R-2A Activity · President's Budget PB2027

Engineering Management And System Definition

FY2027 Request
$12.9M
▼ 28% vs FY2026
HitchAI read

This activity requests $12.9M in FY2027, 43% of project 3159, down 28% on FY2026. The R-2A exhibit describes it across FY2026–FY2027, including what the FY2027 money is planned to buy.

FY2027 Request
$12.9M
▼ 28% vs FY2026
FY2026 Enacted
$17.9M
▲ 15% vs FY2025
FY2025 Actual
$15.6M
Prior year
Planned work

What the FY2027 request buys

Verbatim from the R-2A exhibit for project 3159 of PE 0604378N. This is the budget justification's own description of work that has not happened yet — the one thing no other level of the budget carries.

FY2027 planned work

Continue system of systems (SoS) activities for NIFC Inc 3 advanced kill chains. Continue development of system documents for Increased sensor and network participation to meet fleet needs supporting warfighting in complex Naval Distributed Maritime Operations (DMO) environments. Continue Modeling and Simulations (M&S) for evaluation of advanced concepts utilizing existing and new networks and sensors. System Engineering, Performance Modeling, Analysis, and assessment of Integrated Fire Control (IFC) architectures to support decisions for investment and prioritization in future NIFC kill chain architectures. Develop models, simulations, and tools, to analyze, assess, and recommend potential future NIFC architectures. Support Decision Points for continuing effort on NIFC-AW in coordination with USMC if funded.

FY2026 to FY2027 change

The Engineering Management and System Definition decreased from $17.944 to $12.923. The $5.021M decrease from FY26 to FY27, reflects an emphasis on the Integration and Test IPT Efforts in FY27 with warfare center personnel tasking shifting to support FY27 live fire test activities.

Before the request year

FY2026: the year under way

Prior-year accomplishments and current-year plans from the same exhibit. Context for the FY2027 plan, not a series — an activity partitions its project exactly in the request year, but can under-cover it in earlier years.

FY2026 plans — current year

Continue system of systems (SoS) activities for NIFC Inc 3 advanced kill chains. Continue development of system documents for Increased sensor and network participation to meet fleet needs supporting warfighting in complex Naval Distributed Maritime Operations (DMO) environments. Continue Modeling and Simulations (M&S) for evaluation of advanced concepts utilizing existing and new networks and sensors. System Engineering, Performance Modeling, Analysis, and assessment of Integrated Fire Control (IFC) architectures to support decisions for investment and prioritization in future NIFC kill chain architectures. Develop models, simulations, and tools, to analyze, assess, and recommend potential future NIFC architectures. Support Decision Point 3 for continuing effort on NIFC-AW in coordination with USMC (currently NIFC-AW is not funded).

Money

Three years, and no five-year plan

An R-2A activity publishes the prior year, the current year and the budget year. The FYDP outyears exist at project and program-element level and are deliberately absent here rather than inferred. Estimate types are colored and never summed into one figure.

015.6FY25ACTUAL17.9FY26ENACTED12.9FY27REQUEST
Actual Enacted Request
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual15.6
FY2026Enacted17.9
FY2027Request12.9

This activity is 43% of project 3159's FY2027 request and 31% of PE 0604378N's. In the request year the activities under a project sum to it exactly; in the current year they under-cover it in about 9% of cases, so an activity's delta can legitimately exceed its parent's and the two must not be compared row to row.

Where this sits

2 activities in project 3159

Every R-2A line of this project, largest FY2027 request first. Linked where the activity has enough of its own narrative to carry a page; the rest are shown in full on the project page.

Integration and Test (I&T) Integrated Product Team (IPT)$17.2M ▲ 58%
Engineering Management And System Definition — this activity$12.9M ▼ 28%
Source
FY2027 Department of the Navy RDT&E Budget Justification · Exhibit R-2A · PE 0604378N, project 3159 (President's Budget PB2027). Congressional marks are recorded on the program element, never on an activity.
Machine access
Markdown twin /programs/0604378N/3159/a1.md · MCP mcp.hitchintel.combudget_get_activity