RDT&E Project · President's Budget PB2027

Aegis BMD Development Support

Project MX09·PE 0603892C — AEGIS BMD·Defense-Wide·BA4
FY2027 Request
$175.3M
▲ 39% vs FY2026
HitchAI read

Project MX09 — Aegis BMD Development Support requests $175.3M in FY2027, 19% of the $927.9M requested for program element 0603892C, up 39% on FY2026. 4 R-2A activities decompose the request. Lockheed Martin is the largest named R-3 performer at $21.7M, 12% of the project's FY2027 R-3 total.

FY2027 Request
$175.3M
▲ 39% vs FY2026
FY2026 Enacted
$125.8M
▼ 35% vs FY2025
FY2025 Actual
$194.0M
Prior year
Project detail

What project MX09 buys

Provides Government, contractor, and Federally Funded Research and Development Center (FFRDC) workforce that manage the overall Aegis Based Defense program and enables the program to develop, build, and test standard missiles and associated Aegis Weapons Systems. Aegis Based Defense, in accordance with negotiated agreements between the United States (U.S.) Navy and the Missile Defense Agency (MDA) has identified and segregated funding for Developmental Support of Aegis Based Defense specific elements resident aboard Aegis capable U.S. Navy ships. Computer Program Support consists of, but is not limited to, reviews of Technical Observation Reports (TORs) that are generated by ship crews during exercises or deployments, determination of root causes and preparation of Computer Program Change Request (CPCR) to correct TORs, updates to the in-service computer program to apply, test and certify multiple CPCRs, and tests installation of Aegis Weapon System (Army/Navy Surface Radar Surveillance and Control Radar/Fire Control System) alignment updates as required. Aegis Based Defense provides support to Annual Integration Events to ensure any updated Aegis Combat System computer programs do not degrade Ballistic Missile Defense (BMD) equipped ships and provides distance and technical support for BMD equipped ships. Provides Fleet operations and mission support to enable the conduct of sustained BMD operation.

R-3 lines of work
  • Support
Funding trajectory

Project MX09 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

501001502000194.0FY25ACTUAL125.8FY26ENACTED175.3FY27REQUEST213.6FY28225.0FY29241.6FY30242.5FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual194.0
FY2026Enacted125.8
FY2027Request175.3
FY2028Outyear213.6
FY2029Outyear225.0
FY2030Outyear241.6
FY2031Outyear242.5
Inside the project

4 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. 1 of them describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

Program Operations▲ 3%
FY2025 actual$93.6M
FY2026 enacted$72.5M
FY2027 request$74.6M

The exhibit describes this work once, for project MX09 as a whole, rather than per activity. Read the project justification →

FY2025 actual$60.7M
FY2026 enacted$10.8M
FY2027 request$55.4M

- Develop and deliver updated threat models in support of the threat adaptation integration with in-service baselines. - Conduct studies and concepts supporting development based on real-world lessons learned. - Execute backfit capability deliveries to in-service Aegis baselines to enhance operational performance and extend system…

Read the FY2027 plan →
Fleet Integration▲ 28%
FY2025 actual$25.5M
FY2026 enacted$20.8M
FY2027 request$26.7M

FY2026 to FY2027 change Increase from FY 2026 to FY 2027 provides additional Cerberus IAMD Planner updates.

Infrastructure Upgrades▼ 14%
FY2025 actual$14.2M
FY2026 enacted$21.7M
FY2027 request$18.6M

FY2026 to FY2027 change Decrease from FY 2026 to FY 2027 reflects reduced hardware upgrades for the BTS Lab to support baseline development and testing.

FY2026 plans — current year - Update Ballistic Missile Defense Test Bed San Diego (BTS) with Mod 0 and Mod X hardware to align with Baseline 10 hardware configuration to support development testing and Ground/Flight Test requirements.

Who's building it

Named performers on project MX09

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

Lockheed Martin
$21.7M · 12%
JACOBS
$17.3M · 9.9%
SCSC
$6.0M · 3.4%
STRATEGIC ALLIANCE BUSINESS GROUP
$2.1M · 1.2%