RDT&E Program Element · President's Budget PB2027

Innovative Naval Prototypes (INP) Adv Tec Dev

PE 0603801N·U.S. Navy·Approp. 1319 — RDT&E·BA3 — Advanced Technology Development
FY2027 Request
$0.0M
Navy · RDT&E
HitchAI read

U.S. Navy requests $0.0M in FY2027.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$138.7M
Prior year

Roll-up of 13 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $0.0M for Innovative Naval Prototypes (INP) Adv Tec Dev under RDT&E program element 0603801N, against nothing enacted in FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550751001250138.7FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual138.7
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 3 — Advanced Technology Development.

Complete
Research
BA 1–2
Current
Advanced Technology
BA 3
Later
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

13 projects roll up into PE 0603801N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. The 8 largest have their own view above; the rest are shown in full here.

Project 3462

DEALRS

$0.0MFY2027 request
FY2025 actual$5.8M
FY2026 enacted$0.0M
FY2027 request$0.0M

Adversary Anti-Access and Area Denial (A2/AD) capabilities continue to improve but remain focused on targeting specific US and joint force capabilities. The Deployment and Employment of Autonomous Long Range Systems (DEALRS) project will develop technologies that sidestep, operate below the threshold, or deplete adversary A2/AD capabilities. DEALRS will specifically develop technologies to enable low-cost unmanned systems that can maneuver across theater-level ranges to penetrate, operate within, and launch strikes from within adversary A2/AD system coverage. This project will develop technologies to increase the range and endurance of autonomous systems while maintaining tactically relevant speeds, loiter times, and signatures with low cost. It will also address technologies that enable the marsupial launch of terminal engagement autonomous unmanned systems across all domains from larger and/or longer-range host systems that bring them to the launch area and the associated technologies needed to ensure roboticized and autonomous startup and launch of the marsupial systems without human intervention. The Activity identified in Project Unit 3462 DEALRS specifically addresses Advanced Technology Development in support of the INP effort.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Deployment & Employment of Autonomous Long Range Systems (DEALRS)
FY2025 actual$5.8M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project 3463

MATes

$0.0MFY2027 request
FY2025 actual$5.0M
FY2026 enacted$0.0M
FY2027 request$0.0M

Traditionally, the utilization of autonomous systems is either operationally segregated from manned operations or requires a significant amount of human oversight when operating in conjunction with manned assets, which mitigates some of the advantage from using them. The goal of the Manned and Autonomous Teams (MATes) project is to develop autonomic robotic technology and collaborative autonomous behaviors that seamlessly operate across all domains in conjunction with manned units, allowing for real-time adaptation and optimization in a manner that streamlines the element of human interaction needed to share mission goals. This technology will monitor human or manned system teammate state, behavior, mission, and adversary threat status to anticipate and act in a tactically appropriate manner that is predictable, communicable, and trusted by the human/manned teammates and which enables autonomous system optimization in coordination with the human/manned teammate and mission objectives. Intuitive human/autonomous system interfaces will be developed to allow focus on higher-order decision-making tasks by the operators allowing for large numbers of autonomous systems (100's or 1000's) to be managed in support of manned operations. The activity identified in Project Unit 3463 MAtes specifically addresses Advanced Technology Development in support of the MATes effort.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Manned and Autonomous Teams (MATes)
FY2025 actual$5.0M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project 3507

Chimera

$0.0MFY2027 request
FY2025 actual$16.3M
FY2026 enacted$0.0M
FY2027 request$0.0M

Details at a higher classification

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Chimera
FY2025 actual$16.3M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project 5899

Precision Fire Control

$0.0MFY2027 request
FY2025 actual$10.0M
FY2026 enacted$0.0M
FY2027 request$0.0M

The Precision Fire Control (PFC) effort will develop a fire control architecture that delivers high precision, high update rate guidance solutions to enable cruise missile defense with small, low-cost interceptors and dramatically increase number of interceptors per ship or Expeditionary Advanced Base. It will develop fire control capability for multiple interceptors (missiles and gun projectiles) that contribute to layered defense of surface combatants, expeditionary forces, and homeland protection. Develop PFC-enabled low-cost missile (LCM) based on existing 2.75" rocket components. The Activity identified in Proj: 5899 Precision Fire Control (PFC) specifically addresses Advanced Technology Development in support of the PFC INP effort.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
Precision Fire Control
FY2025 actual$10.0M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project 9999

Congressional Adds

$0.0MFY2027 request
FY2025 actual$9.4M
FY2026 enacted$0.0M
FY2027 request$0.0M

Congressional add projects not included in other efforts.

The whole program

HELCAP is funded on 2 lines across 1 appropriations

This program element requests nothing for HELCAP in FY2027. The program is still funded — $15.0M of it — but on other lines, which usually means the work is transferring. Also written ASCM.

Also funded hereTypeComponentFY2027 $M
High Energy Laser Counter ASCM Project (HELCAP)RDT&ENavy15.0
HELCAP totalNavy15.0

Lines whose title names the program. 2 further lines only mention HELCAP in their justification text — those fund something else and are deliberately excluded from the total.

Program detail

Mission & acquisition strategy

The Office of Naval Research (ONR) portfolio includes efforts that solve problems and respond to mission requirements, as well as, exploratory research for new ideas and breakthrough capabilities. Larger in scope, scale and risk Innovative Naval Prototypes (INP) are selected for their high-payoff and potential to revolutionize operational concepts. The efforts described in this Program Element (PE) continue the Applied Research work in PE 0602792N for promising INPs with Advanced Technology Development activities. INP investments define the future of U.S. naval forces.

Project 1108, 2731, 3452, 3455, 3456, 3457, 3459, 3461, 3462, 3463, 3507, 5899, 9999 — METEOR
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?Which project inside PE 0603801N is growing fastest, and which is shrinking?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0603801N (President's Budget PB2027).
Suggested citation
HitchAI, "Innovative Naval Prototypes (INP) Adv Tec Dev (PE 0603801N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0603801N
Machine access
Markdown twin /programs/0603801N.md · MCP mcp.hitchintel.combudget_get_program_element
FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$14.6M
Prior year

METEOR — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 1108 — METEOR — requests $0.0M in FY2027.

Funding trajectory

Project 1108 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

014.6FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual14.6
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

METEOR
FY2025 actual$14.6M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 1108 buys

Navy surface combatants have Capability/capacity gaps to defend against high volume attacks in Integrated Air and Missile Defense (IAMD). The objective of METEOR is to demonstrate tactically significant, non-kinetic, High Power Microwave (HPM) payload integration onto Naval platforms to defeat, track, engage and assess operational threats while assessing integrated sensors and weapon control options. The METEOR HPM weapon development will provide capability with low cost-per-shot, deep magazine, tactically significant range, short time engagement for multi-target approach, dual deception and defeat capability. This Innovative Naval Prototype (INP) will assess the military utility of a ship-based Integrated Air and Missile Defense (IAMD) HPM weapon, to develop performance requirements via effects and lethality studies, to evaluate current HPM prototype hardware for those requirements, and to mature promising HPM technologies. To assess military utility as part of layered defense in stressing scenarios, METEOR will quantify effectiveness against priority threats, evaluate Battle Damage Assessment (BDA) techniques, and perform mission modeling.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$0.7M
Prior year

High Energy Laser Counter ASCM Project (HELCAP) — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 2731 — High Energy Laser Counter ASCM Project (HELCAP) — requests $0.0M in FY2027.

Funding trajectory

Project 2731 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

00.7FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual0.7
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

New Accomplishment/Planned Program Entry
FY2025 actual$0.7M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 2731 buys

The High Energy Laser Counter ASCM Project (HELCAP) will expedite the development, experimentation, integration and demonstration of critical technologies to defeat crossing Anti-Ship Cruise Missiles (ASCM) by addressing the remaining technical challenges, e.g.: atmospheric turbulence, automatic target identification and aim point selection, precision target tracking with low jitter in high clutter conditions, advanced beam control, and higher power HEL development. HELCAP will assess, develop, experiment, and demonstrate the various laser weapon system technologies and methods of implementation required to defeat ASCMs in a crossing engagement. HELCAP activities in this project (0603801N) include technology assessments, laser lethality investigations, and advanced beam control. Component and Subsystem level operability is being conducted under this project specifically the Beam Control subsystem including active tracking and advanced atmospheric compensation using Adaptive Optics. The Beam Director subsystem testing will occur in a simulated environment (land based) against surrogate ASCM targets. Other subsystems being developed and tested under this project include the automated engagement sequencing, HEL targets and diagnostics subsystems, and an HEL interface compatible with a range of competing HEL source technologies. This project passes technology to follow on HELCAP activities under Program Element (PE) 0603925N Directed Energy and Electric Weapon Systems.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$6.0M
Prior year

ELEKTRA — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 3452 — ELEKTRA — requests $0.0M in FY2027.

Funding trajectory

Project 3452 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.0FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.0
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

ELEKTRA
FY2025 actual$6.0M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 3452 buys

Complex multi-domain threats can overwhelm the operator and individual platforms ability to defend the force. The ELEKTRA INP effort is developing "Human on the Loop" Artificial Intelligence (AI) enabled algorithms to perform force level kinetic/non-kinetic kill chain optimization and coordination across multiple domains at machine to machine speeds to increase the lethality and survivability of the Force. ELEKTRA will demonstrate AI/ML ability to coordinate kinetic/non kinetic effects autonomously with heterogeneous platforms, the ability to operate in degraded environments for hours and the ability to coordinate and execute domain kill chains simultaneously. It will deploy artificial intelligent (AI) and machine learning (ML) architecture, neural networked computing and large data handling to enable real time, force level effects assignment, coordination and resource management. The Activity identified in Project Unit 3452 specifically addresses Advanced Technology Development in support of the ELEKTRA INP effort.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$6.7M
Prior year

MINERVA — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 3455 — MINERVA — requests $0.0M in FY2027.

Funding trajectory

Project 3455 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

06.7FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual6.7
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

MINERVA
FY2025 actual$6.7M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 3455 buys

The need to operate in a multiple domain environment against highly capable peers requires improved decision quality and reduced decision timelines. MINERVA will develop AI and Machine-Learning (ML) capabilities to improve mission planning, intelligence gathering, execution and assessment. Minerva will deliver next-generation decision aids by combining operations research with emerging AI capabilities to create learning, self-adaptive automation that supports Composite Warfare Commander's (CWC) and their staffs at the Fleet, Force and Group echelons. It will establish a DevOps environment that includes warfighter staffs in the development and integration of new capabilities. The Activity identified in Project Unit 3455 specifically addresses Advanced Technology Development in support of the MINERVA INP effort.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$11.6M
Prior year

Full Spectrum Undersea Warfare — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 3456 — Full Spectrum Undersea Warfare — requests $0.0M in FY2027.

Funding trajectory

Project 3456 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

011.6FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual11.6
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Full Spectrum Undersea Warfare (FSUW)
FY2025 actual$11.6M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 3456 buys

The Full Spectrum Undersea Warfare (FSUW) Project will develop new technology for offensive and defensive warfare conducted on the seabed, in the sea (i.e. subsea), and from the sea. This INP focuses on Theatre Undersea Warfare (TUSW), Joint Targeting and Strike, and Subsea and Seabed Warfare (SSW). There are five thrust areas of the FSUW INP that are key to enabling Chief of Naval Operations Guidance (CNOG), Distributed Maritime Operations (DMO), and the Commandant's Stand in Force with manned and unmanned warfighting capability. These thrust areas were specifically chosen in direct collaboration with STRATCOM, INDO-PACOM, Fleet and Undersea Warfare Commanders and validated with regular Flag engagements. These advanced technology developments will enable future undersea weapon systems (e.g., Maritime Strike Tomahawk and ADCAP variants), COCOM campaign, and operational plans. FSUW thrust areas include 1) Undersea effectors, 2) Integrated expeditionary subsea system of systems, 3) Multi-Vehicle Torpedo Tube Development System (MVTTDS) for payload A, 4) Undersea UAV for Over-The-Horizon (OTH) effects and 5) Undersea Launched Devices to enable Commanding Officers and Regional Combatant Commander effects. The thrust areas are technically an operational interconnected. Selected concepts from advanced research will be integrated into viable representative prototypes for field experimentation in a relevant environment. Lessons learned from field experimentation will inform continued applied research spirals to remedy technical shortcomings, expand capability, or define an alternate approach. The Activity identified in Full Spectrum Undersea Warfare, Project 3458, specifically addresses Advanced Technology Development in support of the Full Spectrum Undersea Warfare INP effort. The Applied Research Budget Activity (BA) 2 funding is in a separate Program Element (PE) 0602792N FSUW INP, Project 3456. Information security concerns preclude fully detailed descriptions of project efforts, research activities, and technology development plans. Specific information on each project and activity will be provided separately to the Congressional oversight committees.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$28.4M
Prior year

Long Range Targeting — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 3457 — Long Range Targeting — requests $0.0M in FY2027.

Funding trajectory

Project 3457 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25028.4FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual28.4
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Long Range Targeting
FY2025 actual$28.4M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 3457 buys

Long Range Targeting emphasizes the specific naval use of HF Over the Horizon Radar (OTHR) on maritime platforms and forward-based positive identification technologies to fill gaps in long-range fires kill chains. Technologies within this activity will enable integrated long range naval fires. Investments include technologies for OTH radar antennas, HF antenna arrays, signal processing, and electronic surveillance. Activity identified in Project Unit 3457 specifically addresses Advanced Technology Development in support of the LRT INP effort.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$19.2M
Prior year

Super Swarm (SS) — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 3459 — Super Swarm (SS) — requests $0.0M in FY2027.

Funding trajectory

Project 3459 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

019.2FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual19.2
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Super Swarm (SS)
FY2025 actual$19.2M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 3459 buys

Swarming is a concept that allows for multi-domain, heterogeneous swarms of unmanned systems capable of rendering the counter's ability to scale either inadequate or irrelevant and includes offensive and defensive operations, own and adversarial employment, and a physical battlespace ranging from open ocean to ashore. The Super Swarm (SS) INP effort will develop an autonomous control system for multiple USV's consisting of cooperative task allocation, cooperative route planning/behaviors and shared situational awareness. The Swarm autonomy technology is leveraged by other programs including the Medium Displacement Unmanned Surface Vehicle (MDUSV) and the Autonomous USV FNC program. It will consist of the employment of sustainable large-scale robotic swarm warfare across all domains ahead of our adversaries to obviate costly and vulnerable legacy platforms and to gain a competitive advantage. The Activity identified in Project Unit 3459 specifically addresses Advanced Technology Development in support of the Super Swarm INP effort.

FY2027 Request
$0.0M
No FY2026 funding
FY2026 Enacted
$0.0M
▼ 100% vs FY2025
FY2025 Actual
$5.0M
Prior year

MASS — one RDT&E project inside PE 0603801N. Congressional marks are recorded on the program element, not on a project.

Project 3461 — MASS — requests $0.0M in FY2027.

Funding trajectory

Project 3461 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

05.0FY25ACTUAL0.0FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual5.0
FY2026Enacted0.0
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.

Manufacture of Autonomous Systems at Scale (MASS)
FY2025 actual$5.0M
FY2026 enacted$0.0M
FY2027 request$0.0M
Project detail

What project 3461 buys

The rising use of air, surface, and sub-surface unmanned and autonomous systems requires a paradigm shift in the development, production, and life-cycle management of these systems in order to gain a competitive advantage against adversarial capabilities as well as allow for fielding of significant numbers (1000's to 10,000's) in an increasingly budget-constrained acquisition environment. The growth in rapid prototyping and additive manufacturing technologies presents an opportunity to capitalize on these advances though technical development and demonstration efforts focused on scale-up both in terms of rapid production of relevant quantities as well as greatly increasing the physical size of platforms produced far beyond what is currently achievable. Manufacturing of Autonomous Systems at Scale (MASS) efforts will utilize wide range of advanced manufacturing methods combined with adaptive digital design processes with "Design for Low-Cost Platform Attriteability" as a major attribute to avoid the platform cost growths normally associated with exquisite systems development. This also represents the ability to rapidly modify platform attributes based on evolving operational needs and quickly insert into build process without costly retooling. Secondary goals focus on increasing commonality of critical components across platforms and design of these in modular fashion in order to manage supply chain vulnerability. Lastly, the project will look at ability to place manufacturing capability as far forward/afloat as possible to reduce the logistics tail and speed delivery of capability at-scale into the fleet. The activity identified in Project Unit 3461 MASS specifically addresses Advanced Technology Development in support of the MASS effort.