RDT&E Project · President's Budget PB2027

Surface ASW System Improvement

FY2027 Request
$26.3M
▼ 12% vs FY2026
HitchAI read

Project 1916 — Surface ASW System Improvement requests $26.3M in FY2027, 20% of the $132.9M requested for program element 0603561N, down 12% on FY2026. 4 R-2A activities decompose the request. Lockheed Martin is the largest named R-3 performer at $9.3M, 35% of the project's FY2027 R-3 total.

FY2027 Request
$26.3M
▼ 12% vs FY2026
FY2026 Enacted
$29.8M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year
Project detail

What project 1916 buys

ASW remains a Navy core competency in a dynamic and uncertain maritime environment. U.S. adversaries continue to develop asymmetric capabilities and capacities to deter, disrupt, or delay the entry of U.S. and allied naval forces, and pose a constant challenge as we implement the Maritime Strategy. Evolving submarine technologies offer enhanced stealth, speed, endurance, weapons, and operational proficiency, foretelling that the adversary submarine of the future will have a significantly larger sphere of influence, while presenting less vulnerability to U.S. forces. The effective offensive engagement range of the adversary submarine of the future will continue to match or outrange individual U.S. and multinational platform sensors and weapons in many tactical environments. Submarines are an increasing threat to all Naval and Allied ships, particularly modern diesel subs and faster torpedoes. Not only can the presence of potential hostile submarines delay naval combatant action until they are located and neutralized, submarines can also disrupt all seaborne logistics supply for any ground campaign as well as maritime commerce. U.S. forces must be effective in all operating environments, ranging from the deep open ocean to the littorals, and are key to countering adversarial anti-access and area denial strategies. The Surface ASW System Improvement project will support essential performance enhancements to the AN/SQQ-89A(V)15 Surface Ship ASW Combat System. This project will improve Measures of Performance (MOP) by enhancing operator interface methods and tools; active and passive detection; tracking, classification, and localization; Torpedo Detection, Classification, and Localization (TDCL); sonobuoy data processing and display capabilities; and increasing acoustic sensor frequency bandwidth (Operational Requirements Document (ORD) #667-76-05 titled 'AN/SQQ-89 Improvement Program' and Test & Evaluation Master Plan (TEMP) 802-2). This project will take advantage of the AN/SQQ-89A(V)15 Surface Ship ASW Combat System Open System Architecture (OSA) and Acoustic Rapid Commercial-Off-The-Shelf (COTS) Insertion (ARCI) initiatives to integrate TDCL and ASW sonar and combat system capability improvements. The AN/SQQ-89A(V)15 Surface Ship ASW Combat System is planned as a backfit program for CG47 (select CG59-73 Baseline 3 and 4 ships) and all DDG51 class ships.

R-3 lines of work
  • Product Development
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 1916 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2500.0FY25ACTUAL29.8FY26ENACTED26.3FY27REQUEST29.1FY2829.8FY2929.6FY3030.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted29.8
FY2027Request26.3
FY2028Outyear29.1
FY2029Outyear29.8
FY2030Outyear29.6
FY2031Outyear30.2
Inside the project

4 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$0.0M
FY2026 enacted$22.4M
FY2027 request$20.1M

- Continue updating ACB trunk software infrastructure for operating system obsolescence. - Continue integration of ACB Step 2 developed capabilities via 12-week Agile DevSecOps software releases. - Continue execution of incremental Step 3 land-based testing in support of ACB-27. - Maintain PRWGs of national-level SMEs for Active Sonar…

Read the FY2027 plan →
AN/SQQ-89A(V)15 Cyber Security Architecture Upgrade▼ 9%
FY2025 actual$0.0M
FY2026 enacted$4.6M
FY2027 request$4.2M

FY2027 planned work - Continue development and adoption of cybersecurity resilience techniques within combat system architecture and sailor response tools for implementation in ACB-27. - Continue development and implementation of cybersecurity measures across system access vectors, vulnerabilities, and engineering of new combat system capabilities, in particular progress towards: identifying mission-success-focused prioritization of cyber vulnerabilities (next iteration of Cyber Bar Stool); adversary opportunity space, network perimeter security, and software delivery pipeline security; infrastructure integrity; integrity assurance (Hydra); extend developer's toolbox; conduct organic test events; validate…

FY2026 to FY2027 change The FY 2026 ($4.624M) to FY 2027 ($4.207M) decrease ($-0.417M) is the result of multiple program and rate adjustments for contractor support services and issues to balance RDT&EN across the DoN and DoW.

FY2026 plans — current year - Continue development and adoption of cybersecurity resilience techniques within combat system architecture and sailor response tools for implementation in ACB-25. - Continue development and implementation of cybersecurity measures across system access vectors, vulnerabilities, and engineering of new combat system capabilities, in particular progress towards: identifying mission-success-focused prioritization of cyber vulnerabilities (next iteration of Cyber Bar Stool); adversary opportunity space, network perimeter security, and software delivery pipeline security; infrastructure integrity; integrity assurance (Hydra); extend developer's toolbox; conduct organic test events; validate…

AN/SQQ-89A(V)15 Surface Ship Engineering Measurement Program (SSEMP)▼ 25%
FY2025 actual$0.0M
FY2026 enacted$2.0M
FY2027 request$1.5M

FY2027 planned work - Support conduct of AN/SQQ-89A(V)15 DT/OT data collection. - Continue planning support for ACB-23 OT. - Continue analysis of performance data from real-world cases/exercises. - Deliver analyses on three (3) real-world cases. - Continue data review to identify potential future analysis targets. - Continue to support the development of rapid reconstruction and analysis tools. - Continue support of ONI data reduction of Fleet collections for analysis and advanced development.

FY2026 to FY2027 change The FY 2026 ($1.975M) to FY 2027 ($1.475M) decrease ($-0.500M) is the result of multiple program and rate adjustments for contractor support services and issues to balance RDT&EN across the DoN and DoW.

FY2026 plans — current year - Conduct ACB-19/Hypervisor Technology-0 (HT0) OT data collection. - Complete analysis of ACB-19/HT0 OT data and results. - Continue planning support for ACB-23 OT. - Initiate planning for ACB-25 OT including Test & Evaluation Master Plan (TEMP) update. - Continue analysis of performance data from real-world SSEMP cases/exercises. - Deliver analyses on three (3) real-world cases. - Continued data review to identify of potential future analysis targets. - Support the development of rapid reconstruction and analysis tools. - Continue support of ONI data reduction of Fleet collections for analysis and advanced development.

AN/SQQ-89A(V)15 Surface Ship ASW Test & Evaluation (T&E)▼ 33%
FY2025 actual$0.0M
FY2026 enacted$0.7M
FY2027 request$0.5M

FY2027 planned work - Conduct HT0-0.19 OT. - Continue ACB-23 TEMP analysis and resource development. - Continue ACB-25 TEMP analysis and resource development. - Continue planning ACB-23 DT event. - Continue planning for ACB-23 OT event. - Conduct lab-based testing in support of ACB-23 DT. - Initiate planning for ACB-23 Cyber OT. - Initiate planning for ACB-25 Cyber OT.

FY2026 to FY2027 change The FY 2026 ($0.745M) to FY 2027 ($0.500M) decrease ($-0.245M) is the result of multiple program and rate adjustments for contractor support services and issues to balance RDT&EN across the DoN and DoW.

FY2026 plans — current year - Continue ACB-23 TEMP analysis and resource development. - Conduct ACB-19/Hypervisor Technology-0 (HT0) OT Readiness Review (OTRR). - Conduct ACB-19 HT0 OT event. - Initiate planning for ACB-23 DT event. - Initiate planning for ACB-23 OT event. - Initiate ACB-25 TEMP analysis and resource development.

Who's building it

Named performers on project 1916

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$9.3M · 35%
VAR
$3.5M · 13%
KMS Solutions*
$1.1M · 4.0%
SERCO
$1.0M · 3.8%