R-2A Activity · President's Budget PB2027

Integration and Test (I&T) Integrated Product Team (IPT)

FY2027 Request
$17.2M
▲ 58% vs FY2026
HitchAI read

This activity requests $17.2M in FY2027, 57% of project 3159, up 58% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$17.2M
▲ 58% vs FY2026
FY2026 Enacted
$10.9M
▼ 15% vs FY2025
FY2025 Actual
$12.8M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3159 of PE 0604378N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

As the NAVY lead for CSSN Project the NIFC team will execute Joint TrackExs and two Live Fire Events in FY27 in conjunction with ARMY and MDA. Test events to occur at White Sands Missile Range (WSMR) late FY27.

FY2026 to FY2027 change

The Integration and Test IPT increased from $10.906 to $17.218 The $6.312M increase from FY26 to FY27 is for a Joint TrackEx and two live fire test events scheduled in FY27 at White Sands Missile Range for the CSSN Project. This is an OSW sponsored project with MDA, Army and Navy participation with the Navy / NIFC Team performing as the lead service.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Execute Test Events in FY26: Capability Demonstration (CD) TrackEx (Non-Fire) as part of Combat Systems Ship Qualification Trials (CSSQT). Test planning and test integration events (Pillar and Pair/Tri wise testing in accordance with the NIFC System Engineering Plan (SEP), for Naval Integrated Fire Control - Advanced Waveform (NIFC-AW) Live Fire event in coordination with USMC to be conducted in FY27 (Currently not funded). Test planning and integration events, working group coordination for Land Based Live Fire in cooperation with the Army for Joint TrackEx and live fire events in FY27 (Cross Service Sensor Netting (CSSN) project).

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

012.8FY25ACTUAL10.9FY26ENACTED17.2FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual12.8
FY2026Enacted10.9
FY2027Request17.2

This activity is 57% of project 3159's FY2027 request and 41% of PE 0604378N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

2 activities in project 3159

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Integration and Test (I&T) Integrated Product Team (IPT) — this activity$17.2M ▲ 58%
Engineering Management And System Definition$12.9M ▼ 28%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604378N, project 3159 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access