RDT&E Project · President's Budget PB2027

Congressional Adds

Project 9999·PE 0603724N — Navy Energy Program·U.S. Navy·BA4
FY2027 Request
$0.0M
▼ 100% vs FY2026
HitchAI read

Project 9999 — Congressional Adds requests $0.0M in FY2027, 0.0% of the $59.6M requested for program element 0603724N, down 100% on FY2026.

FY2027 Request
$0.0M
▼ 100% vs FY2026
FY2026 Enacted
$11.6M
▲ 140% vs FY2025
FY2025 Actual
$4.8M
Prior year
Project detail

What project 9999 buys

Project C391: Cargo drone advanced batteries. Project CA31: Modernizing Shore Power Infrastructure The Naval Air Warfare Center Aircraft Division is responsible for the research, development and Test and Evaluation (RDTE) of Unmanned Air Systems and all the subsystems that are needed for them to operate successfully. Group 3 Logistics UAS's are a critical focus area and heavily dependent on lithium-Ion Battery packs currently manufactured outside the US. These battery solutions do not meet the quality, reliability and safety needed to meet emerging mission requirements safely in a maritime environment. Design, develop, fabricate, test and integrate ultra-high-capacity batteries into emerging logistics UAS platforms is a critical enabler to meeting emerging operational requirements in a contested environment. This program coordinates battery developers and fabricators, technical SMEs across the DON and UAS designers/builders to produce a cost and time effective common solution applicable to multiple systems to meet operational and safety requirements. This funding provides a program increase dedicated to modernizing shore power infrastructure.

R-3 lines of work
  • Product Development
  • Management Services
Funding trajectory

Project 9999 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.8FY25ACTUAL11.6FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.8
FY2026Enacted11.6
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0