RDT&E Program Element · President's Budget PB2027

E-7A

PE 0604007F·U.S. Air Force·Approp. 3600 — RDT&E·BA4 — Advanced Component Development & Prototypes
FY2027 Request
$0.0M
⚑ Contested — Senate adds $1,500.0M
HitchAI read

U.S. Air Force funding falls 100% to a $0.0M request in FY2027 (down from a FY2026 peak). In the FY2027 defense authorization, the Senate added $1,500.0M (to $1.50B) while House appropriators added $1,549.1M (to $1.55B).

FY2027 Request
$0.0M
▼ 100% vs FY2026
Senate mark
$1,500.0M
▼ $1,500.0M vs request
FY2026 Enacted
$1,097.3M
In law

For fiscal year 2027, the U.S. Air Force is requesting $0.0M for E-7A under RDT&E program element 0604007F, down 100% from FY2026. In the FY2027 defense authorization, Senate moved to raise it to $1.50B.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2505007501,0000586.7FY25ACTUAL1,097.3FY26ENACTED0.0FY27REQUEST0.0FY280.0FY290.0FY300.0FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual586.7
FY2026Enacted1,097.3
FY2027Request0.0
FY2028Outyear0.0
FY2029Outyear0.0
FY2030Outyear0.0
FY2031Outyear0.0
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 4 — Advanced Component Development & Prototypes.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Current
Prototyping
BA 4
Later
Development & Fielding
BA 5–7
Inside the program element

1 project rolls up into PE 0604007F

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -100% overall, which can hide much larger swings below.

Project 644413

E-7A

$0.0MFY2027 request ▼ 100%
FY2025 actual$586.7M
FY2026 enacted$1,097.3M
FY2027 request$0.0M
Product DevelopmentSupportTest and EvaluationManagement Services

Funds the E-7A program. The E-7A program is intended to replace the unsustainable E-3 Airborne Warning and Control System (AWACS). The E-3 AWACS, first fielded in the 1970s, is at the end of its service life, and costly to maintain. The E-7A will serve as the USAF's principal airborne platform for airborne command and control and airborne moving target indicator, providing a reliable, persistent critical node in the long-range kill chain for the Joint Force Air Component Commander (JFACC). The E-7A is intended to provide increased capabilities to the USAF and the Joint Services to include the ability to detect and track highly maneuverable, small radar cross-section airborne targets (modern and emerging threats), the ability to real-time process and create a precise air picture, and the ability to battle manage (e.g. command and control) under a wide range of operational conditions. The E-7A is a highly modified Airborne Battle Management and Command and Control aircraft integrating a Boeing 737-700 Next Generation (737NG) airframe with a reinforced fuselage Section 46, a Northrop Grumman Multi-Role Electronically Scanned Array (MESA) Radar mounted on the aircraft's Section 46, and two 180-kVA generators added to commercial CFM-56 engines mounted beneath each wing. The E-7A will provide a reliable, operationally available, maintainable, and sustainable capability. E-7A RDT&E efforts include: end item completion and component modification for aircraft to support test and evaluation; hardware and software modernization development efforts to ensure compliance with US cybersecurity and program protection standards; development efforts to ensure navigation and communication systems comply with GPS M-Code and Narrowband SATCOM mandates; development efforts to design and build flight planning terminals, deployable mission support systems, and mission crew trainers; design and build-out contractor and government System Integration Laboratories supporting development, integration, and test activities; and analysis and to support future requirements and airworthiness certification. E-7A Command and Control, Intelligence, Surveillance, and Reconnaissance (C2ISR): C2ISR system improvements investigate and develop future capabilities of the E-7 weapon system.

Accomplishments / planned programs (R-2A) — prior, current and budget year only
E-7A▼ 100%
FY2025 actual$586.7M
FY2026 enacted$1,097.2M
FY2027 request$0.0M

FY2026 to FY2027 change The FY 2027 President's Budget does not include funding for the E-7 Wedgetail.

FY2026 plans — current year Continuing Rapid Prototyping including the following tasks: - continue prototyping end items and modification components to support test and evaluation - hardware and software modernization development efforts to ensure compliance with US cybersecurity and program protection standards - development efforts to ensure navigation and communication systems comply with GPS M-Code and Narrowband SATCOM mandates - design and build flight planning terminals, deployable mission support systems, and mission crew and maintenance trainers - design and build-out contractor and government System Integration Laboratories supporting development, integration, and test activities - provide analysis and…

E-7 C2ISR▼ 100%
FY2025 actual
FY2026 enacted$0.1M
FY2027 request$0.0M

FY2026 to FY2027 change The FY 2027 President's Budget does not include funding for the E-7 Wedgetail.

FY2026 plans — current year Conduct studies and analysis such as: - Study Block 1 E-7 improvements and ability to build on and or retrofit onto E-7A Block 0 configuration. - Study known and future diminishing manufacturing sources (DMS), develop solutions, and integrate on E-7A.

Congressional action

The request is contested

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$0.0M
Senate NDAA (SASC)SASC
$1,500.0M +$1,500.0M
House Approps (HAC-D)HAC_D
$1,549.1M +$1,549.1M
▲ $49.1M chamber gap — unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Program detail

Mission & acquisition strategy

Funds the E-7A program. The E-7A program is intended to replace the unsustainable E-3 Airborne Warning and Control System (AWACS). The E-3 AWACS, first fielded in the 1970s, is at the end of its service life, and costly to maintain. The E-7A will serve as the USAF's principal airborne platform for airborne command and control and airborne moving target indicator, providing a reliable, persistent critical node in the long-range kill chain for the Joint Force Air Component Commander (JFACC).

The Service Acquisition Executive (SAE) designated the E-7A program a Middle Tier of Acquisition (MTA) Rapid Prototyping effort in February 2023. A sole source undefinitized contract action (UCA) was awarded to Boeing in February 2023 and Definitized in August 2024. The Milestone Decision Authority for the E-7A program is the Assistant Secretary of the Air Force for Acquisition, Technology, and Logistics. Program management for the E-7A program is under direction of PEO Intelligence, Surveillance, Reconnaissance (ISR) and Special Operations Forces (SOF) located at Wright-Patterson AFB, OH. The Air Force Life Cycle Management Center located at Wright-Patterson AFB, OH is the contracting authority for the E-7A program.

Project 644413 — E-7A
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did Senate do to this request, and what is still unresolved?In plain terms, what is this program element for and how is it being acquired?

This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Air Force RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604007F (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "E-7A (PE 0604007F)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604007F
Machine access
Markdown twin /programs/0604007F.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks