RDT&E Program Element · President's Budget PB2027

Nuclear Weapons Modernization

PE 0101125F·U.S. Air Force·Approp. 3600 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$23.1M
◆ Development crest → decline
◆ New start in FY2027 — no prior-year funding
HitchAI read

U.S. Air Force requests $23.1M in FY2027 against nothing enacted in FY2026 — the program's peak, with nothing planned by FY2031. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. 309th leads the industry work.

FY2027 Request
$23.1M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Air Force is requesting $23.1M for Nuclear Weapons Modernization under RDT&E program element 0101125F, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

00.0FY25ACTUAL0.0FY26ENACTED23.1FY27REQUEST22.0FY2810.0FY291.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request23.1
FY2028Outyear22.0
FY2029Outyear10.0
FY2030Outyear1.0
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0101125F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$23.1M
House NDAA (HASC)HASC
$23.1M full · +$0
Senate NDAA (SASC)SASC
$23.1M full · +$0
House Approps (HAC-D)HAC_D
$23.1M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

Where FY2027 funding flowsShare$M
Industry primes1.9%0.4
Other / unspecified98%22.6
FY2027 request100%23.1
Program detail

Mission & acquisition strategy

This project will deliver the Next Generation Nuclear Gravity Bomb, a critical capability to deter strategic attacks against the United States and its allies. This program directly supports a directive from the 2022 Nuclear Posture Review (NPR) to develop a comprehensive strategy for the defeat of hard and deeply buried targets. This is directly aligned with both the 2025 National Security Strategy (NSS) released by President Donald J. Trump, as well as the 2026 National Defense Strategy (NDS) released by Secretary of War Pete Hegseth. Both documents capture the need to modernize and adapt our nuclear forces to our overall national defense strategies.

The acquisition strategy is uniquely structured to be flexible and data-driven, with the final procurement pathway contingent on the results of advanced prototyping efforts conducted by the Air Force Research Laboratory (AFRL). The data and insights gained from AFRL's work are pivotal and will inform a key strategic decision between two primary acquisition approaches: 1. DoW-Led Tail Kit Assembly (TKA) Acquisition: If the data supports a standard development effort, the program will follow a model like the successful B61 LEP program.

Project 657007, 657014 — B61 LIFE EXTENSION PROGRAM
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0101125F is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what 309th has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0101125F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Nuclear Weapons Modernization (PE 0101125F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0101125F
Machine access
Markdown twin /programs/0101125F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$13.0M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

B61 LIFE EXTENSION PROGRAM — one RDT&E project inside PE 0101125F. Congressional marks are recorded on the program element, not on a project.

Project 657007 — B61 LIFE EXTENSION PROGRAM — requests $13.0M in FY2027, 56% of the $23.1M requested for program element 0101125F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 657007 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.0FY26ENACTED13.0FY27REQUEST22.0FY2810.0FY291.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request13.0
FY2028Outyear22.0
FY2029Outyear10.0
FY2030Outyear1.0
FY2031Outyear0.0
Inside the project

4 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Engineering & Manufacturing Development Contract (B61)NEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$2.8M

Fund OEM to update the upgrade the TKA through a new OFP software.

AUR Technical Integration (B61)NEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$0.8M

Fund government-led system engineering and integration tasks to ensure All Up Round is compatible with all required aircraft and system integration. Key activities include verifying Interface Control Documents and support B61 LEP Project Officers Group.

Aircraft Integration (B61)NEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$8.5M

Execute planned activities for integration onto threshold aircraft, e.g. mission planning software, lab-based verification testing, etc.

Test Support (B61)NEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$0.9M

Fund test support activities for TKA and all-up-round validation and verification, e.g. flight tests, secure test range time, and analysis of test data.

Project 657007 — every activity in full →
Who's building it

Named performers on project 657007

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

309th
$0.4M · 3.3%
Project detail

What project 657007 buys

This project supports the B61 Life Extension Program (LEP), a critical national security initiative to modernize a key component of the nuclear triad. The B61 LEP integrates Department of Energy (DOE) efforts to extend the warhead's service life with Department of War (DoW) efforts to develop a modern, guided Tail Kit Assembly (TKA). This ensures the weapon maintains its operational effectiveness and mission characteristics. Programmatic integration of this joint Air Force-led program is accomplished through the B61 LEP Project Officers Group (POG) and its subgroups, in accordance with the National Nuclear Security Administration (NNSA) and Air Force Nuclear Weapons Center (AFNWC) Memorandum of Understanding. This project is a new start initiative beginning in FY 2027. No funding was allocated in FY 2025 or FY 2026. The total cost of the B61 LEP Middle Tier of Acquisition (MTA) effort is $46 million, including RDT&E and procurement of prototype units. The B61 LEP is fully funded across the Future Years Defense Program. Funding will be used to award the prime contract and initiate critical engineering and integration activities. Specifically, this funding will enable: • System Engineering: To ensure the All-Up Round (AUR) technical integration is successful and all system interfaces are properly defined. • Aircraft Integration: To begin software development and testing to ensure the new B61 variant is fully compatible with threshold aircraft mission planning systems. • Test and Evaluation: To fund test planning, range coordination, and support for validation and verification activities, which are critical for eventual nuclear certification. • Program Management: To provide essential government oversight of cost, schedule, and performance, ensuring the program remains on track to deliver this vital capability to the warfighter. The acquisition strategy utilizes a low-risk, expedited Mid-Tier Acquisition (MTA) pathway by modifying the existing, highly reliable B61-12 TKA, which significantly reduces technical and programmatic risk. This funding is critical to maintaining the program's schedule and delivering a modernized, credible deterrent capability. This program element included all necessary expenses required to manage, execute, and deliver weapon system capability.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$10.1M
No FY2026 funding
FY2026 Enacted
$0.0M
No FY2025 funding
FY2025 Actual
$0.0M
Prior year

Next Gen Gravity Bomb — one RDT&E project inside PE 0101125F. Congressional marks are recorded on the program element, not on a project.

Project 657014 — Next Gen Gravity Bomb — requests $10.1M in FY2027, 44% of the $23.1M requested for program element 0101125F. It is a new start — no prior-year or current-year money.

Funding trajectory

Project 657014 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.0FY25ACTUAL0.0FY26ENACTED10.1FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.0
FY2026Enacted0.0
FY2027Request10.1
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

Tail-kitNEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$6.5M

Initiate acquisition activities based on down-select decision of prototyping efforts.

Test and EvaluationNEW
FY2025 actual
FY2026 enacted$0.0M
FY2027 request$3.6M

Fund T&E planning for selected system design, e.g. develop T&E Master Plan, coordination with test agencies to schedule future activities, etc.

Project 657014 — every activity in full →
Project detail

What project 657014 buys

This project will deliver the Next Generation Nuclear Gravity Bomb, a critical capability to deter strategic attacks against the United States and its allies. This program directly supports a directive from the 2022 Nuclear Posture Review (NPR) to develop a comprehensive strategy for the defeat of hard and deeply buried targets. This is directly aligned with both the 2025 National Security Strategy (NSS) released by President Donald J. Trump, as well as the 2026 National Defense Strategy (NDS) released by Secretary of War Pete Hegseth. Both documents capture the need to modernize and adapt our nuclear forces to our overall national defense strategies. The primary goal is to successfully transition the current prototyping effort, conducted by the Air Force Research Laboratory (AFRL), into a formal acquisition program and establish a dedicated System Program Office (SPO). The SPO will be responsible for refining requirements, defining Key Performance Parameters (KPPs), overseeing technical integration, and managing the system lifecycle to deliver a credible and effective deterrent. This project is a new start initiative beginning in FY 2027. No funding was allocated in FY 2025 or FY 2026. During this pre-acquisition period, AFRL-led prototyping efforts were underway to mature key technologies and reduce risk for the formal program. The FY 2027 budget request of 10.066 million is required to formally establish the program and initiate critical acquisition activities. This funding is foundational to transitioning from research into a structured development program. Key activities in FY 2027 include: • Establish SPO: To fund operational costs necessary to establish the System Program Office, enabling management of the acquisition process to include oversight of cost, schedule, and performance objectives, and facilitate the execution and tracking of program milestones. • Acquisition Initiation: To begin formal acquisition of the Tailkit Assembly (TKA) by funding studies, requirements definition, development of the Request for Proposal (RFP), and source selection planning. • Test and Evaluation Planning: To develop the initial Test and Evaluation Master Plan (TEMP) and coordinate with test agencies for future activities. • Weapon Planning Kick-Off: To formally begin program execution and integrated planning across all functional areas.

R-3 lines of work
  • Support
  • Test and Evaluation
  • Management Services