R-2A Activity · President's Budget PB2027

Reentry Vehicle Applications Program

FY2027 Request
$22.2M
▼ 69% vs FY2026
HitchAI read

This activity requests $22.2M in FY2027, 100% of project 641022, down 69% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$22.2M
▼ 69% vs FY2026
FY2026 Enacted
$72.0M
▲ 0.1% vs FY2025
FY2025 Actual
$71.9M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 641022 of PE 0603851F. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

•Finalize Experimental Flight Test (EFT2), utilizing Intercontinental Ballistic Missile (ICBM) launches as a platform to evaluate experimental payloads. This flight test aims to facilitate the maturation of key technologies by subjecting them to realistic flight conditions and gathering performance data in a representative environment. The data collected during the flight will be instrumental in refining future payload designs, validating performance models, and ultimately advancing the technological readiness level of these experimental systems. •Continue joint DoW/DoE test flight assembly (CORVUS) and development of telemetric equipment collecting/transmitting various component performance test data throughout launch, flight, and reentry

FY2026 to FY2027 change

Decrease of funding due to funding tech adjustments for higher priorities in Command and Control Applications Program (C2AP)

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

•Continue research and engineering utilizing critical physics-space modeling and simulation to enable red and blue teams to determine outcomes of scenarios. (Future Operating Concept) •Begin Terminal Tracking and Scoring. The advanced tracking and scoring system revolutionizes flight testing by precisely monitoring the final descent trajectory of reentry vehicles using cutting-edge laser technology. Designed specifically for terminal phase tracking, this system significantly enhances the capabilities of older, legacy laser tracking systems. It achieves this through the incorporation of several key advancements, including the acquisition and utilization of extremely precise Time-Space-Position Information (TSPI). •Finalize IRIS study to evaluate AI and characterization. •Continue to gain a better understanding of how APL's novel manufacturing, high temperature materials, and testing capabilities can assist the knowledge base and future applications of Thermal Protection Systems. •Continue adversarial AI capability analysis. (CM Highrider) •Continue Experimental Flight Test (EFT2), utilizing Intercontinental Ballistic Missile (ICBM) launches as a platform to evaluate experimental payloads. This flight test aims to facilitate the maturation of key technologies by subjecting them to realistic flight conditions and gathering performance data in a representative environment. The data collected during the flight will be instrumental in refining future payload designs, validating performance models, and ultimately advancing the technological readiness level of these experimental systems. •Continue future system demonstrator effort with the specific aim of creating advanced telemetric equipment designed to perform two critical functions: first, to collect comprehensive data from various components within the system being tested; and second, to transmit this collected data in real-time to receiving stations for analysis and evaluation. The data gathered will be crucial for validating design assumptions, refining system models, and ultimately ensuring the reliability and effectiveness of the system. •Continue research & development, and prototyping of advanced re-entry systems technologies in accordance with Inertial Navigation Technology Maturation, Sensor Fusion for Reentry Systems Technology Maturation, Advanced Fuzing Technology Maturation, Advanced Aeroshell Material Technology Maturation and Reentry Systems Test, Evaluation and Experimentation for potential insertion into the Path Length Module. •Continue to Bolster our ability to mature and deploy new ICBM technologies through demonstration and validation •Respond to evolving warfighter priorities and emerging requirements in support of developing ICBM weapon system capability.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550071.9FY25ACTUAL72.0FY26ENACTED22.2FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual71.9
FY2026Enacted72.0
FY2027Request22.2

This activity is 100% of project 641022's FY2027 request and 31% of PE 0603851F's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

1 activity in project 641022

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Reentry Vehicle Applications Program — this activity$22.2M ▼ 69%
Source
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibit R-2A · PE 0603851F, project 641022 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.