Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $125.3M for Electronic Warfare Development under RDT&E program element 0304270A, down 1.4% from FY2026. In the FY2027 defense authorization, House approps moved to cut it to $95.3M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 81.2 |
| FY2026 | Enacted | 127.1 |
| FY2027 | Request | 125.3 |
| FY2028 | Outyear | 22.3 |
| FY2029 | Outyear | 16.5 |
| FY2030 | Outyear | 16.5 |
| FY2031 | Outyear | 16.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.
5 projects roll up into PE 0304270A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -1% overall, which can hide much larger swings below.
Terrestrial Layer System
EW-SIGINT Technology-Innovation Pipeline
Theater SIGINT System (TSIGS)
Electronic Warfare Technology Maturation
SIGINT is funded on 4 lines across 2 appropriations
This page shows $2.2M of SIGINT, 2.4% of the program's $91.6M FY2027 request. The rest is appropriated elsewhere.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| Common Development (Airborne SIGINT Development - Common Development) | RDT&E | Air Force | 55.0 |
| RC-135 (Airborne SIGINT Development - RC-135 Rivet Joint) | RDT&E | Air Force | 28.6 |
| Special Programs (Airborne SIGINT Development - Special Platforms) | RDT&E | Air Force | 5.8 |
| SIGINT total | Air Force, Army | 91.6 |
Lines whose title names the program. 59 further lines only mention SIGINT in their justification text — those fund something else and are deliberately excluded from the total.
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Other / unspecified | 100% | 8.3 |
| FY2027 request | 100% | 8.3 |
Mission & acquisition strategy
FY 2027 funding in the amount of $125.301 million supports this Program Element encompassing engineering and manufacturing development for tactical Electromagnetic Warfare (EW) terrestrial (ground) employment applications. The systems under this program provide the Army with the capability to detect, identify, locate, collect/process, report, and engage (disrupt, degrade or deny) hostile forces to prevent their effective use of communications & non-communications networks, counter-mortar/counter-battery radars, surveillance radars, electronically fused munitions and other enemy threats using the Electro-Magnetic Spectrum (EMS).
Details provided under separate cover.
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0304270A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksTLS Echelon Above Brigade (EAB) — one RDT&E project inside PE 0304270A. Congressional marks are recorded on the program element, not on a project.
Project CK3 — TLS Echelon Above Brigade (EAB) — requests $66.9M in FY2027, 53% of the $125.3M requested for program element 0304270A. Year over year it falls 37% against FY2026.
Project CK3 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 66.5 |
| FY2026 | Enacted | 105.6 |
| FY2027 | Request | 66.9 |
| FY2028 | Outyear | 5.7 |
| FY2029 | Outyear | 5.7 |
| FY2030 | Outyear | 5.7 |
| FY2031 | Outyear | 5.8 |
What project CK3 buys
Details provided under separate cover.
Terrestrial Layer System — one RDT&E project inside PE 0304270A. Congressional marks are recorded on the program element, not on a project.
Project FJ5 — Terrestrial Layer System — requests $47.9M in FY2027, 38% of the $125.3M requested for program element 0304270A. Year over year it grows 464% against FY2026.
Project FJ5 funding, FY2025–FY2028
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 14.8 |
| FY2026 | Enacted | 8.5 |
| FY2027 | Request | 47.9 |
| FY2028 | Outyear | 5.9 |
What project FJ5 buys
The total cost of the Terrestrial Layer System (TLS) Brigade Combat Team (BCT) Manpack Middle Tier of Acquisition effort is $455.9 million, including RDT&E and Procurement of prototype units. The TLS BCT Manpack program is funded across the Future Years Defense Program. Details provided under separate cover.
EW-SIGINT Technology-Innovation Pipeline — one RDT&E project inside PE 0304270A. Congressional marks are recorded on the program element, not on a project.
Project A9B — EW-SIGINT Technology-Innovation Pipeline — requests $8.3M in FY2027, 6.6% of the $125.3M requested for program element 0304270A. Year over year it grows 2.7% against FY2026.
Project A9B funding, FY2026–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 8.1 |
| FY2027 | Request | 8.3 |
| FY2028 | Outyear | 8.4 |
| FY2029 | Outyear | 8.4 |
| FY2030 | Outyear | 8.4 |
| FY2031 | Outyear | 8.4 |
5 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work Details provided under separate cover.
FY2026 to FY2027 change This is not a new start. FY 2027 funding realigned from PE 0304270A / Project A99 Electronic Warfare Technology Maturation. Details provided under separate cover.
FY2026 to FY2027 change Details provided under separate cover.
FY2026 plans — current year FY 2026 Funds will provide for matrix and contractor system engineering support for the EW/SIGINT Technology Innovation Pipeline.
FY2026 to FY2027 change Details provided under separate cover.
FY2026 plans — current year FY 2026 will fund development and integration of next generation SIGINT/EW capabilities into program baselines through current and emerging mechanisms such as the EW ARSENAL. The new signals and libraries available can be used to address key operational gaps in the systems' abilities to explore, find, plan, and use relevant detectors and/or techniques against key tactical near peer signals and emerging threats.
FY2026 to FY2027 change Details provided under separate cover.
FY2026 plans — current year FY 2026 will continue to integrate next generation components and conduct customer testing for components on the Prophet Enhanced.
FY2026 to FY2027 change Details provided under separate cover.
FY2026 plans — current year FY 2026 will fund development and testing of NAVWAR and associated EW capabilities. This includes software and hardware that are specifically tailored to operate in the unique environment that the high altitude unmanned systems occupy (e.g. limited atmosphere, extreme field of regard, and long-endurance engagements).
What project A9B buys
Details provided under separate cover.
- Management Services
Theater SIGINT System (TSIGS) — one RDT&E project inside PE 0304270A. Congressional marks are recorded on the program element, not on a project.
Project A9A — Theater SIGINT System (TSIGS) — requests $2.2M in FY2027, 1.8% of the $125.3M requested for program element 0304270A. Year over year it grows 2.8% against FY2026.
Project A9A funding, FY2026–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 2.2 |
| FY2027 | Request | 2.2 |
| FY2028 | Outyear | 2.3 |
| FY2029 | Outyear | 2.3 |
| FY2030 | Outyear | 2.4 |
| FY2031 | Outyear | 2.4 |
What project A9A buys
Details provided under separate cover.
Electronic Warfare Technology Maturation — one RDT&E project inside PE 0304270A. Congressional marks are recorded on the program element, not on a project.
Project A99 — Electronic Warfare Technology Maturation — requests — in FY2027, 0.0% of the $125.3M requested for program element 0304270A. Year over year it falls 100% against FY2026.
Project A99 funding, FY2026–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2026 | Enacted | 2.8 |
What project A99 buys
Project A99 is an EW Technology maturation line is for technology transition, maturation and risk reduction efforts for prototyping and integration of system components for Signals Intelligence (SIGINT)/Electronic Warfare Support (ES), Electronic Attack (EA) and Radio Frequency (RF) enabled Cyber to provide or enhance RF sensors, effectors, and operational awareness for for EW & SIGINT capabilities. Transitions critical technology from Army labs, other government agencies, industry or academia to address critical technical challenges and accelerates new capabilities against emerging requirements. Allows for technology transfer, transition, prototyping of generic exploitation capabilities, lab test and integration into Programs from Army Labs, Academia, and Industry to provide responsive and agile Electronic Warfare & SIGINT capabilities that are required to keep pace with near peer threat and modern technologies such as: Artificial Intelligence/Machine Learning (AI/ML), Disposable payloads, Tethered payloads, Uncrewed Payloads, Load Setting Techniques, Cooperative EW, Obscuration, Deep Sensing and effecting, Weapons Pairing, Common Operating Pictures, Counter Surveillance, Indications and Warning, Electromagnetic Footprint recognition, etc.