RDT&E Program Element · President's Budget PB2027

MLRS Product Improvement Program

PE 0603778A·U.S. Army·Approp. 2040 — RDT&E·BA7 — Operational System Development
FY2027 Request
$17.8M
Army · RDT&E
HitchAI read

U.S. Army funding ramps 21% to a $17.8M request in FY2027, sustained across the five-year plan. In the FY2027 defense authorization, the House funded it in full; the Senate added 112% (to $37.8M); House appropriators funded it in full. BAE leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$17.8M
▲ 21% vs FY2026
FY2026 Enacted
$14.6M
▲ 7.1% vs FY2025
FY2025 Actual
$13.7M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Army is requesting $17.8M for MLRS Product Improvement Program under RDT&E program element 0603778A, up 21% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

013.7FY25ACTUAL14.6FY26ENACTED17.8FY27REQUEST19.2FY2821.1FY2916.1FY3016.3FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual13.7
FY2026Enacted14.6
FY2027Request17.8
FY2028Outyear19.2
FY2029Outyear21.1
FY2030Outyear16.1
FY2031Outyear16.3
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 7 — Operational System Development.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0603778A

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 21% overall, which can hide much larger swings below.

The whole program

MLRS is funded on 6 lines across 3 appropriations

This page shows $9.5M of MLRS, 0.7% of the program's $1.44B FY2027 request. The rest is appropriated elsewhere.

Also funded hereTypeComponentFY2027 $M
Guided MLRS Rocket (GMLRS)ProcurementArmy1,014.9
MLRS ModsProcurementArmy289.5
Guided MLRS Rocket (GMLRS)ProcurementNavy61.4
Guided MLRSRDT&EArmy54.1
MLRS Reduced Range Practice Rockets (RRPR)ProcurementArmy7.4
MLRS totalArmy, Navy1,436.8

Lines whose title names the program. 25 further lines only mention MLRS in their justification text — those fund something else and are deliberately excluded from the total.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$17.8M
House NDAA (HASC)HASC
$17.8M full · +$0
Senate NDAA (SASC)SASC
$37.8M +$20.0M · +112%
House Approps (HAC-D)HAC_D
$17.8M full · +$0
▲ $20.0M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

BAE
$8.0M · 45%
Next Gen APNT Receiver Development · CPFF
Ft Hood, TX, ATEC, APG, MD, WSMR, RTC
$0.5M · 3.0%
Test Support
Where FY2027 funding flowsShare$M
Industry primes51%9.0
Government labs & warfare centers49%8.7
FY2027 request100%17.8
See BAE's full federal contract ledger members
Program detail

Mission & acquisition strategy

Program element 0603778A supports development and testing of the Army's rocket launcher fleet, including the M270A1 and M270A2 Multiple Launch Rocket System (MLRS) launcher and the M142 High Mobility Artillery Rocket System (M142 HIMARS) launcher. MLRS and M142 HIMARS launchers support the Army's Long Range Precision Fires modernization effort. Updated launchers are required to fire current and future munitions such as the Precision Strike Missile (PrSM) and Extended Range (ER) Guided Multiple Launch Rocket System (GMLRS).

The M142 HIMARS Product Improvement Program performs development efforts required to address emerging requirements. Emerging requirements include, but are not limited to, updates to address emerging threats to the launcher organic fire control system software, reacting to system changes driven by policy and emerging requirements, and maintaining architectural compatibility with other Army ground-based systems reducing sustainability costs. Update software and hardware for communications and munitions to maintain compatibility and operational viability against near-peer adversaries.

Project 093, DX8 — Multi-Launch Rocket System (MLRS)
  • Product Development
  • Test and Evaluation
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0603778A is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what BAE has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Army RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603778A (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "MLRS Product Improvement Program (PE 0603778A)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603778A
Machine access
Markdown twin /programs/0603778A.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$9.5M
▲ 22% vs FY2026
FY2026 Enacted
$7.8M
▼ 19% vs FY2025
FY2025 Actual
$9.6M
Prior year

Multi-Launch Rocket System (MLRS) — one RDT&E project inside PE 0603778A. Congressional marks are recorded on the program element, not on a project.

Project 093 — Multi-Launch Rocket System (MLRS) — requests $9.5M in FY2027, 53% of the $17.8M requested for program element 0603778A. Year over year it grows 22% against FY2026.

Funding trajectory

Project 093 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

09.6FY25ACTUAL7.8FY26ENACTED9.5FY27REQUEST10.2FY2811.1FY298.7FY308.7FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual9.6
FY2026Enacted7.8
FY2027Request9.5
FY2028Outyear10.2
FY2029Outyear11.1
FY2030Outyear8.7
FY2031Outyear8.7
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

MLRS Product Improvement Program▲ 22%
FY2025 actual$9.6M
FY2026 enacted$7.8M
FY2027 request$9.5M

FY2027 planned work Continues tactical launcher software development to incorporate updates from Functional Qualification Test (FQT) and Post System Integration Test (SIT) qualification to support the fire control system (FCS). Continues qualification, development, integration and testing of the improved Assured Positioning, Navigation and Timing (APNT) capabilities and satellite communications, including Increment 2 M-Code and Anti-Jam (AJ) capabilities. Updates software to integrate evolving cybersecurity requirements. Continues the design of the receiver electronics for the Increment 2 M-code circuit developed by Space Force. Conduct test planning and execution.

FY2026 to FY2027 change Increase from FY2026 to FY 2027 funds integration and testing of the Next Generation APNT Increment 2 receiver capability. This capability enables MLRS launchers to operate effectively in contested and/or GPS-denied environments and achieves compliance with National Defense Authorization Act for Fiscal Year 2016 (Public Law 111-383, Section 913) which mandates M-code.

FY2026 plans — current year Completes the integration of the Increment 1 M-Code Receiver. Continues the tactical launcher software development to incorporate updates from Functional Qualification Test (FQT) and Post System Integration Test (SIT) qualification to support the fire control system (FCS), integrates and tests the improved Assured Positioning, Navigation and Timing (APNT) capabilities and satellite communications; including M-Code and Anti-Jam (AJ) capabilities. Updates software to integrate evolving cybersecurity requirements. Develop, integrate, and test rocket launcher solutions, including test planning to support test events. Initiates Increment 2, Next Generation APNT Receiver development which will…

FY2025 accomplishments Continue tactical launcher software development to incorporate updates from Functional Qualification Test (FQT) and Post System Integration Test (SIT) qualification to support the fire control system (FCS). Integrate and test the improved Assured Positioning, Navigation and Timing (APNT) capabilities and integration of satellite communications, to include M-Code and Anti-Jam (AJ) capabilities. Update software to integrate evolving cybersecurity requirements.

Who's building it

Named performers on project 093

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

BAE
$4.0M · 42%
Ft Hood, TX, ATEC, APG, MD, WSMR, RTC
$0.5M · 5.6%
Project detail

What project 093 buys

Project 093. The M270A2 Multiple Launch Rocket System (MLRS) launcher is a full-spectrum, combat-proven, all-weather, 24/7 lethal and responsive, precision strike weapon system. MLRS launchers support the Army's Long Range Precision Fires modernization effort. MLRS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. MLRS is a tracked, indirect fire, rocket/missile launcher capable of firing two pods of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided Multiple Launch Rocket System (GMLRS), the Army Tactical Missile System (ATACMS), and the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). MLRS launchers support Integrated Fires and Multi-Domain Operations. Funds software development, training updates, Assured Positioning, Navigation and Timing (APNT) technology implementation, integration of satellite communications, integration of evolving cybersecurity requirements, and nonrecurring engineering for the MLRS launcher. Funds development related to maintaining capability associated with the current and evolving threat. Funds non-recurring engineering for system hardware and software modernization to the MLRS chassis, launcher loader module, and fire control system. Funding from Project 093 continues software development, Next Gen APNT Receiver development, and testing. Software development supports fire control system evolution to maintain compatibility with current and future munitions. Next Generation APNT Increment 2 Receiver development will replace the obsolete Increment 1 APNT receiver with an Increment 2 (Next Generation APNT) receiver as well as address the evolving threat environment. This receiver incorporates advancements including, but not limited to: Alternative Navigation (ALTNAV), timing holdover, Network Assisted Assured (NA2), Other Signals of Opportunity, Advanced Anti-Jam, or Beamforming. Supports the Army's goal to develop common solutions applicable to both MLRS and M142 HIMARS launchers. Justification: FY2027 Base funding in the amount of $9.464 million for Project 093 continues tactical launcher software development, qualification, and materiel release.

R-3 lines of work
  • Product Development
  • Test and Evaluation
FY2027 Request
$8.3M
▲ 21% vs FY2026
FY2026 Enacted
$6.9M
▲ 69% vs FY2025
FY2025 Actual
$4.1M
Prior year

HIMARS Product Improvement Program — one RDT&E project inside PE 0603778A. Congressional marks are recorded on the program element, not on a project.

Project DX8 — HIMARS Product Improvement Program — requests $8.3M in FY2027, 47% of the $17.8M requested for program element 0603778A. Year over year it grows 21% against FY2026.

Funding trajectory

Project DX8 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

04.1FY25ACTUAL6.9FY26ENACTED8.3FY27REQUEST9.0FY2810.0FY297.5FY307.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual4.1
FY2026Enacted6.9
FY2027Request8.3
FY2028Outyear9.0
FY2029Outyear10.0
FY2030Outyear7.5
FY2031Outyear7.6
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

MLRS Production Improvement Program (PIP)-HIMARS PIP▲ 21%
FY2025 actual$4.1M
FY2026 enacted$6.9M
FY2027 request$8.3M

FY2027 planned work Continues tactical launcher software development to incorporate updates from Functional Qualification Test (FQT) and Post System Integration Test (SIT) qualification to support the fire control system (FCS). Continues qualification, development, integration and testing of the improved Assured Positioning, Navigation and Timing (APNT) capabilities and satellite communications, including Increment 2 M-Code and Anti-Jam (AJ) capabilities. Updates software to integrate evolving cybersecurity requirements. Continues the design of the receiver electronics for the Increment 2 M-code circuit developed by Space Force. Conducts test planning and execution.

FY2026 to FY2027 change Increase from FY2026 to FY 2027 funds integration and testing of the Next Generation APNT Increment 2 receiver capability. This capability enables HIMARS launchers to operate effectively in contested and/or GPS-denied environments and achieves compliance with National Defense Authorization Act for Fiscal Year 2016 (Public Law 111-383, Section 913) which mandates M-code.

FY2026 plans — current year Completes the integration of the Increment 1 M-Code Receiver. Continues the tactical launcher software development to incorporate updates from Functional Qualification Test (FQT) and Post System Integration Test (SIT) qualification to support the fire control system (FCS), integrates and tests the improved Assured Positioning, Navigation and Timing (APNT) capabilities and satellite communications; including M-Code and Anti-Jam (AJ) capabilities. Updates software to integrate evolving cybersecurity requirements. Develop, integrate, and test rocket launcher solutions, including test planning to support test events. Initiates Increment 2, Next Generation APNT Receiver development which will…

FY2025 accomplishments Continue tactical launcher software development, risk reduction, and qualification to support the fire control system (FCS) electronic obsolescence mitigation hardware upgrade required to operate a M142 HIMARS launcher. Integrate and test the improved Assured Positioning, Navigation and Timing (APNT) capabilities and satellite communications, to include M-Code and Anti-Jam (AJ) capabilities for CFCS-equipped M142 HIMARS launchers. Complete Digital Anti-Jam Receiver (DIGAR) testing for UFCS-equipped M142 HIMARS launchers.

Who's building it

Named performers on project DX8

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

BAE
$4.0M · 48%
Ft Hood, TX, ATEC, APG, MD, WSMR, RTC, R
$0.5M · 6.4%
Project detail

What project DX8 buys

Project DX8. The M142 High Mobility Artillery Rocket System (M142 HIMARS) launcher is a full spectrum, combat proven, all weather, 24/7 lethal and responsive, precision strike weapon system. M142 HIMARS launchers support the Army's Long Range Precision Fires modernization effort. M142 HIMARS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. M142 HIMARS is a C-130 or C-17 transportable, wheeled, indirect fire, rocket/missile launcher capable of firing one pod of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided MLRS (GMLRS), the Army Tactical Missile System (ATACMS), and the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). M142 HIMARS launchers support Integrated Fires and Multi-Domain Operations. Funds software development, training updates, Assured Positioning, Navigation and Timing (APNT) technology implementation, integration of satellite communications, integration of evolving cybersecurity requirements, and nonrecurring engineering for the M142 HIMARS launcher. Funds development related to maintaining capability associated with the current and evolving threat. Funding from Project DX8 continues software development, Next Gen APNT Increment 2 Receiver development, and testing. Software development supports fire control system evolution to maintain compatibility with current and future munitions. Next Generation APNT Receiver development will replace the obsolete Increment 1 APNT receiver with an Increment 2 (Next Generation APNT) receiver as well as address the evolving threat environment. This receiver incorporates advancements including, but not limited to: Alternative Navigation (ALTNAV), timing holdover, Network Assisted Assured (NA2), Other Signals of Opportunity, Advanced Anti-Jam, or Beamforming. Supports the Army's goal to develop common solutions applicable to both MLRS and M142 HIMARS launchers. Justification: FY2027 Base funding in the amount of $8.316 million for Project DX8 continues Common Fire Control System (CFCS) software development, qualification, and materiel release. These efforts support the fire control system (FCS) electronic obsolescence mitigation hardware upgrade required to operate an HIMARS launcher.

R-3 lines of work
  • Product Development
  • Test and Evaluation