R-2A Activity · President's Budget PB2027

Integrated Master Test Plan

Activity a0·Project MT01 — C2BMC Test·PE 0603896C·Defense-Wide
FY2027 Request
$63.9M
▲ 6.9% vs FY2026
HitchAI read

This activity requests $63.9M in FY2027, 100% of project MT01, up 6.9% on FY2026. The R-2A exhibit describes it across FY2026.

FY2027 Request
$63.9M
▲ 6.9% vs FY2026
FY2026 Enacted
$59.7M
▲ 5.1% vs FY2025
FY2025 Actual
$56.9M
Prior year
Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

-Participate in ground test events to support fielding of C2BMC and BOA Ballistic Missile Defense System Track (BST) with System Level Integrated Discrimination (SLD) by testing the following capabilities: Generation BST with SLD to support GMD Engagements, BOA Integration, SDA refinement, Reporting of Space Object Catalog entities to AN/TPY-2 FBM Radars and LRDR for use in radar calibration, and Expanded Hypersonic Tracking and Link 16 Reporting. -Continue to assess interoperability of C2BMC, BOA, AN/TPY-2 FBM, LRDR, GS, XBR, Orbital Boost Vehicle, Integrated Air and Missile Defense Battle Command System, PDB, Space Based Infrared System Software Baseline Releases, and THAAD; assess C2BMC planning, monitoring, and tasking capabilities effect on Homeland Defense performance.

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

2550056.9FY25ACTUAL59.7FY26ENACTED63.9FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual56.9
FY2026Enacted59.7
FY2027Request63.9

This activity is 100% of project MT01's FY2027 request and 6.8% of PE 0603896C's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

1 activity in project MT01

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Integrated Master Test Plan — this activity$63.9M ▲ 7%