RDT&E Program Element · President's Budget PB2027

Manufacturing Technologies

PE 0603680F·U.S. Air Force·Approp. 3600 — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$99.9M
Air Force · RDT&E
HitchAI read

U.S. Air Force funding falls 71% to a $99.9M request in FY2027 (down from a FY2026 peak), sustained across the five-year plan. In the FY2027 defense authorization, the House added 2.5% (to $102.4M); the Senate funded it in full; House appropriators added 229% (to $328.2M).

FY2027 Request
$99.9M
▼ 71% vs FY2026
FY2026 Enacted
$342.5M
▲ 190% vs FY2025
FY2025 Actual
$118.1M
Prior year

For fiscal year 2027, the U.S. Air Force is requesting $99.9M for Manufacturing Technologies under RDT&E program element 0603680F, down 71% from FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

1002003000118.1FY25ACTUAL342.5FY26ENACTED99.9FY27REQUEST97.7FY28109.5FY29112.9FY30101.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual118.1
FY2026Enacted342.5
FY2027Request99.9
FY2028Outyear97.7
FY2029Outyear109.5
FY2030Outyear112.9
FY2031Outyear101.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0603680F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -71% overall, which can hide much larger swings below.

Project 635280

Manufacturing Technologies

$99.9MFY2027 request ▼ 71%
FY2025 actual$118.1M
FY2026 enacted$342.5M
FY2027 request$99.9M

This program executes technical efforts to develop and maintain an affordable and reliable industrial base and manufacturing capability responsive to Department of the Air Force warfighter needs. The program develops and improves manufacturing technologies and processes to reduce transition risk, enable cost reduction, improve component and system quality, increase readiness and affordable mission availability, enhance industrial capability, and promote transformation through the industrial base. Value stream modifications and manufacturing throughput improvements are implemented to shorten weapon system cycle times during design, development, production, and sustainment. Cost savings are realized through early engagement with stakeholders to promote producible designs, ensuring the industrial base will be ready to manufacture at the needed quantities. Manufacturing technologies objectives are conducted through industrial partnerships that enable targeted investment of manufacturing technologies and reduce risk in the industrial supply chain for existing weapon system upgrades and new warfighter systems. This program is accomplished by the Air Force Research Laboratory (AFRL). AFRL is focused on high-impact, multi-domain science & technology (S&T) solutions that drive innovation now while laying the groundwork for the Air and Space Force to win the future fight. AFRL effectively synchronizes the Department of the Air Force (DAF) S&T enterprise and workforce to align towards the most consequential DAF priorities and accelerate the delivery of game-changing S&T. Funds in this PE may be used to investigate specified technology advancements in air, space, and/or cyber domains. This program includes funding for the requisite DAF Science & Engineering (S&E) and mission enabling civilian workforce with the necessary technical competencies to develop, manage, and deliver science & technology capabilities. The use of program funds in this program element is in conjunction with the civilian pay expenses budgeted in the following program elements: 1206601SF, 1206616SF, 0601102F, 0602020F, 0602102F, 0602202F, 0602203F, 0602204F, 0602298F, 0602336F, 0602602F, 0602605F, and 0602788F. In FY 2027, $8.114 million is budgeted in this program for 41 direct Full-Time Equivalent (FTE) civilians.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
FY2025 actual$16.6M
FY2026 enacted$12.0M
FY2027 request$11.6M

- Complete the advancement of high demand specialized manufacturing technologies including additive manufacturing, robotics and automation to develop cost effective conventional production, overhaul, and specialty material repair technologies to enable affordable sustainment of legacy aircraft systems. - Continue the development of…

Read the FY2027 plan →
FY2025 actual$13.8M
FY2026 enacted$17.1M
FY2027 request$16.5M

- Continue to enable advanced manufacturing processes, techniques, and equipment availability through automation, robotics, mixed reality and digital transformations for reducing materiel weapons acquisition, maintenance and repair costs. - Continue the development and demonstration of digital engineering concepts into manufacturing…

Read the FY2027 plan →
FY2025 actual$8.4M
FY2026 enacted$9.4M
FY2027 request$18.1M

- Continue the development of high demand manufacturing technologies including low cost for attritable systems, thermal protection materials for high temperature applications, and other manufacturing technologies geared toward realizing the future force through autonomous collaborative platforms, low-cost munitions, hypersonic weapons…

Read the FY2027 plan →
FY2025 actual$0.0M
FY2026 enacted$0.0M
FY2027 request$53.6M

- Commence the development of domestic sources of advanced batteries including higher energy and power densities, and resilience to extreme environments. Activities include: -- Development of secondary batteries capable of high discharge rates (greater than 10 C-rate), high-energy density (over 350 watt hours per kilogram), and extreme…

Read the FY2027 plan →
Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$99.9M
House NDAA (HASC)HASC
$102.4M +$2.5M · +2.5%
Senate NDAA (SASC)SASC
$99.9M full · +$0
House Approps (HAC-D)HAC_D
$328.2M +$228.3M · +229%
▲ $228.3M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603680F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Manufacturing Technologies (PE 0603680F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603680F
Machine access
Markdown twin /programs/0603680F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks