RDT&E Project · President's Budget PB2027

155mm Extended Range Artillery Munitions

FY2027 Request
$139.6M
▲ 211% vs FY2026
HitchAI read

Project DL5 — 155mm Extended Range Artillery Munitions requests $139.6M in FY2027, 50% of the $277.2M requested for program element 0603639A, up 211% on FY2026. 1 R-2A activity decomposes the request. Other Transaction Authority (OTA) Contra is the largest named R-3 performer at $101.5M, 73% of the project's FY2027 R-3 total.

FY2027 Request
$139.6M
▲ 211% vs FY2026
FY2026 Enacted
$44.9M
In law
Project detail

What project DL5 buys

The Extended Range Artillery Munitions (ERAM) project supports the development of a 155mm system of systems that includes projectile, propellant, primer, fuse, and fuse setter which will deliver lethality and range overmatch in 155mm artillery weapon systems at more than double the current range from legacy artillery cannons and will be compatible with future 155mm artillery systems in contested Global Positioning System (GPS) environments and suboptimal atmospheric conditions. The ERAM development effort is part of an organic Long Range Precision Fires capability, which will provide overmatching cannon artillery range capability at both Tactical and operational Fires range by shaping the nature of the close fight through seeking moving and imprecisely located targets at extended ranges, increase range capability of the current 39 caliber cannon fleet and will also be compatible with future 52 caliber and above artillery weapon systems. Fiscal Year (FY) 2027 funding will support technology maturation and risk reduction of key system and subsystems improvements in performance in difficult use cases (such as GPS contested environments and suboptimal atmospheric conditions), and integration of the tactical warhead and seeker culminating in a series of Design Verification Testing (DVT) to achieve Technology Readiness Level (TRL) six (6) maturity.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Funding trajectory

Project DL5 funding, FY2026–FY2028

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100125044.9FY26ENACTED139.6FY27REQUEST74.5FY28
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted44.9
FY2027Request139.6
FY2028Outyear74.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual
FY2026 enacted$44.9M
FY2027 request$139.6M

Fiscal Year (FY) 2027 funding will support technology maturation and risk reduction of key system and subsystems improvements culminating in a Design Verification Test (DVT) to inform a Technical Review. This technical review will form the basis for a down selection of vendors that have the highest potential to meet cost, schedule, and…

Read the FY2027 plan →
Who's building it

Named performers on project DL5

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Other Transaction Authority (OTA) Contra
$101.5M · 73%
Yuma Proving Ground
$15.0M · 11%
Office of the Project Manager (PM) Comba
$2.1M · 1.5%