R-2A Activity · President's Budget PB2027

Otter

FY2027 Request
$47.7M
▲ 33% vs FY2026
HitchAI read

This activity requests $47.7M in FY2027, 9.5% of project ACX-01, up 33% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$47.7M
▲ 33% vs FY2026
FY2026 Enacted
$35.8M
In law
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project ACX-01 of PE 0603468E. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

- Continue to conduct flight hardware acceptance testing for the propulsion system. - Continue to integrate the developed propulsion systems with the air harvesting inlets. - Continue conducting environmental qualification tests for the air harvesting inlets. - Finalizing ground software build and testing. - Finalizing flight software build and testing. - Integrate the satellite onto the launch provider. - Launch of the satellite.

FY2026 to FY2027 change

The FY 2027 increase reflects the shift from design and build activities to final satellite integration, launch and on orbit demonstration.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

- Conduct flight hardware acceptance testing for the propulsion system. - Integrate the developed propulsion systems with the air harvesting inlets. - Conduct environmental qualification tests for the air harvesting inlets. - Continue ground software build and testing. - Continue flight software build and testing. - Kick-off the launch services partner process.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

25035.8FY26ENACTED47.7FY27REQUEST
Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted35.8
FY2027Request47.7

This activity is 9.5% of project ACX-01's FY2027 request and 8.8% of PE 0603468E's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

14 activities in project ACX-01

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Longshot$151.5M ▲ 188%Advanced Complex Systems Studies and Concepts$62.3M ▲ 61631%SPeed and Runway INdependent Technologies (SPRINT) X-Plane Demonstration Project$62.1M ▲ 31%Scaled Hypersonics Studies and Concepts$56.0M NEW
Otter — this activity$47.7M ▲ 33%
Valley Forge$37.1M ▲ 706%
Artificial Intelligence (AI) Reinforcements (AIR)$32.2M ▼ 38%
More Opportunities with HAWC (MoHAWC)$20.0M flat
Process Intensified Energetics (PIE)$13.0M NEW
Lunar Assay via Small Satellite Orbiter (LASSO)$8.9M NEW
Rubble to Rockets (R2)$7.5M NEW
Robotic Servicing of Geosynchronous Satellites (RSGS)$1.7M ▼ 76%
DARPA Lift Challenge▼ 100%
Control of Revolutionary Aircraft with Novel Effectors (CRANE)▼ 100%
Source
FY2027 Office of the Secretary of Defense RDT&E Budget Justification · Exhibit R-2A · PE 0603468E, project ACX-01 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.