RDT&E Project · President's Budget PB2027

Mobile Long Range Precision Strike Pgm (M-LRPSM)

FY2027 Request
$28.1M
▲ 371% vs FY2026
HitchAI read

Project DN7 — Mobile Long Range Precision Strike Pgm (M-LRPSM) requests $28.1M in FY2027, 10% of the $277.2M requested for program element 0603639A, up 371% on FY2026. 1 R-2A activity decomposes the request.

FY2027 Request
$28.1M
▲ 371% vs FY2026
FY2026 Enacted
$6.0M
In law
Project detail

What project DN7 buys

DN7: The Mobile-Long Range Precision Strike Missile (M-LRPSM) is an approved Directed Requirement (DR). It must defeat Tier 1 thru Tier 3 Armor (stationary & defilade) Troops, Field Fortifications & Urban structures, and achieve a range of greater than 25 KM. It will be transportable by existing Infantry Brigade Combat Teams (IBCT) Light Tactical Vehicle platforms. It has the ability to adjust the missile flight, retarget, and abort, and have multiple missiles launch capability. It must be survivable and resilient in denied and degraded environments. The FY 2027 funding will provide system prototypes for candidate vendors and their participation in a flyoff demonstration. Following a down select one vendor at the end of the flyoff demonstration, FY 2027 funding will procure system prototypes to be used to conduct required testing to receive an Urgent Material Release.

R-3 lines of work
  • Management Services
  • Product Development
  • Test and Evaluation
Funding trajectory

Project DN7 funding, FY2026–FY2028

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2506.0FY26ENACTED28.1FY27REQUEST20.1FY28
Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2026Enacted6.0
FY2027Request28.1
FY2028Outyear20.1
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Coverage is partial across the corpus, so count activities, never total them.

M-LRPSM Development and Integration▲ 371%
FY2025 actual
FY2026 enacted$6.0M
FY2027 request$28.1M

FY2027 planned work FY2027 funding provides test assets for Vendor 2 and completes qualification testing of Vendor 1 initiated in FY2026

FY2026 to FY2027 change The increase in funding represents the fabrication of Vendor 2 system prototypes required for qualification testing and completes the testing efforts being conducted for Vendor 1

FY2026 plans — current year Product improvements based on continuous soldier involvement in the development and fielding of the M-LRPSM.