RDT&E Program Element · President's Budget PB2027

Tank and Medium Caliber Ammunition

PE 0603639A·U.S. Army·Approp. 2040 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$277.2M
⚑ Contested — House approps cuts 7.3%
HitchAI read

U.S. Army funding ramps 215% to a $277.2M request in FY2027 — the program's peak, before stepping down 84% across the five-year plan. In the FY2027 defense authorization, the House cut 7.2% (to $257.2M); the Senate added 1.8% (to $282.2M); House appropriators cut 7.3% (to $256.9M). Other Transaction Authority (OTA) Contra leads the industry work.

FY2027 Request
$277.2M
▲ 215% vs FY2026
House approps mark
$256.9M
▼ $20.4M vs request
FY2026 Enacted
$88.0M
In law

Roll-up of 7 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $277.2M for Tank and Medium Caliber Ammunition under RDT&E program element 0603639A, up 215% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $256.9M.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

50100150200250078.8FY25ACTUAL88.0FY26ENACTED277.2FY27REQUEST180.6FY2863.5FY2945.1FY3045.6FY31HOUSE APPROPS
Actual Enacted Request Outyear (FYDP) House approps mark
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual78.8
FY2026Enacted88.0
FY2027Request277.2
FY2028Outyear180.6
FY2029Outyear63.5
FY2030Outyear45.1
FY2031Outyear45.6
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

7 projects roll up into PE 0603639A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 215% overall, which can hide much larger swings below.

The whole program

LRPM is funded on 2 lines across 1 appropriations

This program element requests nothing for LRPM in FY2027. The program is still funded — $30.5M of it — but on other lines, which usually means the work is transferring.

Also funded hereTypeComponentFY2027 $M
Long Range Precision Munition (LRPM)RDT&EArmy30.5
LRPM totalArmy30.5

Lines whose title names the program. 1 further lines only mention LRPM in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$277.2M
House NDAA (HASC)HASC
$257.2M −$20.0M · −7.2%
Senate NDAA (SASC)SASC
$282.2M +$5.0M · +1.8%
House Approps (HAC-D)HAC_D
$256.9M −$20.4M · −7.3%
▲ $25.4M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Other Transaction Authority (OTA) Contra
$101.5M · 37%
Other Transaction Authority (OTA) Contract Awards
DoW Ordnance
$16.4M · 5.9%
Projectile Prototyping - MACE
Where FY2027 funding flowsShare$M
Industry primes54%148.9
Government labs & warfare centers25%69.3
Other / unspecified21%59.0
FY2027 request100%277.2
See Other Transaction Authority (OTA) Contra's full federal contract ledger members
Program detail

Mission & acquisition strategy

A portion of this funding line is directly aligned to each Future Vertical Lift (FVL) and Assured Positioning, Navigation, & Timing (APNT) Army Modernization Priorities. The Tank and Medium Caliber Ammunition Program Element encompasses a comprehensive program to develop, rapidly transition to production, and field advanced weapons and munitions for small, medium and large caliber munitions, tank ammunition, mortar ammunition, cannon artillery ammunition, and close combat system items. These Projects will ensure continued battlefield overmatch and lethality of United States maneuver forces against the full range of modern battlefield threats.

Previously, LRPM was structured to develop a lethal capability under the Army Aviation Weapons, Sub-Systems, and Munitions Initial Capability Document, validated in July 2018, to operated under the ecosystem as described in the Future Attack Reconnaissance Aircraft (FARA) Abbreviated Capabilities Development Document (FARA A-CDD). In FY 2024, the U.S. Army aligned LRPM under the Launched Effects (LE) Family of Systems. The LRPM program was approved by the Army Acquisition Executive for a Middle Tier of Acquisition (MTA) Rapid Prototyping (RP) pathway on 9 July 2024. An award of an U.S.

Project DL5, FA5, DN7, DK5, DK7, EC3, CD8 — 155mm Extended Range Artillery Munitions
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did House approps do to this request, and what is still unresolved?Which project inside PE 0603639A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what Other Transaction Authority (OTA) Contra has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603639A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Tank and Medium Caliber Ammunition (PE 0603639A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603639A
Machine access
Markdown twin /programs/0603639A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$139.6M
▲ 211% vs FY2026
FY2026 Enacted
$44.9M
In law

155mm Extended Range Artillery Munitions — one RDT&E project inside PE 0603639A. Congressional marks are recorded on the program element, not on a project.

Project DL5 — 155mm Extended Range Artillery Munitions — requests $139.6M in FY2027, 50% of the $277.2M requested for program element 0603639A. Year over year it grows 211% against FY2026.

Funding trajectory

Project DL5 funding, FY2026–FY2028

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075100125044.9FY26ENACTED139.6FY27REQUEST74.5FY28
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted44.9
FY2027Request139.6
FY2028Outyear74.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted$44.9M
FY2027 request$139.6M

Fiscal Year (FY) 2027 funding will support technology maturation and risk reduction of key system and subsystems improvements culminating in a Design Verification Test (DVT) to inform a Technical Review. This technical review will form the basis for a down selection of vendors that have the highest potential to meet cost, schedule, and…

Read the FY2027 plan →
Project DL5 — every activity in full →
Who's building it

Named performers on project DL5

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Other Transaction Authority (OTA) Contra
$101.5M · 73%
Yuma Proving Ground
$15.0M · 11%
Office of the Project Manager (PM) Comba
$2.1M · 1.5%
Project detail

What project DL5 buys

The Extended Range Artillery Munitions (ERAM) project supports the development of a 155mm system of systems that includes projectile, propellant, primer, fuse, and fuse setter which will deliver lethality and range overmatch in 155mm artillery weapon systems at more than double the current range from legacy artillery cannons and will be compatible with future 155mm artillery systems in contested Global Positioning System (GPS) environments and suboptimal atmospheric conditions. The ERAM development effort is part of an organic Long Range Precision Fires capability, which will provide overmatching cannon artillery range capability at both Tactical and operational Fires range by shaping the nature of the close fight through seeking moving and imprecisely located targets at extended ranges, increase range capability of the current 39 caliber cannon fleet and will also be compatible with future 52 caliber and above artillery weapon systems. Fiscal Year (FY) 2027 funding will support technology maturation and risk reduction of key system and subsystems improvements in performance in difficult use cases (such as GPS contested environments and suboptimal atmospheric conditions), and integration of the tactical warhead and seeker culminating in a series of Design Verification Testing (DVT) to achieve Technology Readiness Level (TRL) six (6) maturity.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$55.7M
▲ 162% vs FY2026
FY2026 Enacted
$21.2M
▼ 54% vs FY2025
FY2025 Actual
$46.3M
Prior year

Assured Precision Weapons and Munitions — one RDT&E project inside PE 0603639A. Congressional marks are recorded on the program element, not on a project.

Project FA5 — Assured Precision Weapons and Munitions — requests $55.7M in FY2027, 20% of the $277.2M requested for program element 0603639A. Year over year it grows 162% against FY2026.

Funding trajectory

Project FA5 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550046.3FY25ACTUAL21.2FY26ENACTED55.7FY27REQUEST42.8FY2843.1FY2943.1FY3043.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual46.3
FY2026Enacted21.2
FY2027Request55.7
FY2028Outyear42.8
FY2029Outyear43.1
FY2030Outyear43.1
FY2031Outyear43.6
Inside the project

12 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

APWM Integrated Product Support - Joint Lethality PNT and Navigation Warfare (NavWar) SME Working Integrated Product Team (WIPT) & Program Management▲ 2%
FY2025 actual$4.1M
FY2026 enacted$4.1M
FY2027 request$4.2M

Provides overall Project Program Management support for 643639A-FA5. The JL SMEs will continue to provide enabling technical expertise and support to the Joint Lethality community on advanced PNT, NavWar, and EW related modernization initiatives essential for munitions operating in a Joint complex threat environment. Specific support…

FY2025 actual$18.3M
FY2026 enacted
FY2027 request$13.2M

Work directly with USSF/USAF and MGUE Inc2 GPS prime vendors to finalize prototype PGM firmware and software solutions for the Inc2 ASIC and ancillary supporting electronics. Integrate PGM MGUE Inc2 ASIC onto Circuit Card Assemblies (CCAs) and receiver form factors. Prototype JROC-directed representative PGM lead platform to accept…

Read the FY2027 plan →
FY2025 actual$13.4M
FY2026 enacted$13.6M
FY2027 request$14.8M

Continue to support design reviews, experimentation, prototyping, testing, evaluation, and risk reduction of Army MGUE Inc2, AltNav, and NavWar by in-house Government activities and OTA / IDIQ contract efforts. Maintains an Army APNT and NavWar Munitions IPT working directly with Army T2COM, CPEs, and TLLMs. Facilitate Munition A-PNT and…

Read the FY2027 plan →
Accelerate NavStorm-M2 IntegrationNEW
FY2025 actual
FY2026 enacted
FY2027 request$13.3M

Prototyping of NavStorm-M2 GPS and M-GNSS capability for munition Artillery PGMs.

PGM Software Defined Receiver (SDRx) Phase II
FY2025 actual$6.6M
FY2026 enacted
FY2027 request

Complete PGM SDRx functional prototype to demonstrate intent of FY21 NDAA Section 1611 Congressional mandate for resilient and survivable PNT. Integrate physical PGM SDRx prototype into a representative large SWAP PGM to demonstrate critical "All in One" software defined navigation capabilities in a live fire event. Provide test reports…

Next Generation NavWar Tech Phase 1
FY2025 actual$1.3M
FY2026 enacted
FY2027 request

Complete and evaluate NavWar attack, sense, countermeasure, and SA technologies through controlled experiments to inform component prototyping of integrated dual mode multi-mission payloads and associated Fires C2 application prototyping.

Next Generation PNT Technologies Phase 2NEW
FY2025 actual
FY2026 enacted
FY2027 request$2.1M

Conduct signal trade studies to identify and down-select next generation PNT signals and SDR based technologies through comprehensive market research, threat analysis, and modeling and simulation. The selected signals will be prototyped and tested for integration into next generation rocket/missile and cannon lethality systems as well as…

Munition Deployed NavWar Dual Mode Attack/Sense Phase 1▼ 100%
FY2025 actual$1.4M
FY2026 enacted$0.5M
FY2027 request

Physical component prototyping and operational like experimentation planning of Next Gen NavWar Technology to include Software Defined Radio and Radio Frequency Smoke attack and sense payloads.

Munition Deployed NavWar Countermeasures▼ 53%
FY2025 actual
FY2026 enacted$1.6M
FY2027 request$0.7M

Integrating and demonstrating prototyped common munition payloads and munition support and decision aids for priority munition use cases.

MDN Multi-Spectral Countermeasures Phase 1NEW
FY2025 actual
FY2026 enacted
FY2027 request$2.2M

Building upon previous MDN prototyping and integration efforts, this project will develop enhanced multi-spectral CM payloads for integration into cargo munitions and other such delivery mechanisms and will evaluate effectiveness of these payloads against representative enemy NavWar/EW and A2/AD threats using China as the pacing threat.

Network Assisted Assured PNT and NavWar Phase 1▼ 100%
FY2025 actual$1.2M
FY2026 enacted$1.5M
FY2027 request

Initiate virtual prototyping across Fires SoS needed to automate use of Next Gen APNT Phase 1 and Next Gen NavWar Phase 1 technologies. Prototyping will focus on the following areas: 1. Hot start and efficient use of multi-source PNT solutions for W&Ms. 2. Automating the translation of NavWar SA to situational understanding to reduce…

Network Assisted Assured PNT and NavWar Phase 2NEW
FY2025 actual
FY2026 enacted
FY2027 request$5.3M

Conduct trade studies to identify and select a data dissemination source for trusted M-GNSS multi-source hot start data, required for use in future frequency diverse SDRx technology-based munitions PNT systems. Prototype munition resilient support and survivability automation of trusted M-GNSS data and interfaces for munitions.

Project FA5 — every activity in full →
Who's building it

Named performers on project FA5

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Armaments Systems Center; Fires Systm Ce
$12.5M · 22%
Project detail

What project FA5 buys

The Assured Precision Weapons and Munitions (APWM) - FA5 Project is focused on advanced risk mitigation, technology integration, expedited prototyping, and product support to rapidly identify, evaluate, mature, test, and demonstrate various assured precision related prototype technologies in munitions and munition resilient support and survivability components and subsystems within a complex environment with the overarching goal of solving tough operational problems and addressing critical capability gaps. The APWM project reinforces the Secretary of War's Acquisition Transformation Strategy, and the Army Transformation Initiative (ATI) major lines of effort through fast technology development and prototyping, which increases lethality and ensures future combat overmatch success of the Joint force against peer/near-peer adversaries and the China pacing threat. This project also aims to improve performance and affordability of Army and Joint capability portfolios via Joint Lethality (JL) Positioning, Navigation and Timing (PNT), Navigation Warfare (NavWar), and Army M-code Global Positioning System (GPS) coordinated efforts and integration of innovative industry contributions. The APWM project directly supports the top Army and Joint force modernization priorities in support of the NDS and multiple Public Law (PL) related congressional imperatives. Funding will support engagement by munition PNT and NavWar related Lethality experts in the development, evaluation, and technology delivery activities of the M-code GPS as well as the Army's continuous adaptation of PNT, NavWar, and Electronic Warfare (EW) enabled capabilities to achieve accurate extended range and hypersonic lethality, increase warfighter survivability, maximizing precision munition stowed kills, and countering Anti-Access/Area Denial (A2/AD) threats. The APWM project enables component and subsystem architecture input essential for precision munitions and other such lethality delivery mechanisms operating in a complex EW threat environments, M-code GPS and technology integration and evaluation (including verifying and validating this capability for future Joint precision munitions), and maturation of alternative PNT and EW/NavWar related technologies, components, payloads, and solutions.

R-3 lines of work
  • Product Development
  • Support
FY2027 Request
$28.1M
▲ 371% vs FY2026
FY2026 Enacted
$6.0M
In law

Mobile Long Range Precision Strike Pgm (M-LRPSM) — one RDT&E project inside PE 0603639A. Congressional marks are recorded on the program element, not on a project.

Project DN7 — Mobile Long Range Precision Strike Pgm (M-LRPSM) — requests $28.1M in FY2027, 10% of the $277.2M requested for program element 0603639A. Year over year it grows 371% against FY2026.

Funding trajectory

Project DN7 funding, FY2026–FY2028

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2506.0FY26ENACTED28.1FY27REQUEST20.1FY28
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted6.0
FY2027Request28.1
FY2028Outyear20.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

M-LRPSM Development and Integration▲ 371%
FY2025 actual
FY2026 enacted$6.0M
FY2027 request$28.1M

FY2027 funding provides test assets for Vendor 2 and completes qualification testing of Vendor 1 initiated in FY2026

Project DN7 — every activity in full →
Project detail

What project DN7 buys

DN7: The Mobile-Long Range Precision Strike Missile (M-LRPSM) is an approved Directed Requirement (DR). It must defeat Tier 1 thru Tier 3 Armor (stationary & defilade) Troops, Field Fortifications & Urban structures, and achieve a range of greater than 25 KM. It will be transportable by existing Infantry Brigade Combat Teams (IBCT) Light Tactical Vehicle platforms. It has the ability to adjust the missile flight, retarget, and abort, and have multiple missiles launch capability. It must be survivable and resilient in denied and degraded environments. The FY 2027 funding will provide system prototypes for candidate vendors and their participation in a flyoff demonstration. Following a down select one vendor at the end of the flyoff demonstration, FY 2027 funding will procure system prototypes to be used to conduct required testing to receive an Urgent Material Release.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
FY2027 Request
$27.2M
▲ 2256% vs FY2026
FY2026 Enacted
$1.2M
In law

Conventional Artillery Modernization — one RDT&E project inside PE 0603639A. Congressional marks are recorded on the program element, not on a project.

Project DK5 — Conventional Artillery Modernization — requests $27.2M in FY2027, 9.8% of the $277.2M requested for program element 0603639A. Year over year it grows 2256% against FY2026.

Funding trajectory

Project DK5 funding, FY2026–FY2029

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2501.2FY26ENACTED27.2FY27REQUEST28.2FY2818.3FY29
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted1.2
FY2027Request27.2
FY2028Outyear28.2
FY2029Outyear18.3
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

155mm Modular Artillery for Combat Effectiveness (MACE)▲ 2100%
FY2025 actual
FY2026 enacted$1.0M
FY2027 request$22.0M

FY 2027 funding will support technology maturation and munition development, while procuring test hardware to support lethal payload integration.

155mm Extended Range (ER) Cargo▲ 3263%
FY2025 actual
FY2026 enacted$0.2M
FY2027 request$5.2M

FY 2027 funding will support technology maturation and the development of range extension systems for cargo projectiles, while supporting the modeling and simulation of lethal and non lethal payloads to advance system development.

Project DK5 — every activity in full →
Who's building it

Named performers on project DK5

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

DoW Ordnance
$15.1M · 55%
Office of the Project Manager (PM) Comba
$0.1M · 0.4%
Project detail

What project DK5 buys

The 155 millimeter (mm) High Explosive Conventional Artillery Modernization will develop common artillery projectiles capable of accurate delivery of multiple payloads to provide US Army's Field Artillery units with lethal and nonlethal area effects at ranges necessary to disable and destroy a broad set of targets within multiple threat formations. The Modular Artillery for Combat Effectiveness (MACE) line of effort will develop lethal area effects. The Extended Range (ER) Cargo line of effort will develop lethal and non-lethal areas effects at the longer ranges necessary to enable transformation in contact. This effort is executing an evolutionary approach to ensure a common projectile can support multiple cargo capabilities, including but not limited to lethal, Radio Frequency (RF) obscuration, visible obscuration, Intelligence, Surveillance, and Reconnaissance (ISR), Infra-red (IR) illumination, visible illumination, electronic attack, Terrain Shaping Obstacles, and future cargo capabilities. Fiscal Year (FY) 2027 funding will support the Technology Readiness Level (TRL) 6 demonstration, down-selection, contract award for system development, and technical assessment in support of the Army's Field Artillery modernization objectives.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$24.7M
▲ 139% vs FY2026
FY2026 Enacted
$10.3M
In law

155mm Artillery Propulsion Mod - Adv Component Dev — one RDT&E project inside PE 0603639A. Congressional marks are recorded on the program element, not on a project.

Project DK7 — 155mm Artillery Propulsion Mod - Adv Component Dev — requests $24.7M in FY2027, 8.9% of the $277.2M requested for program element 0603639A. Year over year it grows 139% against FY2026.

Funding trajectory

Project DK7 funding, FY2026–FY2028

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25010.3FY26ENACTED24.7FY27REQUEST13.1FY28
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted10.3
FY2027Request24.7
FY2028Outyear13.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual
FY2026 enacted$10.3M
FY2027 request$24.7M

Fiscal Year (FY) 2027 funding will support continued prototyping and testing of propelling charges, combustible cases, additives, and ignition components to advance technologies and characterize performance with the down-selected Mobile Tactical Cannon (MTC) Platform.

Read the FY2027 plan →
Project DK7 — every activity in full →
Who's building it

Named performers on project DK7

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

DoW Ordnance
$1.3M · 5.1%
Office of the Project Manager (PM) Comba
$0.3M · 1.2%
Project detail

What project DK7 buys

The 155mm Artillery Propulsion Modernization (Advanced Component Development) project supports the United States Army's Field Artillery modernization objectives by developing and maturing three propulsion system components: (1) modular charge that achieves minimum to intermediate ranges, (2) supercharge that achieves maximum range, and (3) percussion primer that initiates both the modular and supercharges. Development efforts also include the design of packaging solutions required for protection during transportation and long-term storage, digital engineering, test measurement devices and modeling and simulation tools. Design emphasis will shift from Joint Ballistic Memorandum of Understanding (JBMOU) compatibility to down selected Mobile Tactical Cannon (MTC) that maximizes interoperability with foreign allies, ensuring that the components support manufacturability within the National Technology and Industrial Base (NTIB). Fiscal Year (FY) 2027 funding will support continued prototyping and testing of propelling charges, combustible cases, additives, and ignition components to advance technologies that improve propellant effectiveness, extend cannon life, enhance primer and charge ignition performance, optimize system-level handling, rates of fire, and overall propulsion suitability and survivability.

R-3 lines of work
  • Management Services
  • Product Development
  • Support
  • Test and Evaluation
FY2027 Request
$2.0M
▲ 1.8% vs FY2026
FY2026 Enacted
$1.9M
▲ 3.6% vs FY2025
FY2025 Actual
$1.9M
Prior year

Ammunition Logistics Prototyping — one RDT&E project inside PE 0603639A. Congressional marks are recorded on the program element, not on a project.

Project EC3 — Ammunition Logistics Prototyping — requests $2.0M in FY2027, 0.7% of the $277.2M requested for program element 0603639A. Year over year it grows 1.8% against FY2026.

Funding trajectory

Project EC3 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

01.9FY25ACTUAL1.9FY26ENACTED2.0FY27REQUEST2.0FY282.0FY292.0FY302.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual1.9
FY2026Enacted1.9
FY2027Request2.0
FY2028Outyear2.0
FY2029Outyear2.0
FY2030Outyear2.0
FY2031Outyear2.0
Inside the project

3 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Munitions Health and Inventory Monitoring Systems
FY2025 actual$1.5M
FY2026 enacted
FY2027 request

FY2025 accomplishments Develop and mature prototype munitions monitoring systems to track inventory within the maneuver formations to ensure ammunition posture is synchronized with the battlefield commander's intent. Key prototype attributes are precise ground truth of all ammunition issued from the Ammunition Storage Areas and handed off to the sustainment formations, monitor munition environmental exposure, and system architecture that maintains all relevant information within the associated data fabric. Information collected such as temperature, humidity, shock, and vibration will be used to adjust the ballistic kernel parameters to improve Control Entry Point (CEP) for any future fire mission. One or more…

Munitions Containerization Systems
FY2025 actual$0.4M
FY2026 enacted
FY2027 request

FY2025 accomplishments Develop and mature a prototype ammunition consolidator selected through an early Soldier touch point suitable for providing protection to all field artillery ammunition items as they are transported by tactical wheeled vehicle organic to the Forward Support Company and Ammunition Sections within the maneuver formations. The selected consolidator will be compliant with the emerging inventory/environmental sensor concepts under development elsewhere within the JPEO A&A portfolio and incorporate automation friendly features. Prototype consolidator concepts will supplement potential inner-packaging components and stress low cost, lightweight and interoperability with future manual and automated…

Munitions Distribution Management and Inventory Monitoring Systems▲ 2%
FY2025 actual
FY2026 enacted$1.9M
FY2027 request$2.0M

FY2027 planned work The program will advance the Army's munitions distribution management and inventory monitoring capabilities through prototyping and risk reduction activities and integrating them within maneuver formations. Efforts will focus on maturing technologies for tracking munitions type, quantities and location ensuring ammunition posture and configuration aligns with battlefield requirements. Feasibility assessment of sensors incorporated on weapons systems and munition stockpiles will be undertaken, with recorded data being used to optimize operational readiness. Ammunition specific data collected at the point of consumption will be aggregated and interfaced with enterprise systems to report…

FY2026 to FY2027 change Increase due to initiation of prototyping for common Rocket/Missile and Cannon automation tools to automate mission planning and execution of multi-domain converged effects across lethality and sustainment.

FY2026 plans — current year Conduct prototyping and risk reduction activities of theater-wide adaptive ammunition stockage objective planning, distribution support, and ammunition load and storage optimization tools. Establish data products and tools within the Army Data Catalog informing architecture, integration and implementation guidance for applications that support Setting and Sustaining the Theater for Ammunition. Continue to prototype and demonstrate solutions needed within the force structure for enabling setting and sustaining the theater for ammunition enterprise mission to include Advanced Field Artillery Tactical Data System/Artillery Execution Suite, Paladin Digital Fire Control System, Tactical Data…

Who's building it

Named performers on project EC3

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Armament Research
$0.8M · 38%
Sherpa 6
$0.4M · 20%
Project detail

What project EC3 buys

This project supports the future force by improving the distribution, management, reliability, and survivability of ammunition through the advanced development, integration, and demonstration of logistics system enablers in alignment with Transformation In Contact and Deliberate Transformation. These enablers will improve the resiliency, efficiency and effectiveness of ammunition operations, to include retrograde, while reducing the logistics footprint on the battlefield. Technology areas addressed include handling, distribution, management (strategic and tactical), prognostics, diagnostics, asset visibility, explosives safety, autonomy friendly packaging, and palletization. The efficient deployment and sustainment of reliable ammunition is vital to success on the battlefield. This project enhances the operational effectiveness of the ammunition logistics system to ensure the distribution of reliable ammunition to the Warfighter.

R-3 lines of work
  • Product Development
  • Support
FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$2.5M
▼ 92% vs FY2025
FY2025 Actual
$30.6M
Prior year

Long Range Precision Munition (LRPM) — one RDT&E project inside PE 0603639A. Congressional marks are recorded on the program element, not on a project.

Project CD8 — Long Range Precision Munition (LRPM) — requests in FY2027, 0.0% of the $277.2M requested for program element 0603639A. Year over year it falls 100% against FY2026.

Funding trajectory

Project CD8 funding, FY2025–FY2026

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25030.6FY25ACTUAL2.5FY26ENACTED
Actual Enacted
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual30.6
FY2026Enacted2.5
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Long Range Precision Munition
FY2025 actual$30.6M
FY2026 enacted
FY2027 request

FY2025 accomplishments Mature design and Modeling and Simulation and continue Prototype development. Vendor(s) deliverable(s) to include design, Modeling and Simulation, prototyping, technology studies, design and development, testing, and technical evaluations leading to a design review with vendor(s).

Project detail

What project CD8 buys

Long Range Precision Munition (LRPM) is the lethal variant of the Launched Effects (LE) Family of Systems which provide a range of capabilities through variations of platforms, payloads, and mission systems. LE provides tactical and operational flexibility through collaboration of heterogeneous groups of LE launched from multiple domains (land and air) in conjunction with other manned platforms, C2, unmanned systems, and sensors throughout the operational environment. The ability to interoperate and coordinate with other LE systems at long ranges and adapt to changing threats is a core concept of the Launched Effects Abbreviated Capability Development Document validated in June 2024. Primary target set for LRPM is Integrated Air Defense Systems. LRPM will provide Army Aviation and Ground Forces with a precise long range munition system to rapidly respond in a combat environment to improve the lethality and stand-off of Warfighters and aviation platforms in an Anti-Access Area Denial (A2AD) and positioning, navigation, and timing (PNT) denied environment. Project CD8 - Long Range Precision Munition (LRPM) was transferred to PE 0605345A/Project A56 in FY 2026.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation