This activity requests $151.5M in FY2027, 30% of project ACX-01, up 188% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$151.5M
▲ 188% vs FY2026
FY2026 Enacted
$52.7M
In law
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project ACX-01 of PE 0603468E. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Continue flight demonstrations validating vehicle release from a host aircraft. - Continue flight demonstrations validating vehicle performance, stability and control through all phases of flight. - Conduct analysis and flight testing to expand flight envelope. - Continue analysis and development of integrated mission systems to mature operationalized capabilities. - Conduct alternate payload integration analysis based on Service-desired concepts of employment. - Initiate alternate aircraft integration studies to include internal and external bomber weapons station integration and safe and acceptable separation computational fluids dynamics analysis. - Continue alternate launch options analysis and risk reduction testing to include palletized and ground launch options. - Conduct propulsion integration studies to explore alternate engine options and engine operability analysis. - Determine manufacturing approaches and design updates required for vehicle production at scale to inform Operational System design and production planning. - Continue maturation of Operational System design based on lessons learned from the Demonstration System, mission systems testing, and manufacturing analysis.

FY2026 to FY2027 change

The FY 2027 increase reflects the shift from platform integration and initial demonstrations to flight test operations and follow-on development.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Conduct weapon integration and ground testing. - Complete fabrication and integration of flight test vehicles. - Complete airworthiness certification and host aircraft integration. - Conduct flight testing of the vehicle on a host aircraft. - Conduct flight demonstrations validating vehicle release from a host aircraft. - Conduct flight demonstrations validating air vehicle performance, stability and control through all phases of flight.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

50100150052.7FY26ENACTED151.5FY27REQUEST
Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted52.7
FY2027Request151.5

This activity is 30% of project ACX-01's FY2027 request and 28% of PE 0603468E's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

14 activities in project ACX-01

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Longshot — this activity$151.5M ▲ 188%
Advanced Complex Systems Studies and Concepts$62.3M ▲ 61631%SPeed and Runway INdependent Technologies (SPRINT) X-Plane Demonstration Project$62.1M ▲ 31%Scaled Hypersonics Studies and Concepts$56.0M NEWOtter$47.7M ▲ 33%
Valley Forge$37.1M ▲ 706%
Artificial Intelligence (AI) Reinforcements (AIR)$32.2M ▼ 38%
More Opportunities with HAWC (MoHAWC)$20.0M flat
Process Intensified Energetics (PIE)$13.0M NEW
Lunar Assay via Small Satellite Orbiter (LASSO)$8.9M NEW
Rubble to Rockets (R2)$7.5M NEW
Robotic Servicing of Geosynchronous Satellites (RSGS)$1.7M ▼ 76%
DARPA Lift Challenge▼ 100%
Control of Revolutionary Aircraft with Novel Effectors (CRANE)▼ 100%
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0603468E, project ACX-01 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0603468E/ACX-01/a1.md · MCP mcp.hitchintel.combudget_get_activity