Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, the U.S. Army is requesting $235.6M for Expanded Mission Area Missile (EMAM) under RDT&E program element 0604019A, up 305% over FY2026. In the FY2027 defense authorization, House approps moved to cut it to $0.0M.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 82.7 |
| FY2026 | Enacted | 58.2 |
| FY2027 | Request | 235.6 |
| FY2028 | Outyear | 361.1 |
| FY2029 | Outyear | 241.3 |
| FY2030 | Outyear | 126.0 |
| FY2031 | Outyear | 216.2 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
3 projects roll up into PE 0604019A
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 305% overall, which can hide much larger swings below.
IFPC High Power Microwave (HPM)
IFPC High Energy Laser
IFPC is funded on 5 lines across 2 appropriations
This program element requests nothing for IFPC in FY2027. The program is still funded — $1.80B of it — but on other lines, which usually means the work is transferring.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| INDIRECT FIRE PROTECTION CAPABILITY INC 2-I | Procurement | Army | 1,626.0 |
| IFPC Increment 2 - Block 2 | RDT&E | Army | 140.3 |
| IFPC Increment 2 - Block 1 | RDT&E | Army | 35.1 |
| IFPC total | Army | 1,801.4 |
Lines whose title names the program. 8 further lines only mention IFPC in their justification text — those fund something else and are deliberately excluded from the total.
The request is contested
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Where the FY2027 request goes
Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.
| Where FY2027 funding flows | Share | $M |
|---|---|---|
| Other / unspecified | 100% | 235.6 |
| FY2027 request | 100% | 235.6 |
Mission & acquisition strategy
These funding lines are directly aligned to the Army Air and Missile Defense Modernization Priority. Work in this PE, the Expanded Mission Area Missile (EMAM) program, supports the Integrated Air and Missile Defense (IAMD) architecture and provides Directed Energy Integrated Fires Protection Capability (DE-IFPC) systems to defeat Cruise Missiles (CM); single and swarming Unmanned Aircraft System (UAS); Rocket, Artillery, and Mortar (RAM) threats; Fixed Wing (FW); and Rotary Wing (RW) manned aircraft.
The Army is waiting on FY 2026 OSW SCO HGWS development outcomes prior to making decisions on system architecture design, acquisition pathway, and acquisition strategy. The program is posturing for entrance into a Middle Tier of Acquisition for Rapid Prototyping (MTA-RP) pathway. The CBADS requirement document, an Abbreviated Capability Development Document (A-CDD) is on pause in the Army Requirements Oversight Council (AROC) staffing process pending outcomes of the FY 2026 OSW SCO HGWS development and test outcomes as well as TRADOC Requirements Analysis Center - White Sands Missile Range (TRAC-WSMR) analysis on cannon-based air defense schedule to conclude 3QFY26.
- Management Services
- Product Development
- Test and Evaluation
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604019A.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksMulti-Domain Artillery Cannon System (MDACS) — one RDT&E project inside PE 0604019A. Congressional marks are recorded on the program element, not on a project.
Project DJ5 — Multi-Domain Artillery Cannon System (MDACS) — requests $235.6M in FY2027, 100% of the $235.6M requested for program element 0604019A.
Project DJ5 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 30.0 |
| FY2027 | Request | 235.6 |
| FY2028 | Outyear | 361.1 |
| FY2029 | Outyear | 241.3 |
| FY2030 | Outyear | 126.0 |
| FY2031 | Outyear | 216.2 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
FY 2027 funds will be used to develop a baseline architecture, allocate subsystem requirements, and initiate CBAD prime item final designs. All remaining long lead material purchases will be placed on contract. Component and subsystem Contractor Verification Testing will be initiated. Software algorithm development will also be…
Read the FY2027 plan →What project DJ5 buys
The Cannon Based Air Defense System (CBADS) mission is to defend Joint Force fixed and semi-fixed locations against attack by a broad spectrum of Unmanned Aerial Systems (UASs), Cruise Missiles (CMs), Fixed Wing (FW), Rotary Wing (RW), and other advanced air and missile threats and to complement existing air and missile defenses by operating in integrated or stand-alone operational scenarios. Additionally, CBADS may provide a future surface-to-surface long-range precision fires capability. CBADS is a rapid prototype and Integrated Air and Missile Defense (IAMD) Battle Command System (IBCS) integrated system consisting of a Multi-Domain Artillery Cannon (MDAC), Multi-Function Precision Radar (MFPR), Multi-Domain Battle Manager (MDBM), Hypervelocity Projectiles (HVP), and ammunition handling vehicles. CBADS will build onto the Army Integrated Air and Missile Defense (AIAMD) open systems architecture allowing seamless sensor and shooter connectivity for a layered defense with a mission command structure integrated into the IAMD Battle Command System (IBCS). CBADS will increase battlefield flexibility and raid capacity, resulting in increased AMD effectiveness and efficiency and reduced attrition of advanced interceptor missiles in the Army's inventory. The Army will leverage current Office of the Secretary of War (OSW) Strategic Capabilities Office (SCO) investments in the Hypervelocity Gun Weapon System (HGWS) to develop an Army design tailored to address Army requirements and assess CBADS at a Battery level in FY 2030. The prototype will inform an enduring capability requirement and decision in late FY 2026. The outcome of the decision review will be to determine whether to build a battery prototype for fielding or to initiate a traditional acquisition program for CBADS to meet the FY 2030 fielding date. .
- Management Services
- Product Development
- Test and Evaluation
IFPC High Power Microwave (HPM) — one RDT&E project inside PE 0604019A. Congressional marks are recorded on the program element, not on a project.
Project CO6 — IFPC High Power Microwave (HPM) — requests — in FY2027, 0.0% of the $235.6M requested for program element 0604019A. Year over year it falls 100% against FY2026.
Project CO6 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 33.9 |
| FY2026 | Enacted | 41.8 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Will support issuance of the residual combat capability to a unit, new threat target software updates, and Contractor Logistics Support (CLS) which facilitates continued operational assessment and a potential future transition to an acquisition program.
What project CO6 buys
This funding line is directly aligned to the Army Air and Missile Defense Modernization Priority. The Directed Energy Integrated Fires Protection Capability (DE-IFPC) High Power Microwave (HPM) is a Counter-Unmanned Aircraft Systems (C-UAS) capability consisting of HPM prototypes with residual combat capability in support of Multi-Domain Operations (MDO). The IFPC-HPM program provides the Army with HPM prototype weapon systems of various designs for short-range defense against single Unmanned Aircraft Systems (UAS) and swarms. IFPC-HPM funds an improved mechanism to effectively confront emerging threats and advance the United States' military dominance in accordance with the 2025 Interim National Defense Strategy. Efforts include development, acquisition, test and evaluation, assessment, maturation, and future transition of prototype technologies to an acquisition program.
- Management Services
- Product Development
- Support
- Test and Evaluation
IFPC High Energy Laser — one RDT&E project inside PE 0604019A. Congressional marks are recorded on the program element, not on a project.
Project BU9 — IFPC High Energy Laser — requests — in FY2027, 0.0% of the $235.6M requested for program element 0604019A. Year over year it falls 100% against FY2026.
Project BU9 funding, FY2025–FY2026
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 18.8 |
| FY2026 | Enacted | 16.4 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
Complete prototype fabrication, lab acceptance and Continuous Soldier Integration.
What project BU9 buys
This funding line is directly aligned to the Army Air and Missile Defense Modernization Priority. The Directed Energy Integrated Fires Protection Capability (DE-IFPC) High Energy Laser (HEL) is an Air Defense capability for defense of fixed and semi-fixed sites from Cruise Missiles (CM); Unmanned Aircraft Systems (UAS); Rocket, Artillery, and Mortar (RAM); Fixed Wing (FW); and Rotary Wing (RW) threats. This project will deliver an operationally effective rapid prototype capability in FY 2026. IFPC-HEL funds an improved mechanism to effectively confront emerging threats and advance the U.S. military dominance in accordance with the 2026 National Defense Strategy. Efforts include development, acquisition, test and evaluation, assessment, maturation, and potential future transition of the prototype technology to an acquisition program.
- Management Services
- Product Development
- Support
- Test and Evaluation