Roll-up of 3 projects. Projects are the summable leaves — the PE total is their sum, never added to it.
For fiscal year 2027, Defense-Wide agencies are requesting $0.0M for Ballistic Missile Defense Terminal Defense Segment under RDT&E program element 0603881C, down 100% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 287.4 |
| FY2026 | Enacted | 465.3 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.
3 projects roll up into PE 0603881C
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -100% overall, which can hide much larger swings below.
Cyber Operations
Program-Wide Support
THAAD is funded on 5 lines across 4 appropriations
This program element requests nothing for THAAD in FY2027. The program is still funded — $1.83B of it — but on other lines, which usually means the work is transferring.
| Also funded here | Type | Component | FY2027 $M |
|---|---|---|---|
| THAAD Development and Modernization | RDT&E | Army | 921.9 |
| TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) | Procurement | Army | 907.2 |
| THAAD Test | RDT&E | Defense-Wide | 0.0 |
| THAAD | Procurement | Defense-Wide | — |
| THAAD total | Army, Defense-Wide | 1,829.0 |
Lines whose title names the program. 15 further lines only mention THAAD in their justification text — those fund something else and are deliberately excluded from the total.
Mission & acquisition strategy
The THAAD system provides a capability to intercept and destroy short-range, medium-range, and limited intermediate-range missile threats inside or outside the atmosphere during the terminal phase of flight. THAAD continues the development and integration of multiple, independent system builds to address the evolving threat, improve reliability, availability and readiness, defense planning, and improved capability to engage Short-Range Ballistic Missile, Medium-Range Ballistic Missile, and limited Intermediate-Range Ballistic Missile threats.
The acquisition strategy for MDA Consolidated Support consists of contract actions to industry for: a) Engineering and technical support; b) studies, analyses, and evaluations; and c) management and professional services to MDA functional organizations and program offices. With a focus to achieve Small Business goals, MDA is leveraging existing contracts and will competitively award new contracts to meet MDA's FYs 2027-2031 Advisory and Assistance Services support.
- Product Development
- Support
- Management Services
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
THAAD — one RDT&E project inside PE 0603881C. Congressional marks are recorded on the program element, not on a project.
Project MD07 — THAAD — requests $0.0M in FY2027. Year over year it falls 100% against FY2026.
Project MD07 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 269.5 |
| FY2026 | Enacted | 438.1 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
4 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- No funding requested in FY 2027 to align with the Secretary of War's Military Defense Strategy for transitioning the efforts to the Army.
- No funding requested in FY 2027 to align with the Secretary of War's Military Defense Strategy for transitioning the efforts to the Army.
- No funding requested in FY 2027 to align with the Secretary of War's Military Defense Strategy for transitioning the efforts to the Army.
- No funding requested in FY 2027 to align with the Secretary of War's Military Defense Strategy for transitioning the efforts to the Army.
What project MD07 buys
The THAAD system provides a capability to intercept and destroy short-range, medium-range, and limited intermediate-range missile threats inside or outside the atmosphere during the terminal phase of flight. THAAD continues the development and integration of multiple, independent system builds to address the evolving threat, improve reliability, availability and readiness, defense planning, and improved capability to engage Short-Range Ballistic Missile, Medium-Range Ballistic Missile, and limited Intermediate-Range Ballistic Missile threats. THAAD Development executes the iterative development and integration of multiple, independent system builds to deliver enhanced system capabilities and expand the defense of allies and deployed forces from short to limited intermediate-range threats and the integration of the THAAD weapon system into the Army IBCS architecture. Program Operations provides strategic planning, program integration, cost estimating, contracting, financial management, internal reviews and audits, earned-value management, and program assessments for the THAAD Program Office. Project Redwood details are provided at a Higher Classification reported in accordance with Title 10, United States Code, Section 119 (a)(1) in the Special Access Program Annual Report to Congress. THAAD Program Support provides communications and interoperability efforts to support the Materiel Release process, maintaining safety and mission assurance and enabling the ability to operate on multiple networks. Beginning in FY 2027, the responsibility for THAAD Research, Development, Test and Evaluation funding will transfer to the Army to support ongoing development of the THAAD weapon system. This transfer consolidates THAAD resources under Army management, reflecting a realignment of responsibilities and ensuring future requirements are planned and resourced directly within the Army.
- Product Development
- Support
- Management Services
Cyber Operations — one RDT&E project inside PE 0603881C. Congressional marks are recorded on the program element, not on a project.
Project MC07 — Cyber Operations — requests $0.0M in FY2027. Year over year it falls 100% against FY2026.
Project MC07 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 3.5 |
| FY2026 | Enacted | 3.2 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - No funding requested in FY 2027 to align with the Secretary of War's Military Defense Strategy for transitioning the efforts to the Army.
FY2026 to FY2027 change Decrease from FY 2026 to FY 2027 aligns with the Secretary of War's Military Defense Strategy for transitioning the efforts to the Army.
What project MC07 buys
Cyber Operations sustain the Missile Defense Agency (MDA) Risk Management Framework (RMF) and Controls Validation Testing (CVT) activities; analysis of validation results, risk assessments; reviews of proposed Program Manager/Information Assurance Manager Plans of Action and Milestones for MDA Terminal High Altitude Area Defense (THAAD) mission systems; and supports THAAD authorizations to operate in the Missile Defense System. Beginning in FY 2027, the responsibility for THAAD Research, Development, Test and Evaluation funding will transfer to the Army. This transfer consolidates THAAD resources under Army management, reflecting a realignment of responsibilities and ensuring future requirements are planned and resourced directly within the Army.
- Product Development
- Support
Program-Wide Support — one RDT&E project inside PE 0603881C. Congressional marks are recorded on the program element, not on a project.
Project MD40 — Program-Wide Support — requests $0.0M in FY2027. Year over year it falls 100% against FY2026.
Project MD40 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 14.5 |
| FY2026 | Enacted | 24.0 |
| FY2027 | Request | 0.0 |
| FY2028 | Outyear | 0.0 |
| FY2029 | Outyear | 0.0 |
| FY2030 | Outyear | 0.0 |
| FY2031 | Outyear | 0.0 |
1 accomplishment / planned program
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.
- No funding requested in FY 2027 to align with the Secretary of War's Military Defense Strategy for transitioning the efforts to the Army.
What project MD40 buys
PWS contains non-headquarters management costs in support of Missile Defense Agency (MDA) functions and activities across the entire Missile Defense System. These functions include Government Civilians and Contract Support Services. This effort provides integrity and oversight of the Missile Defense System as well as supports MDA in the development and evaluation of technologies that will respond to the changing threat. Additionally, PWS includes personnel to support global deployments performing deployment site preparation and activation, and provides facility capabilities for MDA Executing Agent locations worldwide. Other MDA wide costs include: physical and technical security; civilian drug testing; audit readiness; the Science, Technology, Engineering, and Mathematics (STEM) program; legal services and settlements; travel and agency training; office, equipment, vehicle, and warehouse leases; utilities and base operations across multiple geographic locations; commercial and ancillary facility services; management of all facility aspects regardless of lifecycle stage; supplies and maintenance; compliance with statutory environmental requirements; data and unified communications support; materiel and readiness and central property management of equipment; Facilities Sustainment, Restoration and Modernization (FSRM) program (formerly Real Property Maintenance) to keep the Department's inventory of facilities in good working order; and similar operating expenses. PWS is allocated on a pro-rata basis across most Agency PEs and, therefore, fluctuates per PE by FY based on the total Agency budget in that FY.
- Support
- Management Services