integrate packaged component designs for protection against advanced and emerging threats which employ complex defeat mechanisms. Will mature and optimize designs through integrated system-level environmental and automotive durability testing, followed by…

Controls and Architecture
FY2025 actual$2.6M
FY2026 enacted
FY2027 request

Will complete laboratory demonstration and transition deliverables to program office. Will document designs for advancements of next phase of active defense technologies.

Hard Kill Active Protection System (HK APS) Development, Integration, and Demonstration
FY2025 actual$19.0M
FY2026 enacted
FY2027 request

Will provide Interface Control Documents at the sub-system level, including those for the Countermeasure, Launcher, Fire Control Solution, and Radar. Will update the system-level Interface Control Document based on sub-system finalization completing the Final Design Review package in order to baseline the system architecture. Will…

Integrated Signature Management▼ 5%
FY2025 actual$0.9M
FY2026 enacted$1.6M
FY2027 request$1.5M

Builds upon FY2026 effort to culminate in the build of system-level demonstrator hardware for the final design. Validate performance of the design at the integrated system-level through physical testing of the demonstrator. Demonstration will be conducted in a relevant operational environment to include multiple types of loading…

Next Generation Adaptive Armor▼ 100%
FY2025 actual
FY2026 enacted$5.9M
FY2027 request

Will collaborate with industry partners to identify and assess novel capabilities to enhance formation-level survivability; activities include down-selecting candidate technologies, procuring components to address identified threat defeat gaps, and validating component performance.

FY2025 actual
FY2026 enacted$18.6M
FY2027 request$25.9M

Will further develop integrated collaborative defense system design based on data from previous component-level demonstrations; mature and demonstrate threat and effector sensing and tracking modalities and optimize associated hardware and software; optimize effector and payload hardware for required terminal effects performance…

Read the FY2027 plan →
Active ProtectionNEW
FY2025 actual
FY2026 enacted
FY2027 request$12.5M

Will validate performance of the multi-spectral threats soft-kill design at the system-level through physical testing of the demonstrator. The demonstration will be conducted in a relevant operational environment to include multiple types of threats to ensure performance. Will transition multi-spectral threats soft-kill products.

ArmorNEW
FY2025 actual
FY2026 enacted
FY2027 request$6.5M

Will build upon research conducted in PE 0602145A - Advanced Concepts for Active Defense/Advanced Vehicle Survivability. Will define and document system requirements to support integration on ground platforms. Will collaborate with industry partners to identify and assess novel capabilities to enhance platform survivability and occupant…

Project BG7 — every activity in full →
Project detail

What project BG7 buys

This project matures and demonstrates protection and survivability technologies to increase the survivability of ground vehicles and the protection of the Soldiers who depend on them. The tasks will focus on component maturation and demonstration and transfer products for demonstration as holistic (vehicle level) solutions. The project will mature and demonstrate technologies to defeat threats throughout the timeline of a threat engagement; from obscuring a target, to actively defeat a threat and through mitigating its effects after engagement. These technologies include the active employment of smoke, physical and electronic active protection, advanced and adaptive armors, advanced and active blast mitigation systems and adaptive interior protection. This project will be coordinated with Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology) and transitions to PE 0604852A (Suite of Vehicle Protection Systems - EMD). Work in this project is performed by the Ground Vehicle System Center (GVSC) and Command, Control, Computers, Communications, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Center

FY2027 Request
$23.2M
▼ 30% vs FY2026
FY2026 Enacted
$32.9M
▼ 35% vs FY2025
FY2025 Actual
$50.7M
Prior year

Combat Vehicle Robotics Adv Tech — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BF4 — Combat Vehicle Robotics Adv Tech — requests $23.2M in FY2027, 20% of the $118.2M requested for program element 0603462A. Year over year it falls 30% against FY2026.

Funding trajectory

Project BF4 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550050.7FY25ACTUAL32.9FY26ENACTED23.2FY27REQUEST30.4FY2826.7FY2934.1FY3034.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual50.7
FY2026Enacted32.9
FY2027Request23.2
FY2028Outyear30.4
FY2029Outyear26.7
FY2030Outyear34.1
FY2031Outyear34.5
Inside the project

6 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Platform Electronic Control▼ 100%
FY2025 actual$4.3M
FY2026 enacted$7.7M
FY2027 request

Mature and continue optimization of safety processes, components, and software focused on low level control (base vehicle platforms sensors, Drive By-Wire (DBW) systems, payload/subsystem management/monitoring) for uncrewed systems. Expand integration of safety certified components onto uncrewed systems to improve safe mobility with…

Unmanned Maneuver
FY2025 actual$16.0M
FY2026 enacted
FY2027 request

Improve and demonstrate an autonomous maneuver capabilities, with autonomous vehicles operating at speeds comparable to manned vehicles and executing comparable movement techniques in obstructed environments; continue to improve and demonstrate coordinated movements including both robotic platforms and Soldiers in these environments…

Soldier-Robotic Interface Integration▼ 100%
FY2025 actual$5.0M
FY2026 enacted$3.2M
FY2027 request

Improve and demonstrate the ability to operate three or more robotic assets from by a single operator within through the Warfighter Machine Interface (WMI). This task will develop improve the user interface minimize the by reducing the cognitive workload on a single operator and while allowing the robot operator to achieve the mission…

Small UGV as Deployable Sensor
FY2025 actual$2.0M
FY2026 enacted
FY2027 request

Continue to integrate, optimize, and demonstrate advanced autonomy behaviors, Intelligence, Surveillance, and Reconnaissance (ISR) sensors, and optimize small, unmanned ground system platform and controls (using the Warfighter Machine Interface -WMI); mature and demonstrate enhanced autonomy behaviors for small Unmanned Ground Vehicles…

Human - Machine Integrated Formations (H-MIF)
FY2025 actual$23.4M
FY2026 enacted
FY2027 request

Advance robotic and autonomous systems warfighter effectiveness, lethality and survivability for Human-Machine Integrated Formations (H-MIF) by developing and integrating command and control (C2) and autonomy software for robotic maneuver and payload control; mature autonomy for ground robots through software development, advancement and…

FY2025 actual
FY2026 enacted$22.1M
FY2027 request$23.2M

Will advance the Army's un-crewed systems capabilities through a coordinated effort focused on architecture, security, resilience, and integration, prioritizing the rapid adoption of ready-now commercial technologies. Expand the foundational un-crewed architecture and interoperability standards - leveraging open standards, modular…

Read the FY2027 plan →
Project BF4 — every activity in full →
Project detail

What project BF4 buys

This project cultivates the industrial ecosystem for robotics and autonomy by shepherding an industry-developed common Modular Open Systems Approach (MOSA) that drives interoperability, fosters competition, lowers the barrier to entry for partners, and prevents vendor lock. CoVeR delivers shared standards, enabling technologies and Army-specific technical expertise, ensuring the scalable integration of best-of-breed, multi-domain robotic and autonomous system capabilities into Army formations to maintain battlefield overmatch. This project is also coordinated with Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology), and transitions to PE 0604017A. Work in this project is performed by the Ground Vehicle System Center (GVSC).

FY2027 Request
$22.5M
▲ 346% vs FY2026
FY2026 Enacted
$5.0M
▼ 68% vs FY2025
FY2025 Actual
$15.9M
Prior year

Enhanced VETRONICS Advanced Technology — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BH8 — Enhanced VETRONICS Advanced Technology — requests $22.5M in FY2027, 19% of the $118.2M requested for program element 0603462A. Year over year it grows 346% against FY2026.

Funding trajectory

Project BH8 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25015.9FY25ACTUAL5.0FY26ENACTED22.5FY27REQUEST29.8FY2830.9FY2934.1FY3039.1FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual15.9
FY2026Enacted5.0
FY2027Request22.5
FY2028Outyear29.8
FY2029Outyear30.9
FY2030Outyear34.1
FY2031Outyear39.1
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Enhanced - Vehicle Electronics (E-Vetronics)flat
FY2025 actual$15.9M
FY2026 enacted$5.0M
FY2027 request$5.1M

Will mature and demonstrate key ruggedized high-performance compute processing and intra-vehicle network functions within the common on-vehicle network architecture and electronics, enabling emerging artificial intelligence (AI)-intensive capabilities including autonomous mobility, aided targeting, identification, and recognition, active…

Vehicle Mobility and PowerNEW
FY2025 actual
FY2026 enacted
FY2027 request$3.9M

Will evaluate technologies associated with track, running gear and chassis systems needed to operate in complex off-road terrain; evaluate power generation, storage and distribution technologies required for vehicle propulsion and for onboard power and energy-based capabilities.

Operational Evaluation of Commercial BatteriesNEW
FY2025 actual
FY2026 enacted
FY2027 request$3.2M

Will integrate a commercial automotive high power battery system on a military vehicle to evaluate and demonstrate capability in Soldier-operated evaluations.

Mobile Charging System for Dismounted EW and UAVsNEW
FY2025 actual
FY2026 enacted
FY2027 request$2.5M

Will integrate commercial power generation technologies onto a demonstrator offboard power system and demonstrate the capability in Soldier-operated evaluations.

Next Gen BatteriesNEW
FY2025 actual
FY2026 enacted
FY2027 request$7.8M

Will evaluate technologies to facilitate long term safe storage of batteries. Will evaluate filler materials to increase the survivability of commercial batteries in environments. Will evaluate advanced power distribution technology to support high power systems on the battlefield. Will evaluate floating high voltage architectures to…

Project BH8 — every activity in full →
Project detail

What project BH8 buys

This project matures, integrates and demonstrates critical mobile and on-platform power, on-platform compute and network capabilities to enable advanced combat vehicles and dismounted Soldier effectiveness. This project will optimize increased onboard processing capacity, secure data networks, multi-classification architectures, high-power battery systems, mobility systems, mobile power generation, and on-platform power generation and distribution. These systems are all critical to enable emerging autonomy, AI enabled capabilities and power-hungry warfighting technologies. This project will leverage industry collaboration to accelerate technology integration and deployment to reduce acquisition timelines Building upon PEO GCS's Common Infrastructure Architecture (GCIA), this effort will foster collaborative partnerships between Army laboratories and centers and private industry to advance open system data architectures for military ground vehicles. This approach enables common interfaces and capability implementations, providing an open architecture that allows platforms and industry partners to accept future technologies without significant re-design as emerging technologies are developed and integrated. The result will be a scalable, adaptable, and rapidly deployable foundation for next-generation military capabilities. Key technical challenges include increasing processing capacity, power and energy storage density while minimizing size, weight, and effectively managing thermal load. Ensuring data separation across complex multi-classification architectures also presents a significant challenge. Success will enable faster integration of autonomy/AI capabilities along with emerging power-hungry warfighting technologies. This will reduce reliance on proprietary solutions and support a more agile and responsive force. Research in this project is coordinated with Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology). Work in this project is performed by the Ground Vehicle Systems Center (GVSC)

FY2027 Request
$13.8M
▲ 54% vs FY2026
FY2026 Enacted
$8.9M
▼ 6.9% vs FY2025
FY2025 Actual
$9.6M
Prior year

Sensors for Auto Oper and Survivability Adv Tech — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BG1 — Sensors for Auto Oper and Survivability Adv Tech — requests $13.8M in FY2027, 12% of the $118.2M requested for program element 0603462A. Year over year it grows 54% against FY2026.

Funding trajectory

Project BG1 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

09.6FY25ACTUAL8.9FY26ENACTED13.8FY27REQUEST15.1FY2816.1FY2918.3FY3018.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual9.6
FY2026Enacted8.9
FY2027Request13.8
FY2028Outyear15.1
FY2029Outyear16.1
FY2030Outyear18.3
FY2031Outyear18.4
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Advanced Sensors with Embedded Processing▼ 100%
FY2025 actual$5.8M
FY2026 enacted$5.4M
FY2027 request

Will develop advanced sensor components to inform future maturation of a common, modular multispectral sensor system with low power processing and reduced SWaP; mature and demonstrate precision far target location for on-the-move performance and reduced crew workload for legacy and next generation targeting and surveillance systems…

Multi-Mission Payload▼ 100%
FY2025 actual$3.8M
FY2026 enacted$3.6M
FY2027 request

FY 2025 Plans: Will optimize polarized sensors and demonstrate with embedded detection algorithms and a ground penetrating radar sensor with synthetic aperture radar processing to accurately identify locations of near peer threats from small UAS systems. Will provide threat data and their precise locations onto the tactical network from…

FY2025 actual
FY2026 enacted
FY2027 request$12.7M

Will mature and demonstrate day/night electro-optic infrared (EO/IR) aided target detection and recognition (AITDR) threat detection capabilities using imagery collected in both temperate and sub-tropical environments, supporting expanded maneuver of ground platforms against remotely deployed mines; will demonstrate integrated air/ground…

Read the FY2027 plan →
Sensor Protection Advanced TechnologyNEW
FY2025 actual
FY2026 enacted
FY2027 request$1.1M

Will mature novel, spectrally agile sensor protection measures for selective targeting and situational awareness while under attack from current and emerging laser threats.Mature integrated sensor signature reduction and self-protection technologies to enhance the resilience of tactical infrared imaging sensors against detection…

Project BG1 — every activity in full →
Project detail

What project BG1 buys

This project matures, optimizes, and demonstrates automated, advanced multi-function sensors and integrates threat cueing capabilities for operations in full spectrum, complex environments, for next generation manned, optionally manned, and robotic platform applications. This Project will deliver sensor payloads which provide greatly increased situational awareness (e.g., pre-shot and hostile fire detection, threat classification) in all environments for manned and unmanned ground vehicle systems. Work in this project is performed by the Command, Control, Computers, Communications, Cyber, Intelligence, Surveillance and Reconnaissance (C5ISR) Center

FY2027 Request
$9.1M
▼ 17% vs FY2026
FY2026 Enacted
$10.9M
▲ 78% vs FY2025
FY2025 Actual
$6.1M
Prior year

Adv Direct InDirect Armament Sys (ADIDAS) Adv Tech — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BK6 — Adv Direct InDirect Armament Sys (ADIDAS) Adv Tech — requests $9.1M in FY2027, 7.7% of the $118.2M requested for program element 0603462A. Year over year it falls 17% against FY2026.

Funding trajectory

Project BK6 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.1FY25ACTUAL10.9FY26ENACTED9.1FY27REQUEST12.1FY2819.6FY2920.6FY3020.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.1
FY2026Enacted10.9
FY2027Request9.1
FY2028Outyear12.1
FY2029Outyear19.6
FY2030Outyear20.6
FY2031Outyear20.6
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Advanced Lethality Armament System for Large Caliber Advanced Tech▼ 24%
FY2025 actual$6.1M
FY2026 enacted$7.4M
FY2027 request$5.7M

FY2027 planned work Will mature large caliber technologies to demonstrate interoperability and optimize technologies to improve armament system lethality, modularity and reliability while reducing size, weight, and cost; validate technology designs by conducting integrated live-fire demonstrations on relevant armament systems.

FY2026 to FY2027 change Funding decrease due to the reduction in live-fire demonstrations for large caliber technologies.

FY2026 plans — current year Will mature and optimize large caliber direct fire component level technologies that increase armament system lethality, modularity and reliability; conduct demonstrations of technologies on relevant armament systems via live-fire; validate technologies for improved armament system logistics and supportability.

FY2025 accomplishments Will demonstrate large caliber direct fire cannon component level technologies that increase: lethality against armored targets, probability of hit, and rate of fire; demonstrate compatibility automated ammunition handling; provide improved logistics and platform supportability via improved automation technologies.

Breaching Technology for Combat Engineering Operations (AT-CEO)▼ 2%
FY2025 actual
FY2026 enacted$3.5M
FY2027 request$3.4M

FY2027 planned work Will mature and demonstrate mobility and counter mobility technologies;provide technologies for integration into autonomous uncrewed systems and validate technology interfaces in a lab environment.

FY2026 to FY2027 change Funding decrease due to economic adjustment.

FY2026 plans — current year Will mature technologies to conduct combat engineer operations including terrain shaping and breaching and integrate into robotic demonstration test bed hardware; validate the technology interfaces within a modeling and simulation environment, to include hardware in the loop (HIL) demonstration to validate integration and system performance.

Project detail

What project BK6 buys

This project matures and demonstrates technologies for large caliber direct fire light-weight armament systems that will exceed the current capability of 120 millimeter (mm) direct fire cannons and be optimized for future operational environment with cross-domain engagement capability. Specifically, this project integrates and demonstrates technologies for rapid fire on-the-move at all elevations (direct & indirect), compact ammunition design with advanced ignition, advanced recoil mitigation to reduce impulse and allow integration onto lighter platforms, and automated ammunition handling and reloading. This project also supports open architecture to enable supervised autonomy and remote operation and integrates intelligent fire control to address multi-domain targets from manned and unmanned platforms. Work in this project is related to and fully integrated with the efforts funded in Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology) and PE 0604115A (Technology Maturation Initiatives). Work in this project complements Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology) / Project BK5 (Adv Direct In-Direct Armament Sys (ADIDAS) Tech) and Program Element (PE) 0603464A (Long Range Precision Fires Advanced Technology) / Project CE9 (Armaments Advanced Technology). Work in this project is performed by the Armaments Center (AC)

FY2027 Request
$3.4M
▲ 0.2% vs FY2026
FY2026 Enacted
$3.4M
▼ 22% vs FY2025
FY2025 Actual
$4.4M
Prior year

Crew Augmentation and Optimization Adv Tech — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BF7 — Crew Augmentation and Optimization Adv Tech — requests $3.4M in FY2027, 2.9% of the $118.2M requested for program element 0603462A. Year over year it grows 0.2% against FY2026.

Funding trajectory

Project BF7 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.4FY25ACTUAL3.4FY26ENACTED3.4FY27REQUEST3.4FY283.5FY293.5FY303.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.4
FY2026Enacted3.4
FY2027Request3.4
FY2028Outyear3.4
FY2029Outyear3.5
FY2030Outyear3.5
FY2031Outyear3.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Crew Augmentation and Optimization Advanced Technologyflat
FY2025 actual$4.4M
FY2026 enacted$3.4M
FY2027 request$3.4M

FY2027 planned work Will mature, optimize & demonstrate advanced crew-station technologies through expanded rapid Soldier-Centric validations via high-fidelity vehicle simulators and future ground combat vehicle demonstrators, enhancing system effectiveness and lethality for the Army of 2030. Demonstrate Artificial Intelligence-based crew technologies and holistic digital assistants that augment reduced crew for future ground vehicle platforms. Mature and demonstrate drone & counter-drone control technologies, and automated crew-interaction with intelligent detection & recognition systems. Demonstrate collective Embedded Training solutions to enhance warfighter efficiency & readiness.

FY2026 to FY2027 change This increase in funding reflects an economic adjustment.

FY2026 plans — current year Will mature and demonstrate commercial technologies that provide for soldier-guided field adaptation of sensing and autonomous mobility technologies; demonstrate futuristic User Interfaces (UIs) of helmet-mounted displays and spatial audio to command, control and provide lethality for closed-hatched future combat platforms; mature and demonstrate Embedded Training capability for multi-role and add addition training modes for vehicle crews; demonstrate UAS/Counter-UAS crew technologies; validate effectiveness in operationally-relevant Modeling & Simulation (M&S) and field demonstration.

FY2025 accomplishments Mature and demonstrate technologies that augment overall NGCV crew task load; demonstrate use of augmentation technology aids and virtual control to facilitate battlespace awareness of events taking place outside the vehicle in simulation of closed hatched operations, improving protection for Soldiers operating NGCVs; optimize NGCV crew and/or formation notifications and cuing of mid-mission events; integrate, optimize and demonstrate advanced crew-to-section embedded training capability for NGCV platforms; validate effectiveness in an operationally-relevant, field demonstration.

Project detail

What project BF7 buys

This project rapidly matures and demonstrates advanced commercial technologies to enhance crew performance and enable crew augmentation and optimization for closed hatch operations of ground vehicle platforms in a complex multi-domain operations environment. This includes rapid integration of intelligent systems, leveraging machine learning, to improve dynamic tasking, full crew interactions, decision aids, early warnings, command and control, crew use of UAS/Counter-UAS capabilities, to reduce response times and shorten task durations, and to optimize tasking and function. Mature technologies are incorporated onto existing or prototype Army-owned technology demonstrators so that performance of the enabling technologies can be evaluated and the delivery of critical capabilities that optimize crew performance can be accelerated . Work in this project is also coordinated with work in Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology) and PE 0602143 (Soldier Lethality Technology). Work in this project is performed by the Ground Vehicle System Center (GVSC)

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$189.7M
▲ 121% vs FY2025
FY2025 Actual
$86.0M
Prior year

Ground Vehicle Advanced Technology(CA) — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BP6 — Ground Vehicle Advanced Technology(CA) — requests in FY2027, 0.0% of the $118.2M requested for program element 0603462A. Year over year it falls 100% against FY2026.

Funding trajectory

Project BP6 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

50100150086.0FY25ACTUAL189.7FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual86.0
FY2026Enacted189.7
Project detail

What project BP6 buys

Congressional Interest Item funding provided for Ground Vehicle Advanced Technology.

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$7.6M
▼ 31% vs FY2025
FY2025 Actual
$11.0M
Prior year

Platform Electrification and Mobility Adv Tech — one RDT&E project inside PE 0603462A. Congressional marks are recorded on the program element, not on a project.

Project BH6 — Platform Electrification and Mobility Adv Tech — requests in FY2027, 0.0% of the $118.2M requested for program element 0603462A. Year over year it falls 100% against FY2026.

Funding trajectory

Project BH6 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

011.0FY25ACTUAL7.6FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual11.0
FY2026Enacted7.6
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

System/Vehicle Integration and Test
FY2025 actual$2.1M
FY2026 enacted
FY2027 request

FY2025 accomplishments Will demonstrate silent operation extension technology in the system level integration lab.

Battery Technologies for Supply Chain Security▼ 100%
FY2025 actual$8.9M
FY2026 enacted$4.7M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.

FY2026 plans — current year Will address supply chain deficiencies for the Li-ion 6T and other standard batteries by cultivating additional battery vendor technologies for to enable improved competition and a stronger supply base; exploit Department of Energy (DOE) investment to develop alternative material and cell suppliers for Li-ion 6T and other ground vehicle battery systems; mature and demonstrate approaches to safely integrate the Li-ion 6T and Modular high voltage battery to accelerate the fielding of these technologies to improve vehicle performance while reducing logistics.

FY2025 accomplishments Continue to exploit the Li-ion 6T, Small Tactical Universal Battery (STUB), Conformal Wearable Battery (CWB), and BB2590 form factor to cultivate new applications for this technology to increase standardization and volume to and reduce costs. Optimize the vehicle import/export power system for power density and further compatibility with the grid and microgrid systems.

Advanced Running Gear and Suspension System Technology▼ 100%
FY2025 actual
FY2026 enacted$2.9M
FY2027 request

FY2026 to FY2027 change Funding decrease reflects the strategic reallocation of resources to support evolving priorities and objectives.

FY2026 plans — current year Will mature track and suspension components for heavy combat applications; will improve vehicle height changes through suspension system spring adjustment, while augmenting vehicle performance with switchable damping.

Project detail

What project BH6 buys

This project matures, integrates and demonstrates high power technologies for manned and unmanned Next Generation Combat Vehicle (NGCV) platforms. High power technologies will enable advanced on-board power-based payloads such as directed energy weapons, and provide new capabilities such as improved acceleration, extended silent mobility and silent watch. This project will also mature, integrate and demonstrate technologies to increase on-board vehicle power such as a high voltage/temperature generator and high power, high temperature electronics as well as technologies to reduce power demands including composite rubber band track and adaptive hydro-strut suspension. This project matures, integrates and demonstrates energy storage technologies and addresses associated supply chain challenges to enable domestic suppliers. This project also continues work leveraging the Department of Energy and the Department of War with a focus on energy storage, providing an emphasis on developing advanced technologies that enable military ground vehicles to improve platform mobility and lethality. Work in this project complements Program Element (PE) 0602145A (Next Generation Combat Vehicle Technology) / Project BH5 (Platform Electrification and Mobility Tech). Work in this project is performed by the Ground Vehicle System Center (GVSC).