What the FY2027 request buys
Verbatim from the R-2A exhibit for project 3244 of PE 0603563N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.
In FY 2027, The USS SECURE program plans to execute four CRAs which includes IWS 80 for CP6, IWS 80 for SSDS Baseline (BL)12, PMA-280 for Tomahawk, and IWS 1 for Aegis BL 7/9/10, to include conducting a C4I Cyber Table-Top (CTT) for PMS 377 and supporting functional testing of CANES for IWS 1. The USS SECURE program will continue delivering land-based, end-to-end cyber testing services to proactively identify vulnerabilities in Navy systems before deployment. Through coordinated Cyber Test & Evaluation (CT&E) activities including Cyber Risk Assessments (CRAs), CTT exercises, resilience exercises, and vulnerability assessments evaluating systems operating across afloat, aloft, undersea, and ashore environments. These mission-based assessments occur within an operationally relevant system-of-systems test environment that integrates physical hardware and simulated components, allowing multiple Systems-under-Test (SUTs) and programs to be evaluated concurrently. The program provides Developmental Test & Evaluation (DT&E) reports detailing attack methods, vulnerabilities, operational impacts, and mission survivability risks, enabling data-driven cyber engineering decisions, improved mission continuity validation, and reduced program costs through streamlined test planning and early vulnerability discovery. During this period, USS SECURE is transitioning its processes and engineering approach to improve the efficiency and impact of the full cyber T&E lifecycle. Efforts focus on standardizing test preparation, measures, analysis, and outcomes to better support Navy systems engineering and cyber survivability objectives, while increasing the quantity and quality of CT&E data collected. A key initiative is the development of the Cyber Engineering, Test, & Evaluation (CETE) ecosystem, which integrates data from CRAs, CTTs, Red Team activities, and external cyber T&E sources into a centralized environment. By applying Artificial Intelligence and Machine Learning, particularly Large Language Models, the ecosystem will transform static reports into continuous reporting and automated analytics across a system's lifecycle. However, the program is operating under a fixed budget while labor costs are expected to rise, likely requiring personnel reductions. These constraints will limit the number of systems that can be tested prior to deployment, especially given the limited testing opportunities aboard ships potentially reducing cyber evidence, threat awareness, and ultimately the cyber survivability and mission readiness of deployed warfighting systems.
The FY26 budget was zeroed out by congressional action. The FY27 budget value for USS SECURE support returns to expected appropriated value due to reconciliation incongruence.
Three years, and no five-year plan
An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.1 |
| FY2026 | Enacted | 0.0 |
| FY2027 | Request | 10.7 |
This activity is 74% of project 3244's FY2027 request and 3.0% of PE 0603563N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.
3 activities in project 3244
Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.