RDT&E Program Element · President's Budget PB2027

JT Tactical RADIO System (JTRS)

PE 0604280N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$409.3M
⚑ Contested — House approps cuts 5.6%
HitchAI read

U.S. Navy funding ramps 24% to a $409.3M request in FY2027 — the program's peak. In the FY2027 defense authorization, the House added 0.7% (to $412.3M); the Senate funded it in full; House appropriators cut 5.6% (to $386.4M). NIWC PAC leads the industry work.

FY2027 Request
$409.3M
▲ 24% vs FY2026
House approps mark
$386.4M
▼ $22.9M vs request
FY2026 Enacted
$330.9M
In law

Roll-up of 12 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $409.3M for JT Tactical RADIO System (JTRS) under RDT&E program element 0604280N, up 24% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $386.4M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1002003004000321.2FY25ACTUAL330.9FY26ENACTED409.3FY27REQUEST310.2FY28300.3FY29289.8FY30269.1FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual321.2
FY2026Enacted330.9
FY2027Request409.3
FY2028Outyear310.2
FY2029Outyear300.3
FY2030Outyear289.8
FY2031Outyear269.1
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

12 projects roll up into PE 0604280N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 24% overall, which can hide much larger swings below. The 8 largest have their own view above; the rest are shown in full here.

Project 3078

Digital Modular Radio

$6.0MFY2027 request ▼ 7%
FY2025 actual$6.5M
FY2026 enacted$6.4M
FY2027 request$6.0M
Product DevelopmentSupportTest and EvaluationManagement Services

(3078) Beginning in FY 2027, the program name Digital Modular Radio (DMR) has been changed to Tactical, Resilient Communications (TRC). TRC program's Modular Adaptive Communication Systems with Integrated Waveform (IW) and Mobile User Objective System (MUOS) radios capable hardware is the Navy's technical solution for the IW/MUOS requirement. The compact, multi-channel provides 3G, Wideband Code Division Multiple Access (WCDMA) technology, for high speed/capacity voice and data satellite communications. TRC radios currently operate aboard U.S. Navy surface and subsurface vessels, fixed-sites and other Department of War (DoW) communication platforms using frequencies ranging from 2 MHz to 2 GHz. Certified to pass secure voice and data at Multiple Independent Levels of Security (MILS) over High Frequency (HF), Very High Frequency (VHF), Ultra High Frequency (UHF), and Satellite Communications (SATCOM) channels, the Modular Adaptive Communication Systems was developed to the U.S. Navy's specifications and meets all the stringent environmental, Electromagnetic Interference (EMI) and performance requirements for use in the U.S. Fleet. This system is formally specified by both Fleet Commanders as a threshold capability, for global maritime command control and communications in a Distributed Maritime Environment, to execute current warfighting plans and is required for National Command and Control capability. This program is for continued development/integration of the IW and MUOS waveforms into the radio in accordance with Military Standards 188-181,2,3. Additionally, the enhancements of High Frequency (HF) Modular Adaptive Communication System and, 3/4G HF Automated Link Establishment (ALE) and Second-Generation Anti-Jam Tactical UHF Radio for NATO (SATURN) edition 4 will also be developed/integrated into the radio equipment. The HF radio equipment integration is part of a follow-on HF solution to fulfill transmit and receive HF communication capability with various modes of operation, such as ALE and Low Probability "x" (LPx) resilient waveforms for Naval platforms. The HF radio equipment will utilize the existing Modular Adaptive Communication System ancillaries.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Tactical, Resilient Communications (TRC)▼ 7%
FY2025 actual$6.5M
FY2026 enacted$6.4M
FY2027 request$6.0M

FY2027 planned work In FY 2027, the program will continue the design, testing, and integration of a follow-on tactical communication solution that will deliver critical cryptographic compliant waveforms to the fleet.

FY2026 to FY2027 change Total decrease to program 3078 is $0.439M due to Navy miscellaneous reductions.

FY2026 plans — current year In FY 2026, the program will complete MUOS 3.2 and SATURN development integration and test efforts with the TRC. TRC will begin the design, testing, and integration of a follow-on tactical communication solution that will deliver critical cryptographic compliant waveforms to the fleet.

Project 3341

Network Tactical Common Data Link

$4.2MFY2027 request ▲ 5%
FY2025 actual$5.1M
FY2026 enacted$4.0M
FY2027 request$4.2M
Product DevelopmentSupportTest and EvaluationManagement Services

Network Tactical Common Data Link (NTCDL) provides the ability to transmit/receive real-time Intelligence, Surveillance, and Reconnaissance (ISR) data simultaneously from multiple sources (surface, airborne, sub-surface, man-portable), and exchange command and control information (voice, data, imagery, and Full Motion Video) across dissimilar joint, service, coalition, and civil networks. NTCDL provides warfighters with the capability to support multiple, simultaneous, networked operations with currently fielded Common Data Link (CDL)-equipped air platforms (e.g. MH-60R), in addition to next generation manned and unmanned platforms (e.g., P-8, Triton, MQ-25 (Stingray), small tactical unmanned aircraft systems (STUAS) and Fire Scout). NTCDL is an incremental capability (surface, airborne, sub-surface, and man-portable) providing modular, scalable, multiple-link networked communications. NTCDL benefits the fleet by providing a horizon extension for line-of-sight sensor systems for use in time-critical strike missions and supports tasking, collection, processing, exploitation, and dissemination (TCPED) via its ISR networking capability. NTCDL supports Resilient Command and Control (RC2) through its relay capability and supports TCPED through its ISR networking capability. FY 2027 request is for NTCDL to continue enhancing the current system through software upgrades and bug fixes. This funding will support software enhancements that directly lead to meeting program requirements and supporting MQ-25 testing requirements.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Network Tactical Common Data Link (NTCDL)▲ 5%
FY2025 actual$5.1M
FY2026 enacted$4.0M
FY2027 request$4.2M

FY2027 planned work FY 2027 request is for NTCDL to continue enhancing the current system through software upgrades and bug fixes. This funding will support software enhancements that directly lead to meeting program requirements and supporting MQ-25 testing requirements.

FY2026 to FY2027 change The FY 2027 funding increase of $0.196M reflects development work on the follow-on contract to enhance the current system through software upgrades, bug fixes, and development of a smaller variant.

FY2026 plans — current year FY 2026 plans include completing reporting and close-out of Tech Evaluation and Initial Operational Test & Evaluation and continued development of a smaller variant, and finalization of the ground variant.

Project 4011

Naval Coastal Warfare Surv and C4I Sys

$2.7MFY2027 request ▼ 7%
FY2025 actual$2.9M
FY2026 enacted$2.9M
FY2027 request$2.7M
Product DevelopmentTest and EvaluationManagement Services

The Navy Expeditionary C4I project supports the Navy Expeditionary Combat Command (NECC) mission to detect, deter or interdict potential threats to DoN assets using agile, modular and scalable technology. NECC units have a number of current and future Command, Control, Communications, Computers & Intelligence (C4I) technological requirements for Tactical/Command Operations Center, tactical vehicles, combatant craft, and dismounted personnel. NECC operations require units to maintain effective command and control, develop and display a common tactical picture, and share intelligence and current operational information with higher headquarters, subordinate units, joint forces and coalition allies. Small, Medium, and Large Scale Communication Systems (LSCS) are the C4I hub for the Navy Expeditionary Combat Force (NECF); Expeditionary Deployable Node (EDN) is the latest converged LSCS baseline. Future C4I research and development includes implementation of The Expeditionary Deployable Node (EDN) and Navy Expeditionary Tactical Entry Points (NExTEP) at the Fleet Network Operations Centers (NOC), which supports the NECC Type Commander's (TYCOM) vision of a smaller footprint C2 system with reduced Fleet administration and patching requirements and a single domain and single user identity across all deployed systems. Future C4I research and development will enhance information transport, network cyber security posture, assured communications in denied environments along with agility and mobility. Funding is required for testing and evaluation of cyber security issues associated with obsolescence of network items and if not addressed will impact the ability of the Program Office to maintain system accreditation under Risk Management Framework (RMF) revoking multiple LSCS assets authority to connectivity on the Department of War Information Network (DoWIN). Efforts are in alignment with NECC's strategic Expeditionary Warfare Improvement Program (EXWIP) Capability Area Input (CAI) priorities and maintain alignment with greater DoW initiatives, such as Joint Information Environment (JIE), Mission Partner Environment (MPE) in order to maintain interoperability and drive down DoN enterprise costs.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
NECC C4ISR Modernization▼ 7%
FY2025 actual$2.9M
FY2026 enacted$2.9M
FY2027 request$2.7M

FY2027 planned work FY 2027 funding supports further development of a comprehensive cloud strategy that addresses critical operational vulnerabilities through research and development of automated IL5 patching solutions. Additional tasking will support further testing of containerization, network enhancements, cloud technology advancement analysis, and operational demonstration testing initiatives that address critical gaps in current IT infrastructure capabilities essential for modern naval operations. Containerization development will enable rapid application deployment and scalable resource management across diverse operational environments, while network enhancements provide the foundational infrastructure…

FY2026 to FY2027 change The FY 2027 (-0.214M) decrease is due to reduced testing of small-scale proof of concepts of future Expeditionary Carry-On Networks capabilities in support of naval exercises and the Expeditionary Mine Countermeasure (ExMCM) capabilities.

FY2026 plans — current year Based on the result of testing, continue to develop implementation strategy for the multiyear cloud adoption strategy to migrate Joint Expeditionary Cloud Services (JECS) IL5 environment from DISA's Stratus to Azure Gov and assess feasibility of migrating Tactical Entry Point (TEP) services to a cloud and/or carrier-neutral facility (CNF) in the DoW Multi-Cloud (Public) architecture. Evaluate Agile Core Services (ACS) as a Platform as a Service (PaaS) solution for expeditionary systems to expand capabilities of common infrastructure to increase speed to capability. Continue to evaluate and test technologies to comply with DoW's Zero Trust Architecture (ZTA) strategy.

The whole program

AEHF is funded on 2 lines across 2 appropriations

This page shows $76.2M of AEHF, 28% of the program's $270.2M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
B-52 AEHF IntegrationRDT&EAir Force194.0
AEHF totalAir Force, Navy270.2

Lines whose title names the program. 29 further lines only mention AEHF in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$409.3M
House NDAA (HASC)HASC
$412.3M +$3.0M · +0.7%
Senate NDAA (SASC)SASC
$409.3M full · +$0
House Approps (HAC-D)HAC_D
$386.4M −$22.9M · −5.6%
▲ $25.9M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

NIWC PAC
$35.1M · 8.6%
GPNTS Govt Eng Support
NIWC PAC, NAWC PAX
$20.0M · 4.9%
Operational Test & Evaluation (OT&E)
Where FY2027 funding flowsShare$M
Industry primes31%126.1
Government labs & warfare centers1.7%6.7
Other / unspecified68%276.5
FY2027 request100%409.3
See NIWC PAC's full federal contract ledger members
Program detail

Mission & acquisition strategy

Programs will implement digital system-of-systems engineering by using tools such as Model Based System Engineering (MBSE) and Digital Twins to create adaptable digital models to optimize system engineering from design, development and testing to operations and sustainment. Programs will use Development, Security and Operations (DevSecOps) processes for continuous development, integration, testing and deployment, along with common platform services such as Agile Core Services (ACS), for faster fielding of capability.

To address the WIN 11 implementation for the MOS and MOS Mod system, a new MOS Terminal Controller hardware and software is being developed, as required. MOS and MOS Mod integrates the MIDS JTRS terminal developed by the MIDS Program Office PMA-101. The MIDS JTRS BU2 terminal is being updated to BU3. In conjunction with the BU3 development, the TTNT capability is also under development and will be fielded with the BU3 and associated Tactical Targeting Networking Technology External Power Amplifier (TEPA) [designated as A(v)6] for shipboard application. The Link 16 program will perform environmental qualification testing (EQT), to include electro-magnetic interference/compatibility (EMI/EMC) in the MOS and MOS Mod cabinets.

Project 0728, 0729, 0725, 0921, 0742, 3020, 1411, 2126, 3078, 3341, 4011, 9999 — Navy Multiband Terminal (NMT)
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0604280N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what NIWC PAC has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604280N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "JT Tactical RADIO System (JTRS) (PE 0604280N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604280N
Machine access
Markdown twin /programs/0604280N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$95.9M
▲ 125% vs FY2026
FY2026 Enacted
$42.6M
▲ 56% vs FY2025
FY2025 Actual
$27.4M
Prior year

Navy Multiband Terminal (NMT) — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 0728 — Navy Multiband Terminal (NMT) — requests $95.9M in FY2027, 23% of the $409.3M requested for program element 0604280N. Year over year it grows 125% against FY2026.

Funding trajectory

Project 0728 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075027.4FY25ACTUAL42.6FY26ENACTED95.9FY27REQUEST72.1FY2847.2FY2944.2FY3019.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual27.4
FY2026Enacted42.6
FY2027Request95.9
FY2028Outyear72.1
FY2029Outyear47.2
FY2030Outyear44.2
FY2031Outyear19.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$27.2M
FY2026 enacted$29.6M
FY2027 request$78.7M

The details of Program Element 0604280N, Project 0728 for NMT are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Read the FY2027 plan →
FY2025 actual$0.2M
FY2026 enacted$13.0M
FY2027 request$17.2M

Complete maturation of the design and proceed to a Critical Design Review (CDR). As a result of the CDR, the vendor will deliver an Engineering Development Model (EDM) which will support testing to show performance and finalize production details. Test Readiness Review (TRR) is planned 30 days after delivery of an EDM to begin the design…

Read the FY2027 plan →
Project 0728 — every activity in full →
Who's building it

Named performers on project 0728

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Advanced
$15.8M · 16%
COTF
$0.2M · 0.2%
Project detail

What project 0728 buys

The details of Program Element 0604280N, Project 0728 for NMT are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books. Technology Insertion, studies and implementation is necessary for military satellite communications systems development to support emerging technologies for Satellite Communications (SATCOM) programs. This project funds the testing and integration of the modem and processing equipment enabling a Non-Geostationary Orbit (NGSO) system to operate on Navy submarines. The project awarded a contract to a Prime Mission Product (PMP) vendor to develop and test hardware and software to produce an Engineering Development Model (EDM). Increase of $43.479M from FY 2026 to FY 2027 will support major development milestones in FY 2027. FY 2027 funding will support mandated Navy Multiband Terminal (NMT) software and hardware system upgrades required for interoperability with the Evolved Strategic SATCOM (ESS) constellation. In addition, FY 2027 funding will support Wideband Anti-Jam Modem System (WAMS) development, testing, integration, and certification efforts. This provides Resilient Command, Control, and Communications (RC3) and Distributed Maritime Operations (DMO) capability. FY 2027 funding also supports the SATCOM NGSO Technology Insertion Critical Design Review (CDR), Test Readiness Review (TRR), and Engineering Development Model (EDM) vendor design testing, preparing for Production Representative Asset (PRA) delivery in FY 2028.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$76.2M
▲ 11% vs FY2026
FY2026 Enacted
$68.9M
▼ 29% vs FY2025
FY2025 Actual
$96.4M
Prior year

Mobile Advanced Extremely High Frequency (AEHF) Terminal (MAT) — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 0729 — Mobile Advanced Extremely High Frequency (AEHF) Terminal (MAT) — requests $76.2M in FY2027, 19% of the $409.3M requested for program element 0604280N. Year over year it grows 11% against FY2026.

Funding trajectory

Project 0729 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075096.4FY25ACTUAL68.9FY26ENACTED76.2FY27REQUEST0.8FY280.8FY290.8FY300.9FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual96.4
FY2026Enacted68.9
FY2027Request76.2
FY2028Outyear0.8
FY2029Outyear0.8
FY2030Outyear0.8
FY2031Outyear0.9
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Mobile Advanced Extremely High Frequency (AEHF) Terminal (MAT)▲ 11%
FY2025 actual$96.4M
FY2026 enacted$68.9M
FY2027 request$76.2M

The details of Program Element 0604280N, Project 0729 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Project 0729 — every activity in full →
Project detail

What project 0729 buys

The details of Program Element 0604280N, Project 0729 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$62.0M
▲ 430% vs FY2026
FY2026 Enacted
$11.7M
▼ 26% vs FY2025
FY2025 Actual
$15.8M
Prior year

Communication Automation — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 0725 — Communication Automation — requests $62.0M in FY2027, 15% of the $409.3M requested for program element 0604280N. Year over year it grows 430% against FY2026.

Funding trajectory

Project 0725 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550015.8FY25ACTUAL11.7FY26ENACTED62.0FY27REQUEST25.1FY2818.4FY2911.2FY3013.4FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual15.8
FY2026Enacted11.7
FY2027Request62.0
FY2028Outyear25.1
FY2029Outyear18.4
FY2030Outyear11.2
FY2031Outyear13.4
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$15.8M
FY2026 enacted$8.4M
FY2027 request$14.1M

The details of Program Element 0604280N Project 0725 are classified SECRET//NOFORN and are submitted annually to Congress in the classified budget justification books.

Read the FY2027 plan →
HF Lead Services▼ 4%
FY2025 actual$0.0M
FY2026 enacted$3.3M
FY2027 request$3.1M

The details of Program Element 0604280N Project 0725 are classified SECRET//NOFORN and are submitted annually to Congress in the classified budget justification books.

FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$44.7M

The details of Program Element 0604280N Project 0725 are classified SECRET//NOFORN and are submitted annually to Congress in the classified budget justification books.

Read the FY2027 plan →
Project 0725 — every activity in full →
Project detail

What project 0725 buys

The details of Program Element 0604280N Project 0725 are classified SECRET//NOFORN and are submitted annually to Congress in the classified budget justification books.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$53.7M
▲ 9.6% vs FY2026
FY2026 Enacted
$49.0M
▼ 20% vs FY2025
FY2025 Actual
$61.0M
Prior year

NAVSTAR GPS Equipment — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 0921 — NAVSTAR GPS Equipment — requests $53.7M in FY2027, 13% of the $409.3M requested for program element 0604280N. Year over year it grows 9.6% against FY2026.

Funding trajectory

Project 0921 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100061.0FY25ACTUAL49.0FY26ENACTED53.7FY27REQUEST99.6FY28105.3FY29102.4FY30104.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual61.0
FY2026Enacted49.0
FY2027Request53.7
FY2028Outyear99.6
FY2029Outyear105.3
FY2030Outyear102.4
FY2031Outyear104.5
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Sea Navigation Warfare (NAVWAR)▼ 3%
FY2025 actual$1.1M
FY2026 enacted$1.1M
FY2027 request$1.0M

Increment 2 Advanced Digital Antenna Production (ADAP) antenna: Continue government oversight, system engineering, logistics, contracts, and programmatic management efforts for Increment 2 Advanced Digital Antenna Production (ADAP) to include assessment of new Anti-Jam (AJ) capabilities and technologies. Continue investigation of…

Global Positioning System (GPS) - Based Positioning, Navigation and Timing (PNT) Service (GPNTS)▼ 3%
FY2025 actual$1.2M
FY2026 enacted$1.1M
FY2027 request$1.0M

Support NoGAPSS Follow-On Test & Evaluation (FOT&E) for GPNTS SW baseline, including Time and Frequency Component (TFC), Automated Celestial Navigation System (ACNS), Wideband Anti-Jam Modem System (WAMS) capability to provide Two Way Satellite Time Transfer (TWSTT). Support United States Space Force MGUE Inc 1 Operational Test Readiness…

Air Navigation Warfare (NAVWAR)▼ 63%
FY2025 actual$3.6M
FY2026 enacted$3.4M
FY2027 request$1.3M

Continue to support Assured-Positioning Navigation and Timing (A-PNT) efforts by working with Navy Air platforms on navigation requirements and coordinating with surface Navy platforms to leverage synergies including collaboration with Office of Naval Research (ONR) to fund Common Application Space (CAS) research and development efforts…

FY2025 actual$55.1M
FY2026 enacted$43.5M
FY2027 request$50.4M

Continue Lab/Ground/Flight Testing on MH-60R/S for LN-100M. Continue Accurate Navigation System - 3 Modernization (ANAV-3M) development for F/A-18E/F and EA-18G. Continue lab/ground/flight/weapons testing of Accurate Navigation System - 3 Modernization (ANAV-3M) on F/A-18E/F and EA-18G. Complete Statement of Requirements (SOR) and begin…

Read the FY2027 plan →
Project 0921 — every activity in full →
Who's building it

Named performers on project 0921

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NIWC PAC, NAWC PAX
$20.0M · 37%
Northrup Grumman
$12.1M · 22%
Boeing
$7.4M · 14%
NIWC PAC, NAWC
$4.3M · 8.1%
Project detail

What project 0921 buys

The funding increase of $4.688M from FY 2026 to FY 2027 is due to the commencement of LN-251M and ANAV-3M interim solution testing for E-2D, P-8, F/A-18E/F, and EA-18G platforms. Navigation Satellite Timing & Ranging (NAVSTAR) GPS project (0921) encompasses the Navy's efforts to pace the growing threat to GPS Navigation through the fielding of new GPS receivers, Anti-Jam (AJ) Antennas, and Assured Positioning Navigation and Timing (A-PNT) technologies across all Navy platform types. NAVSTAR GPS is a group of A-PNT systems that provides authorized users with secure, worldwide, all weather, three dimensional position, velocity, and precise time data. NAVSTAR GPS provides A-PNT capability to Command, Control, Communications, Computer, Intelligence, Surveillance and Reconnaissance (C4ISR) and combat systems in standalone and networked architectures throughout air and maritime domains. This project is comprised of four distinct efforts: Sea Navigation Warfare (NAVWAR), GPNTS, Air NAVWAR and GPS Modernization. Sea NAVWAR provides AJ antennas and Global Positioning System (GPS) - Based Positioning, Navigation and Timing (PNT) Service (GPNTS) provides GPS Receivers and A-PNT technology to surface platforms, and Air NAVWAR provides AJ antennas and GPS Modernization provides GPS receivers to air platforms. Research, Development, Testing and Evaluation (RDT&E) funding is used to perform all the non-recurring GPS related development, integration, and testing efforts for surface ships and aircraft in support of NAVSTAR GPS. The Air and Sea NAVWAR programs provide continued access to GPS information in a denied or impeded electronic environment. Development efforts for both programs provide improvements to various platform type antennas and ensure compatibility with the new GPS M-Code signal. The Air NAVWAR program continues integration efforts using GPS Antenna System (GAS-1), Advanced Digital Antenna Production (ADAP), and other AJ antennas on air platforms while investigating smaller AJ antennas for space constrained platforms and aircraft with unique requirements. The Sea NAVWAR program integrates AJ antennas onto surface and subsurface platforms. The Sea NAVWAR program will continue to research the viability and development of enhanced AJ techniques and technologies.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$44.9M
▲ 75% vs FY2026
FY2026 Enacted
$25.7M
▲ 2.9% vs FY2025
FY2025 Actual
$25.0M
Prior year

Sub Integrated Ant System — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 0742 — Sub Integrated Ant System — requests $44.9M in FY2027, 11% of the $409.3M requested for program element 0604280N. Year over year it grows 75% against FY2026.

Funding trajectory

Project 0742 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25025.0FY25ACTUAL25.7FY26ENACTED44.9FY27REQUEST37.0FY2828.6FY2928.3FY3027.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual25.0
FY2026Enacted25.7
FY2027Request44.9
FY2028Outyear37.0
FY2029Outyear28.6
FY2030Outyear28.3
FY2031Outyear27.2
Inside the project

7 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Advanced High Data Rate (AdvHDR)▲ 62%
FY2025 actual$11.8M
FY2026 enacted$2.4M
FY2027 request$3.8M

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Towed Buoy Antenna (AN/BRR-6/6B)▼ 31%
FY2025 actual$3.8M
FY2026 enacted$5.3M
FY2027 request$3.7M

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Antenna Improvements▲ 5%
FY2025 actual$3.5M
FY2026 enacted$5.3M
FY2027 request$5.5M

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

OE-538/BRC Antenna Group (OE-538)▲ 280%
FY2025 actual$2.7M
FY2026 enacted$2.5M
FY2027 request$9.5M

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

UC Communications Network (TIMEly)▲ 76%
FY2025 actual$3.1M
FY2026 enacted$10.1M
FY2027 request$17.7M

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Submarine Communication Transmitter Buoy (SECT)(AN/BST-1)▼ 16%
FY2025 actual$0.2M
FY2026 enacted$0.2M
FY2027 request$0.2M

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Submarine High Data Rate (SubHDR)NEW
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$4.5M

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Project 0742 — every activity in full →
Project detail

What project 0742 buys

The details of Program Element 0604280N, Project 0742 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$40.7M
▼ 15% vs FY2026
FY2026 Enacted
$48.0M
▲ 23% vs FY2025
FY2025 Actual
$38.9M
Prior year

MIDS/JTRS — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 3020 — MIDS/JTRS — requests $40.7M in FY2027, 9.9% of the $409.3M requested for program element 0604280N. Year over year it falls 15% against FY2026.

Funding trajectory

Project 3020 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550038.9FY25ACTUAL48.0FY26ENACTED40.7FY27REQUEST41.7FY2864.3FY2966.5FY3067.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual38.9
FY2026Enacted48.0
FY2027Request40.7
FY2028Outyear41.7
FY2029Outyear64.3
FY2030Outyear66.5
FY2031Outyear67.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

MIDS▼ 15%
FY2025 actual$38.9M
FY2026 enacted$48.0M
FY2027 request$40.7M

Continue EMCF testing on previous HW and SW configurations of MIDS JTRS terminals. Begin investigation of development of EMC testing automation tools in adherence with the EMCF manual. Conduct terminal qualification testing on newly developed software builds and hardware configurations. Ensure functional performance testing is thorough…

Read the FY2027 plan →
Project 3020 — every activity in full →
Who's building it

Named performers on project 3020

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NIWC PAC
$22.5M · 55%
DLS
$8.3M · 20%
L3Harris
$5.8M · 14%
BAH
$0.5M · 1.2%
Project detail

What project 3020 buys

The Multifunctional Information Distribution System (MIDS) is the most widely fielded family of Tactical Data Link radio terminals in the world. The MIDS program office is the Performing Activity for the Navy (Lead Service for Department of War (DOW)), Link 16 capability and consists of two (2) product lines, MIDS Low Volume Terminal (LVT) (legacy hardware defined radio) and MIDS Joint Tactical Radio System (JTRS) (software defined radio). MIDS-LVT effort is a cooperative development program between France, Germany, Italy, Spain, and the United States with United States joint service participation (Navy, Army, Air Force), and has provided over 12,000 terminals to more than 50 Nations providing interoperability with North Atlantic Treaty Organization (NATO) and coalition partners. The Department of War (DoW) established the program to design, develop, and deliver low volume, lightweight tactical information system terminals for U.S. and allied fighter aircraft, bombers, helicopters, ships, and ground sites. MIDS-LVT significantly increases force effectiveness and minimizes hostile actions and friend-on-friend engagements. MIDS-LVT Block Upgrade 2 was executed as an Engineering Change Proposal (ECP) and provides the critical upgrades to the MIDS-LVT Terminal to enable U.S., Coalition and International partners' ability to meet the National Security Agency (NSA) mandated timelines for Cryptographic Modernization (CM) and the National Telecommunications and Information Agency (NTIA) and Federal Aviation Agency (FAA) mandated timelines for Frequency Remapping (FR). MIDS JTRS, designed as a Pre-Planned Product Improvement (P3I) and executed as an ECP to the production MIDS-LVT configuration, and is fully compatible with MIDS-LVT. The MIDS JTRS Core Terminal achieved Full Production & Fielding (FP&F) in March 2012. It facilitated the JTRS incremental approach for fielding advanced JTRS transformational networking capability and transformed the MIDS-LVT into a 4-channel, SW Communications Architecture (SCA) compliant, Joint Tactical Radio. A form-fit-function replacement to MIDS-LVT, MIDS JTRS also adds three programmable 2 Megahertz (MHz) to 2 Gigahertz (GHz) channels capable of hosting the JTRS legacy and networking waveforms.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$14.5M
▼ 7.3% vs FY2026
FY2026 Enacted
$15.6M
▼ 3.5% vs FY2025
FY2025 Actual
$16.2M
Prior year

Sub Tact Comm System — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 1411 — Sub Tact Comm System — requests $14.5M in FY2027, 3.5% of the $409.3M requested for program element 0604280N. Year over year it falls 7.3% against FY2026.

Funding trajectory

Project 1411 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

016.2FY25ACTUAL15.6FY26ENACTED14.5FY27REQUEST14.0FY2814.0FY2914.1FY3013.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.2
FY2026Enacted15.6
FY2027Request14.5
FY2028Outyear14.0
FY2029Outyear14.0
FY2030Outyear14.1
FY2031Outyear13.8
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Common Submarine Radio Room (CSRR)▼ 1%
FY2025 actual$13.1M
FY2026 enacted$11.5M
FY2027 request$11.5M

The details of Program Element 0604280N, Project 1411 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books

Link 16▼ 26%
FY2025 actual$3.1M
FY2026 enacted$4.1M
FY2027 request$3.0M

The details of Program Element 0604280N, Project 1411 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

Project 1411 — every activity in full →
Project detail

What project 1411 buys

The details of Program Element 0604280N, Project 1411 are classified SECRET//NOFORN and are submitted to Congress in the classified budget justification books.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$8.6M
▼ 41% vs FY2026
FY2026 Enacted
$14.6M
▼ 44% vs FY2025
FY2025 Actual
$26.0M
Prior year

ATDLS Integration — one RDT&E project inside PE 0604280N. Congressional marks are recorded on the program element, not on a project.

Project 2126 — ATDLS Integration — requests $8.6M in FY2027, 2.1% of the $409.3M requested for program element 0604280N. Year over year it falls 41% against FY2026.

Funding trajectory

Project 2126 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25026.0FY25ACTUAL14.6FY26ENACTED8.6FY27REQUEST7.0FY288.6FY299.1FY309.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual26.0
FY2026Enacted14.6
FY2027Request8.6
FY2028Outyear7.0
FY2029Outyear8.6
FY2030Outyear9.1
FY2031Outyear9.2
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Link 16 Network Increment II - Cryptographic Modernization (CM) / Frequency Remapping (FR)
FY2025 actual$5.2M
FY2026 enacted$0.0M
FY2027 request$0.0M
Command and Control Processor (C2P)▼ 37%
FY2025 actual$17.2M
FY2026 enacted$13.6M
FY2027 request$8.6M

FY2027 planned work Will continue C2P Mod development, integration and engineering activity. Will complete C2P minor engineering updates Will initiate and complete C2P Mod/Link 22 Development Testing (DT)/ Operational Testing (OT) requirements Will complete C2P Mod Initial Operating Capability (IOC)

FY2026 to FY2027 change The $4.977M decrease in funding from FY 2026 to FY 2027 reflects no capability development of C2P Mod Pre-Planned Product Improvement Program (P3I) builds with the exception of minor engineering updates and release.

FY2026 plans — current year Continues C2P Modernization Development, Integration and Systems Engineering. Completes comprehensive ATS assessment Completes P3I efforts Defers Combat System Testing (CST) and Link 22 certifications for C2P Mod SW Release C. Completes Mod SW release C IV&V. Initiates and completes Development Testing (DT) and Operational Test (OT) Planning.

Link Monitoring and Management Tool (LMMT)▼ 100%
FY2025 actual$3.5M
FY2026 enacted$1.0M
FY2027 request$0.0M

FY2026 to FY2027 change The $1.000M decrease from FY 2026 to FY 2027 reflects the LMMT program concluding CD3 Maintenance Release development and testing.

FY2026 plans — current year Prepares for Production Release of Capability Drop (CD) 3 MR through completion of CD3 MR IV&V

Who's building it

Named performers on project 2126

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NIWC PAC
$8.5M · 99%
Project detail

What project 2126 buys

Advanced Tactical Data Link Systems (ATDLS) is the United States (US) Navy's only ship-to-ship/ship-to-aircraft tactical information solution equipping warfighters and Combatant Commanders with real-time battlespace data and extending the range of lethality. ATDLS is the backbone of Carrier Strike Group and AEGIS-Based Defense operations and is the key component in the fire control loop, providing critical track information for enabling maritime offense/defense, Joint Area Domain Command and Control (JADC2), Integrated Air and Missile Defense (IAMD), Ballistic Missile Defense (BMD), Anti-Air Warfare (AAW), Anti-Surface Warfare (ASuW), Electronic Warfare (EW), Advanced Offboard Electronic Warfare (AOEW), and Long Range Fires (LRF) missions. ATDLS Integration Program develops new and improved Tactical Data Links (TDL) networking capabilities, delivering operational and targeting support to the warfighter. ATDLS rapidly and securely connects carrier/shipboard digital combat systems to military aircraft, ground troops, coalition partners, and space assets with vital Situational Awareness, targeting, and sensor information. ATDLS also provides Joint Range Extension capability via Link 16 Network (Link 16) Terminals, Command and Control Processor (C2P), and Link Monitoring and Management Tool (LMMT). Link 16 Network (Link 16) Increment II: Link 16, enhanced by Tactical Targeting Networking Technology (TTNT), is the Military's only joint network providing secure TDL interoperability and data sharing in contested battlespace environments. The Link 16 development initiatives are in support of Joint Chiefs of Staff Joint Requirements Oversight Council Memorandum (JROCM) 075-17 for installation and integration of Multifunctional Information Distribution System (MIDS) Joint Tactical Radio System (JTRS) (MIDS J) terminals into the Navy shipboard environment. These include: (1) Modification of the MIDS on Ship (MOS) cabinet as a MOS MIDS JTRS Engineering Charge Proposal (MMJE), and via the MOS Modernization (MOS Mod) cabinet systems for ships with the legacy JTIDS systems; (2) JROCM 097-20 and the JROC-validated MIDS JTRS Capability Production Document (CPD) 10 February 2011 which provided direction for Crypto Modernization (CM), Frequency Remapping (FR), Enhanced Throughput (ET), CMN, CCR, and TTNT.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services