RDT&E Project · President's Budget PB2027

C2BMC Test

FY2027 Request
$63.9M
▲ 6.9% vs FY2026
HitchAI read

Project MT01 — C2BMC Test requests $63.9M in FY2027, 6.8% of the $940.0M requested for program element 0603896C, up 6.9% on FY2026. 1 R-2A activity decomposes the request. JACOBS is the largest named R-3 performer at $31.1M, 49% of the project's FY2027 R-3 total.

MarketCustom Software / Programming

Matched on this project's title. A title match, not a curated taxonomy — narrative-only matches are not shown at all rather than shown with a caveat nobody reads. No market size is quoted here: a market spans appropriations far beyond this program element.

FY2027 Request
$63.9M
▲ 6.9% vs FY2026
FY2026 Enacted
$59.7M
▲ 5.1% vs FY2025
FY2025 Actual
$56.9M
Prior year
Project detail

What project MT01 buys

Command and Control, Battle Management and Communications (C2BMC) Test supports system flight and ground testing, wargames, and exercises as detailed in the Missile Defense Agency (MDA) Integrated Master Test Plan (IMTP) to ensure C2BMC capabilities delivered are consistent with the Prioritized Capabilities List and are interoperable with other Missile Defense System components. MDA gains efficiencies and minimizes laboratory resource requirements (footprint, personnel, and hardware) by utilizing the C2BMC Test Facility and the Persistent Infrared Testbed (PIT), formerly Overhead Persistent InfraRed Capabilities Lab (OCL), test infrastructure as the laboratory environment supporting System Test, Development, and Sustainment. For System Ground and Flight Test, the labs are used for pre-test analysis, test execution, and post-test analysis. For Development, the labs are utilized for software verification and validation testing and system integration testing. For Sustainment, the labs are used to assist with root cause determination for issues discovered on the fielded system and validation of any required software patches.

R-3 lines of work
  • Test and Evaluation
Funding trajectory

Project MT01 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

2550056.9FY25ACTUAL59.7FY26ENACTED63.9FY27REQUEST63.3FY2864.6FY2964.8FY3064.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual56.9
FY2026Enacted59.7
FY2027Request63.9
FY2028Outyear63.3
FY2029Outyear64.6
FY2030Outyear64.8
FY2031Outyear64.8
Inside the project

1 accomplishment / planned program

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describes FY2027 work in enough detail to have its own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$56.9M
FY2026 enacted$59.7M
FY2027 request$63.9M

-Participate in ground test events to support fielding of C2BMC and BOA Ballistic Missile Defense System Track (BST) with System Level Integrated Discrimination (SLD) by testing the following capabilities: Generation BST with SLD to support GMD Engagements, BOA Integration, SDA refinement, Reporting of Space Object Catalog entities to…

Open this activity →
Who's building it

Named performers on project MT01

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

JACOBS
$31.1M · 49%
Northrop Grumman
$16.0M · 25%
Lockheed Martin
$15.7M · 25%