For fiscal year 2027, the U.S. Navy is requesting $16.5M for Threat Simulator Development under RDT&E program element 0604256N, down 35% from FY2026.
Funding profile, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 25.4 |
| FY2026 | Enacted | 25.1 |
| FY2027 | Request | 16.5 |
| FY2028 | Outyear | 48.0 |
| FY2029 | Outyear | 43.9 |
| FY2030 | Outyear | 46.7 |
| FY2031 | Outyear | 49.6 |
Acquisition lifecycle
This program is funded in RDT&E Budget Activity 6 — RDT&E Management Support.
2 projects roll up into PE 0604256N
Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves -35% overall, which can hide much larger swings below.
Effect Nav E/W (ENEWS)
Congressional marks
Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.
Mission & acquisition strategy
This is a continuing program that consolidates the design, fabrication and integration of Naval Electronic Warfare (EW) threat simulators for increased managerial emphasis and coordination. These simulator development efforts provide realistic Developmental and Operational Test and Evaluation environments to test EW systems and defensive tactics. These projects develop threat Anti-Air and Anti-Ship weapon system simulators in accordance with the Services' requirements.
Ask this program element
Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.
This page carries the budget justification and the NDAA marks — nothing else. For what a contractor has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.
Cite this page
/programs/0604256N.md · MCP mcp.hitchintel.com → budget_get_program_element, budget_get_cong_marksElectronics W/F Env Simulation (ECHO) — one RDT&E project inside PE 0604256N. Congressional marks are recorded on the program element, not on a project.
Project 0602 — Electronics W/F Env Simulation (ECHO) — requests $9.3M in FY2027, 57% of the $16.5M requested for program element 0604256N. Year over year it falls 45% against FY2026.
Project 0602 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 18.9 |
| FY2026 | Enacted | 17.0 |
| FY2027 | Request | 9.3 |
| FY2028 | Outyear | 40.6 |
| FY2029 | Outyear | 36.4 |
| FY2030 | Outyear | 39.1 |
| FY2031 | Outyear | 41.8 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Continue to provide program management, systems engineering, and requirements identification for the development of simulators and foreign material acquisition. - Continue to validate simulators and stimulators at the Navy tri-lab centers.
FY2026 to FY2027 change Funding decreased from FY 2026 to FY 2027 due to completing validation efforts.
FY2026 plans — current year - Continue to provide program management, systems engineering, and requirements identification for the development of simulators and foreign material acquisition. - Continue to validate simulators and stimulators at the Navy tri-lab centers.
FY2027 planned work - Continue radar signal emulator upgrade and integration. - Initiate development of closed-loop simulator.
FY2026 to FY2027 change Funding increased from FY 2026 to FY 2027 due to the initiation of a closed-loop simulator.
FY2026 plans — current year - Complete development of small scale open-loop simulator for NAWCAD Pax and NAWCWD Pt. Mugu. - Initiate radar signal emulator upgrade and integration.
FY2027 planned work - Continue the upgrade and integration of missile simulation models. - Continue the minor upgrades to open air and laboratory threat systems. - Continue design and development of a reconfigurable closed-loop threat simulator for integration and utilization at laboratories and the open-air ranges. - Continue development of a closed-loop short range surface to air missile radar simulator at Naval Air Warfare Center Weapons Division Pt. Mugu and Naval Air Warfare Center Aircraft Division Pax River. - Continue design and development of naval simulator at Naval Air Warfare Center Aircraft Division Pax River and Naval Air Warfare Center Weapons Division Pt. Mugu.
FY2026 to FY2027 change Funding decreased from FY 2026 to FY 2027 to incorporate miscellaneous funding reductions to support higher departmental priorities.
FY2026 plans — current year - Complete replacement of an obsolete closed-loop surface to air missile simulator at Naval Air Warfare Center Weapons Division Pt. Mugu and China Lake and Naval Air Warfare Center Aircraft Division Pax River with a Great Power Competitor threat simulator. The new simulator will include the latest assessed capabilities and current technology. - Complete development of a surface to air missile radar emulation in a radar signal emulator at Naval Air Warfare Center Weapons Division China Lake. - Continue the upgrade and integration of missile simulation models. - Continue the minor upgrades to open air and laboratory threat systems. - Continue design and development of a reconfigurable…
What project 0602 buys
The objective of this project is development of necessary simulation facilities and approaches to allow determination of the effectiveness of Electronic Warfare (EW) in real world engagement situations and to support the introduction of modern, effective EW systems into Naval Aviation platforms. The heavy use of test resources by all Services demonstrates the importance of these assets. The Electronic Warfare Environment Simulation project is unique because it is the only program within the Department of War which develops and provides Naval anti-air warfare threat assets for Test and Evaluation (T&E). This project directly supports the T&E resource requirements for all Naval Air EW development programs, to include radio frequency situational awareness and countermeasures. Programs in development and future programs include: Joint Strike Fighter, EA-18G, Low Band Transmitter, Next Generation Jammer, Advanced Anti-Radiation Guided Missile (AARGM), Long Range Anti-Ship Missile (LRASM). This project provides for the development of an Integrated Air Defense T&E capability to be fielded at each of the three sites comprising the Navy's Tri-Center complex: Naval Air Warfare Center Weapons Division, China Lake and Point Mugu in CA, and Naval Air Warfare Center Aircraft Division, Patuxent River, MD.
Effect Nav E/W (ENEWS) — one RDT&E project inside PE 0604256N. Congressional marks are recorded on the program element, not on a project.
Project 0672 — Effect Nav E/W (ENEWS) — requests $7.1M in FY2027, 43% of the $16.5M requested for program element 0604256N. Year over year it falls 12% against FY2026.
Project 0672 funding, FY2025–FY2031
Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.
| Fiscal Year | Estimate Type | Amount ($M) |
|---|---|---|
| FY2025 | Actual | 6.5 |
| FY2026 | Enacted | 8.1 |
| FY2027 | Request | 7.1 |
| FY2028 | Outyear | 7.4 |
| FY2029 | Outyear | 7.5 |
| FY2030 | Outyear | 7.6 |
| FY2031 | Outyear | 7.8 |
3 accomplishments / planned programs
The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them.
FY2027 planned work - Continue to maintain custom instrumentation equipment such as digital data acquisition and ground truth systems. - Continue to maintain and upgrade 21 RF and EO/IR hardware simulators, 6 programmable simulators, and associated simulator control panels to support system effectiveness evaluations for EW Program of Record (PORs) such as SEWIP (V)6, (V)7, SOEA, and LEED. Maintenance and upgrades include integration of higher performance components for increased reliability and improved mission performance. Installation of specialized wiring and cables in test aircraft and maintaining flight certifications for captive-carry electronic pods. - Complete introduction and flight certification for…
FY2026 to FY2027 change There is no significant funding change from FY 2026 to FY 2027.
FY2026 plans — current year - Continue to maintain custom instrumentation equipment such as digital data acquisition and ground truth systems. - Continue to maintain and upgrade 20 RF and EO/IR hardware simulators, 6 programmable simulators, and associated simulator control panels to support system effectiveness evaluations for EW Program of Record (PORs) such as SEWIP (V)6, (V)7, SOEA, and LEED. Maintenance and upgrades include integration of higher performance components for increased reliability and improved mission performance. Installation of specialized wiring and cables in test aircraft and maintaining flight certifications for captive-carry electronic pods. - Complete packaging two legacy hardware simulators…
FY2027 planned work - Continue to provide technical and management support to the ENEWS Project. - Continue to draft and submit monthly and ad hoc reports and briefings, performance-based management assessments, apply risk reduction metrics, and financial execution reports. - Continue planning and research for verification and validation of the new RF simulation asset.
FY2026 to FY2027 change There is no significant funding change from FY 2026 to FY 2027.
FY2026 plans — current year - Complete characterization testing, data analysis and reports that compares and documents parametric data between simulator and threat system for two RF simulators. - Continue to provide technical and management support to the ENEWS Project. - Continue to draft and submit monthly and ad hoc reports and briefings, performance-based management assessments, apply risk reduction metrics, and financial execution reports. - Initiate planning and research for verification and validation of new RF simulation asset.
FY2027 planned work - Continue maintenance and upgrades to EO/IR, digital and RF laboratory simulation test and evaluation facilities and flight support equipment to provide Electronic Support (ES) and Electronic Attack (EA) test support to EW PORs. - Continue to maintain and update the ENEWS CRUISE_Misslies ASM models for use in Navy studies and Developmental Test (DT)/Operation Test (OT) test events. Updates performed on ENEWS models allow modeling & simulation (M&S) based EW testing for SEWIP Block 3, SOEA, LEED, Nulka Program, Navy Enterprise Testbed and Aegis Combat System Testbed (CSTB) programs. - Continue to update and install new ship models into ENEWS CRUISE_Missiles database and evaluate…
FY2026 to FY2027 change There is no significant funding change from FY 2026 to FY 2027.
FY2026 plans — current year - Continue maintenance and upgrades to EO/IR, digital and RF laboratory simulation test and evaluation facilities and flight support equipment to provide Electronic Support (ES) and Electronic Attack (EA) test support to EW PORs. - Continue to maintain and update the ENEWS CRUISE_Misslies ASM models for use in Navy studies and Developmental Test (DT)/Operation Test (OT) test events. Updates performed on ENEWS models allow modeling & simulation (M&S) based EW testing for SEWIP Block 3, SOEA, LEED, Nulka Program, Navy Enterprise Testbed and Aegis Combat System Testbed (CSTB) programs. - Continue to update and install new ship models into ENEWS CRUISE_Missiles database and evaluate…
What project 0672 buys
The objective of the Effectiveness of Naval Electronic Warfare (EW) Systems (ENEWS) Project is the development, maintenance, upgrade and application of critical simulation assets to determine the effectiveness of Electronic Warfare (EW) systems for the Surface Navy in simulated real-world engagement scenarios. ENEWS provides the Navy with Anti-Ship Missile (ASM) simulators, Modeling and Simulation (M&S) and state-of-the-art evaluation facilities to support the introduction of modern, effective shipboard and off-board EW systems and tactics for EW Programs of Record (POR). ENEWS develops, maintains and operates hardware simulators, digital simulations (M&S) of legacy, modern and advanced threat ASMs that provide EW PORs an integrated simulation capability through at-sea captive carry field trials with flyable simulators, digital ASM models and the Central Target Simulator (CTS) hardware-in-the-loop evaluation facility. The reliance of ENEWS assets by the Naval Sea Systems Command, Operational Test and Evaluation Force (OPTEVFOR), Office of Naval Research (ONR) and other EW Research, Development, Test and Evaluation (T&E) agencies speaks to the overall importance of this project. The project provides support and effectiveness evaluations for EW system designs, Engineering Test (ET), Development Test (DT), Operational Test (OT) events including and the development and utilization of techniques and tactics. In the past, ENEWS quick reaction capabilities have provided significant support and solutions in crisis situations such as the Libyan crises, Iran threat, Persian Gulf crisis, Operation Desert Shield/Storm, the Ukrainian Crisis in the Black Sea, and the crisis in the Red Sea. Simulation Display (SIMDIS) is a modeling tool developed under the ENEWS Project to support visualization of test events. SIMDIS has been adopted by most Department of War (DoW) T&E ranges as an effective tool that provides two and three dimensional graphical and video displays of live and post-test event data for EW T&E. One of the primary threats to surface ships is ASM systems. The ENEWS Project is unique in that it is the only project within DoW dedicated to developing and providing realistic ASM assets to test and evaluate the effectiveness of shipboard EW systems and tactics against these types of threats.