RDT&E Program Element · President's Budget PB2027

Electronic Warfare Systems Development

PE 0605275A·U.S. Army·Approp. 2040 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$99.7M
⚑ Contested — House approps cuts 9.7%
HitchAI read

U.S. Army funding ramps 68% to a $99.7M request in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators cut 9.7% (to $90.0M). PM Electronic Warfare & Cyber leads the industry work.

FY2027 Request
$99.7M
▲ 68% vs FY2026
House approps mark
$90.0M
▼ $9.7M vs request
FY2026 Enacted
$59.2M
In law

Roll-up of 5 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $99.7M for Electronic Warfare Systems Development under RDT&E program element 0605275A, up 68% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $90.0M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

5010015000.0FY25ACTUAL59.2FY26ENACTED99.7FY27REQUEST141.6FY28151.7FY2959.9FY3060.8FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted59.2
FY2027Request99.7
FY2028Outyear141.6
FY2029Outyear151.7
FY2030Outyear59.9
FY2031Outyear60.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

5 projects roll up into PE 0605275A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 68% overall, which can hide much larger swings below.

The whole program

NAVWAR is funded on 2 lines across 1 appropriations

This page shows $3.7M of NAVWAR, 41% of the program's $9.0M FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Navigation Warfare (NAVWAR) Advanced TechnologyRDT&EArmy5.3
NAVWAR totalArmy9.0

Lines whose title names the program. 35 further lines only mention NAVWAR in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$99.7M
House NDAA (HASC)HASC
$99.7M full · +$0
Senate NDAA (SASC)SASC
$99.7M full · +$0
House Approps (HAC-D)HAC_D
$90.0M −$9.7M · −9.7%
▲ $9.7M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Industry primes3.0%2.9
Other / unspecified97%93.9
FY2027 request100%96.8
Program detail

Mission & acquisition strategy

The FY 2027 funding in the amount of $99.691 million supports the Electronic Warfare Agile Systems Development encompassing engineering, manufacturing, and software development for systems to plan, manage, detect, interpret, and shape the Electromagnetic Spectrum (EMS) and its use by friendly and hostile forces. The systems developed under this program provide the Army a means to see their own emissions preventing electronic fratricide, helping shape the electronic operating environment, and increasing Soldier and Command Post (CP) survivability.

The proposed Navigation Warfare (NAVWAR) Attack acquisition strategy will utilize competitive Commercial Solutions Opening (CSO) Other Transaction Agreements (OTAs). The strategy will follow a Soldier-centered design process and multiple User Assessments will be used throughout the prototype and development process to define the minimum viable product and minimum viable capability releases. The proposed strategies leverage existing commercial and government technical solutions to enable accelerated prototyping and experimentation of systems and assess operational feedback through User Assessments of developmental solutions to validate military utility.

Project A97, A95, A94, A98, A96 — Counter Surveillance Reconnaissance (CSR)
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0605275A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what PM Electronic Warfare & Cyber has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0605275A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Electronic Warfare Systems Development (PE 0605275A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0605275A
Machine access
Markdown twin /programs/0605275A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$81.0M
▲ 136% vs FY2026
FY2026 Enacted
$34.4M
In law

Counter Surveillance Reconnaissance (CSR) — one RDT&E project inside PE 0605275A. Congressional marks are recorded on the program element, not on a project.

Project A97 — Counter Surveillance Reconnaissance (CSR) — requests $81.0M in FY2027, 81% of the $99.7M requested for program element 0605275A. Year over year it grows 136% against FY2026.

Funding trajectory

Project A97 funding, FY2026–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100034.4FY26ENACTED81.0FY27REQUEST120.7FY28119.3FY2933.4FY3033.7FY31
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted34.4
FY2027Request81.0
FY2028Outyear120.7
FY2029Outyear119.3
FY2030Outyear33.4
FY2031Outyear33.7
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted$16.5M
FY2027 request$22.0M

The Army will conduct laboratory and field assessments of developed LOE 1 prototypes in preparation for Rapid Fielding decision in FY2028. The Army will continue assessment of threat data collected from LOE 1 prototypes to inform basis of issue for CSR systems. The Army will also assess Joint mission planner investment/development for…

Read the FY2027 plan →
LOE 2 Prototype Development▲ 130%
FY2025 actual
FY2026 enacted$2.5M
FY2027 request$5.8M

The Army will conduct assessments of Soldier experimentation/evaluation of Joint prototypes and studies to make determination of Army requirements in support of competitive prototyping in FY2028.

LOE 3 Prototype Development▲ 400%
FY2025 actual
FY2026 enacted$7.5M
FY2027 request$37.5M

The Army will continue competitive OTA with significant investment in limited vendors, to include further lab and field demonstrations.

FY2025 actual
FY2026 enacted$5.4M
FY2027 request$11.4M

The Army will continue to fund engineering and technical assistance after program initiation. The Army will fund program management support, core information technology requirements, Government matrix technical expertise, and shared services requirements via various Government contracts.

Read the FY2027 plan →
Prototype Demonstration/Test▲ 80%
FY2025 actual
FY2026 enacted$2.5M
FY2027 request$4.5M

Continued competitive prototyping and proof of concept for multiple CSR LOEs.

Project A97 — every activity in full →
Project detail

What project A97 buys

The CSR Abbreviated Capabilities Development Document (A-CDD) was signed on 8 January 2024. We are chartered to develop a family of terrestrial EW effectors to counter space-based surveillance threats. CSR non-kinetic effects will disrupt enemy kill chains by protecting and concealing friendly maneuver. CSR will provide three distinct classified counter-space surveillance Lines of Effort (LOE) and mission planner software to orchestrate CSR non-kinetic effects. The FY 2027 cost of the CSR Middle Tier of Acquisition effort is $81,038 million, including RDT&E and Development of prototypes. The Department will certify FYDP funding in a future budget submission. The total cost of the Counter Surveillance Reconnaissance Middle Tier of Acquisition effort is $422,574 million from FY2026 to FY2031. The remainder of the Counter Surveillance Reconnaissance program is fully funded across the Future Years Defense Program.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$10.4M
▲ 34% vs FY2026
FY2026 Enacted
$7.8M
In law

Army Reprogramming Analysis Team (ARAT) — one RDT&E project inside PE 0605275A. Congressional marks are recorded on the program element, not on a project.

Project A95 — Army Reprogramming Analysis Team (ARAT) — requests $10.4M in FY2027, 10% of the $99.7M requested for program element 0605275A. Year over year it grows 34% against FY2026.

Funding trajectory

Project A95 funding, FY2026–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

07.8FY26ENACTED10.4FY27REQUEST10.4FY2810.9FY2911.0FY3011.3FY31
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted7.8
FY2027Request10.4
FY2028Outyear10.4
FY2029Outyear10.9
FY2030Outyear11.0
FY2031Outyear11.3
Inside the project

5 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Keeping Pace with the Enemy and Technology▲ 32%
FY2025 actual
FY2026 enacted$1.9M
FY2027 request$2.5M

FY27 Base plans include enhancement to the Electromagnetic Warfare reprogramming enterprise.

Infrastructure Improvements Multispectral▲ 67%
FY2025 actual
FY2026 enacted$1.2M
FY2027 request$2.0M

FY27 plans include enhancements to the Electromagnetic Warfare reprogramming enterprise.

Infrastructure Improvement Radio Frequency General▲ 46%
FY2025 actual
FY2026 enacted$1.6M
FY2027 request$2.3M

FY27 plans include enhancement the Electromagnetic Warfare reprogramming enterprise.

Threat Flagging and Mission Data Set Reprogramming Tool Development▲ 13%
FY2025 actual
FY2026 enacted$1.7M
FY2027 request$1.9M

FY27 plans include enhancement the Electromagnetic Warfare reprogramming enterprise.

Arsenal Technique Validation and Worldwide Distribution▲ 21%
FY2025 actual
FY2026 enacted$1.5M
FY2027 request$1.8M

Will continue with efforts to enhance automated testing and modelling and simulation of adversary battlefield emitters.

Project A95 — every activity in full →
Who's building it

Named performers on project A95

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Amount of USG Labor is indicated. No con
$1.1M · 10%
Amount of USG travel is indicated. No co
$0.2M · 2.1%
Project detail

What project A95 buys

Current military operations are conducted in a rapidly changing threat environment, where Infra-Red (IR) man-portable air defense systems (MANPADS) seekers, radar guided surface-to-air-missiles (SAM), laser guided weapons (LGW), Counter Unmanned Aerial Systems (C-UAS), and targeting sensors are proliferating and technically evolving. Integrated solutions are required to counter increasingly sophisticated Electromagnetic Warfare (EW) Peer and Near Peer threats. The ARAT EW enterprise supports the tactical Commander by providing timely rapid reprogramming of mission software and information dissemination for the Army. ARAT supports integrated reprogramming of target acquisition, target engagement, platform survivability systems, and Aircraft Survivability Equipment (ASE). The ARAT rapid-reprogramming EW enterprise supports tactical requirements and readiness for deployed aircraft and ground-based terrestrial systems. ARAT identifies and analyzes threat signature changes which affect EW systems; determines the impact of observed signature changes; develops new mission software solutions to adapt the system to the threat changes; disseminates the mission software; and provides methods to upload the new mission software into the affected EW systems. Each element within the ARAT infrastructure plays a specific role within the program's rapid reprogramming process, providing the Soldier with the capability to install mission and target identification software at the lowest possible level, thus maximizing flexibility for tactical Commanders. ARAT participates in the operational and developmental test design of Army EW systems and supports Joint Service Reprogramming Exercises in all theaters. ARAT Research and Development enables continuous development of: 1) automated threat analysis tools to rapidly detect threat changes within the intelligence system, 2) tools to minimize the time to develop Mission Software and Products (MSP), 3) tools and technology to minimize the time required to test and validate MSPs, 4) improved communications conduits to rapidly transmit mission software to upload into supported EW systems to forward deployed combat forces. These efforts allow for rapid threat analysis, threat modeling and simulation, mission software development and testing, distribution and uploading of mission software directly to the supported Soldier on the edge.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$3.7M
▼ 43% vs FY2026
FY2026 Enacted
$6.5M
In law

Navigation Warfare (NAVWAR) — one RDT&E project inside PE 0605275A. Congressional marks are recorded on the program element, not on a project.

Project A94 — Navigation Warfare (NAVWAR) — requests $3.7M in FY2027, 3.7% of the $99.7M requested for program element 0605275A. Year over year it falls 43% against FY2026.

Funding trajectory

Project A94 funding, FY2026–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.5FY26ENACTED3.7FY27REQUEST5.9FY2817.0FY2911.0FY3011.1FY31
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted6.5
FY2027Request3.7
FY2028Outyear5.9
FY2029Outyear17.0
FY2030Outyear11.0
FY2031Outyear11.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Navigation Warfare (NAVWAR) Attack▼ 43%
FY2025 actual
FY2026 enacted$6.5M
FY2027 request$3.7M

FY2027 planned work Begin planning phase of NAVWAR Attack capability development identifying transition of technical engineering Science and Technology (S&T) efforts, conducting market research, contract preparations, and development of required acquisition documentation.

FY2026 to FY2027 change FY 2027 funding decrease due to beginning the planning phase of the NAVWAR Attack capability transitioning from S&T (PE 0603275A Electronic Warfare Advanced Technology / Project A74 Navigation Warfare (NAVWAR) Advanced Technology).

FY2026 plans — current year Continues transition of technical engineering Science and Technology (S&T) efforts to develop a formal NAVWAR capability.

Project detail

What project A94 buys

Adversaries are aggressively developing and fielding counter- Positioning, Navigation, and Timing (PNT) technologies that significantly reduce the Army's ability to conduct military operations. The Army is actively pursuing Navigation Warfare (NAVWAR) Attack capabilities to produce NAVWAR solutions that leverage Electromagnetic Warfare (EW) and Signal Intelligence (SIGINT) capabilities to Soldiers ensuring PNT overmatch by denying adversary access to PNT services. NAVWAR Attack provides deliberate offensive and defensive capabilities to assure friendly use and prevent adversarial exploitation of PNT information through coordinated employment of Space, Cyberspace, and EW capabilities. NAVWAR Attack will provide Warfighters with the ability to understand the GPS/GNSS environment and to produce effects across the battlefield opening windows of opportunity for PNT superiority for friendly forces against adversaries. NAVWAR Attack supports Multi-Domain Operations (MDO) as an enabler to precision fires, movement and maneuver, force tracking, and a host of data networks that tie personnel and weapon systems together into a joint or coalition force. NAVWAR enables Cyber, EW, and Space Operations Officers the ability to plan missions with NAVWAR Attack Planning and Targeting Software and execute missions with NAVWAR Attack Modules supporting friendly PNT superiority in multiple warfighting functions to include Jamming, Cyber, and Munitions. NAVWAR has been identified as a key enabler for multiple wartime scenarios by the 2024 EW Tabletop Exercise and mandated by the National Defense Authorization Act of FY24 (H.R. 2670).

R-3 lines of work
  • Management Services
  • Product Development
  • Support
FY2027 Request
$2.9M
▼ 67% vs FY2026
FY2026 Enacted
$8.9M
In law

SPECTRUM SITUATIONAL AWARENESS SYSTEM (S2AS) — one RDT&E project inside PE 0605275A. Congressional marks are recorded on the program element, not on a project.

Project A98 — SPECTRUM SITUATIONAL AWARENESS SYSTEM (S2AS) — requests $2.9M in FY2027, 2.9% of the $99.7M requested for program element 0605275A. Year over year it falls 67% against FY2026.

Funding trajectory

Project A98 funding, FY2026–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

08.9FY26ENACTED2.9FY27REQUEST2.9FY282.9FY292.9FY303.0FY31
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted8.9
FY2027Request2.9
FY2028Outyear2.9
FY2029Outyear2.9
FY2030Outyear2.9
FY2031Outyear3.0
Project detail

What project A98 buys

Spectrum Situational Awareness System (S2AS) supports Army key modernization initiatives by allowing commanders to sense and see themselves in the Electro- Magnetic Spectrum (EMS), preventing electronic fratricide, helping shape the electronic operating environment, and increasing Command Post (CP) survivability. Operationally S2AS allows commanders to determine and impact their visibility to enemy fire chain. S2AS is a dedicated EMS situational awareness management system that provides the Commander with real time EMS Situational Awareness to support Emissions Control (EMCON) decisions, Electromagnetic Interference (EMI) Resolution, and detect/warn operations centers of unauthorized or intentional sources of interference on today's complex battlefield. S2AS will employ sophisticated hardware and software to strengthen the capabilities of the Army and ensuring resilience against potential adversarial threats. S2AS will address current and future EMS challenges, ensuring awareness and secure use of the EMS. Details provided under separate cover.

FY2027 Request
$1.6M
▲ 1.8% vs FY2026
FY2026 Enacted
$1.6M
In law

Integrated Electronic Warfare Systems — one RDT&E project inside PE 0605275A. Congressional marks are recorded on the program element, not on a project.

Project A96 — Integrated Electronic Warfare Systems — requests $1.6M in FY2027, 1.6% of the $99.7M requested for program element 0605275A. Year over year it grows 1.8% against FY2026.

Funding trajectory

Project A96 funding, FY2026–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.6FY26ENACTED1.6FY27REQUEST1.6FY281.6FY291.6FY301.7FY31
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted1.6
FY2027Request1.6
FY2028Outyear1.6
FY2029Outyear1.6
FY2030Outyear1.6
FY2031Outyear1.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

IEWS - Integrated Electronic Warfare System▲ 2%
FY2025 actual
FY2026 enacted$1.6M
FY2027 request$1.6M

FY2027 planned work Continue to accelerate development efforts for a Next-Generation multi-mission EW capability to include system hardware/software enhancements and techniques development.

FY2026 to FY2027 change Fiscal Year (FY) 2027 funding increase allows the level of effort anticipated to remain stable through the support of hardware and software enhancements.

FY2026 plans — current year Accelerate technology maturation and prototyping an integrated Multi-Mission Force Protection Defensive Electronic Attack capability to include system hardware/software enhancements and techniques development.

Who's building it

Named performers on project A96

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

PM Electronic Warfare & Cyber
$1.6M · 100%
Project detail

What project A96 buys

Electromagnetic warfare (EW) capability gaps pose growing risks to the Army operational effectiveness, requiring strategic investments in next-generation solutions. Investment in developing advanced countermeasures and integration of artificial intelligence with advanced analytics are required to maintain operational superiority, as adversaries continue to advance their own EW technologies and tactics. Funding is intended to support the development of a Next-Generation modular, scalable multi-mission. EW suite of capabilities for a broad range of modern radio frequency-controlled threats. Efforts include the development and integration of new and existing techniques, as well as targeted hardware and software upgrades to improve threat identification, reduce response time, and increase overall mission effectiveness. These investments directly support Transformation in Contact (TiC) objectives and comply with relevant Presidential Directives, ensuring alignment with broader defense modernization priorities.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation