RDT&E Project · President's Budget PB2027

MIDS/JTRS

FY2027 Request
$40.7M
▼ 15% vs FY2026
HitchAI read

Project 3020 — MIDS/JTRS requests $40.7M in FY2027, 9.9% of the $409.3M requested for program element 0604280N, down 15% on FY2026. 1 R-2A activity decomposes the request. NIWC PAC is the largest named R-3 performer at $22.5M, 55% of the project's FY2027 R-3 total.

FY2027 Request
$40.7M
▼ 15% vs FY2026
FY2026 Enacted
$48.0M
▲ 23% vs FY2025
FY2025 Actual
$38.9M
Prior year
Project detail

What project 3020 buys

The Multifunctional Information Distribution System (MIDS) is the most widely fielded family of Tactical Data Link radio terminals in the world. The MIDS program office is the Performing Activity for the Navy (Lead Service for Department of War (DOW)), Link 16 capability and consists of two (2) product lines, MIDS Low Volume Terminal (LVT) (legacy hardware defined radio) and MIDS Joint Tactical Radio System (JTRS) (software defined radio). MIDS-LVT effort is a cooperative development program between France, Germany, Italy, Spain, and the United States with United States joint service participation (Navy, Army, Air Force), and has provided over 12,000 terminals to more than 50 Nations providing interoperability with North Atlantic Treaty Organization (NATO) and coalition partners. The Department of War (DoW) established the program to design, develop, and deliver low volume, lightweight tactical information system terminals for U.S. and allied fighter aircraft, bombers, helicopters, ships, and ground sites. MIDS-LVT significantly increases force effectiveness and minimizes hostile actions and friend-on-friend engagements. MIDS-LVT Block Upgrade 2 was executed as an Engineering Change Proposal (ECP) and provides the critical upgrades to the MIDS-LVT Terminal to enable U.S., Coalition and International partners' ability to meet the National Security Agency (NSA) mandated timelines for Cryptographic Modernization (CM) and the National Telecommunications and Information Agency (NTIA) and Federal Aviation Agency (FAA) mandated timelines for Frequency Remapping (FR). MIDS JTRS, designed as a Pre-Planned Product Improvement (P3I) and executed as an ECP to the production MIDS-LVT configuration, and is fully compatible with MIDS-LVT. The MIDS JTRS Core Terminal achieved Full Production & Fielding (FP&F) in March 2012. It facilitated the JTRS incremental approach for fielding advanced JTRS transformational networking capability and transformed the MIDS-LVT into a 4-channel, SW Communications Architecture (SCA) compliant, Joint Tactical Radio. A form-fit-function replacement to MIDS-LVT, MIDS JTRS also adds three programmable 2 Megahertz (MHz) to 2 Gigahertz (GHz) channels capable of hosting the JTRS legacy and networking waveforms.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 3020 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550038.9FY25ACTUAL48.0FY26ENACTED40.7FY27REQUEST41.7FY2864.3FY2966.5FY3067.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual38.9
FY2026Enacted48.0
FY2027Request40.7
FY2028Outyear41.7
FY2029Outyear64.3
FY2030Outyear66.5
FY2031Outyear67.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

MIDS▼ 15%
FY2025 actual$38.9M
FY2026 enacted$48.0M
FY2027 request$40.7M

Continue EMCF testing on previous HW and SW configurations of MIDS JTRS terminals. Begin investigation of development of EMC testing automation tools in adherence with the EMCF manual. Conduct terminal qualification testing on newly developed software builds and hardware configurations. Ensure functional performance testing is thorough…

Read the FY2027 plan →
Who's building it

Named performers on project 3020

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

NIWC PAC
$22.5M · 55%
DLS
$8.3M · 20%
L3Harris
$5.8M · 14%
BAH
$0.5M · 1.2%