RDT&E Project · President's Budget PB2027

Shipboard Passive Electro-Optical Infrared Development

Project 3243·PE 0604501N — Advanced Above Water Sensors·U.S. Navy·BA5
FY2027 Request
$45.7M
▼ 15% vs FY2026
HitchAI read

Project 3243 — Shipboard Passive Electro-Optical Infrared Development requests $45.7M in FY2027, 67% of the $67.9M requested for program element 0604501N, down 15% on FY2026. 2 R-2A activities decompose the request. L3Harris is the largest named R-3 performer at $25.7M, 56% of the project's FY2027 R-3 total.

FY2027 Request
$45.7M
▼ 15% vs FY2026
FY2026 Enacted
$54.0M
▼ 41% vs FY2025
FY2025 Actual
$91.9M
Prior year
Project detail

What project 3243 buys

Shipboard Passive Electro-Optical/ Infrared (SPEIR) Block I provide surface ships a common 360-degree EO/IR Electronic Support (ES) capability that will passively find, fix, track, and target current/emerging threats in support of the following warfare missions: Anti-Ship Cruise Missile (ASCM) Defense, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), and Mobility. SPEIR Block I will consist of a passive Wide Field of View (WFOV) capability with a persistent 360-degree field-of-view optical sensors for autonomous detection and tracking for 24/7 situational awareness. SPEIR Block I will also include an enhanced, high-resolution Narrow-Medium Field of View (NFOV) and laser range-finding capability to provide 3D target tracking, identification, and threat assessment. SPEIR Block II will be a future program that will build on the modular open systems architecture of Block I with an expanded spatial coverage envelope and will add the capability for Periscope Detection and Discrimination (PDD), Mine Like Object (MLO) avoidance, networked operations, and full integration with the Future Integrated Combat System. Status of SPEIR Block I Major Milestones: Milestone B completed 3QFY22, and procurement of Low Rate Initial Production (LRIP) Lot 1 Long Lead Material (LLM) (2QFY25) and LRIP (3QFY26). The FY27 budget request supports software upgrades and the associated integration effort, and program testing. Scope also includes LRIP delivery, training curriculum development, commencement of Land Based Testing and continuing the Engineering & Manufacturing Development phase. Additionally, the completion of Modeling and Simulation (M&S) development and maturation, and completion of SPEIR Test and Certification are also planned in FY27. FY26 to FY27 funding decreases are due to the ramp down of developmental activities. Efforts will also include development of capability to integrate SPEIR with the AEGIS Combat System. RDT&E costs are ramping down in FY27 as a result of completion of Integration & Development Test planning, the majority of core software development, EDM material procurements, and all three (3) EDMs are assembled and integrated to support the execution of developmental test events prior to program transition to the Production phase.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Funding trajectory

Project 3243 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075091.9FY25ACTUAL54.0FY26ENACTED45.7FY27REQUEST11.5FY2811.0FY2911.0FY3011.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual91.9
FY2026Enacted54.0
FY2027Request45.7
FY2028Outyear11.5
FY2029Outyear11.0
FY2030Outyear11.0
FY2031Outyear11.2
Inside the project

2 accomplishments / planned programs

The R-2A exhibit — the only level of the budget that describes work that has not happened yet. Activities carry the prior, current and budget year only, no five-year plan. Each describe FY2027 work in enough detail to have their own page; the rest are shown here in full. Coverage is partial across the corpus, so count activities, never total them.

FY2025 actual$61.3M
FY2026 enacted$36.2M
FY2027 request$33.2M

- Continue support and oversight of Engineering Development Model (EDM) activities - Continue and complete Hardware & Software Integration - Continue development for Combat System Integration (CSI) - Complete SPEIR Test & Certification events - Deliver LRIP for commencement of installation to the initial Test Ship - Complete…

Read the FY2027 plan →
FY2025 actual$30.6M
FY2026 enacted$17.8M
FY2027 request$12.5M

- Complete support and oversight of Engineering Development Model (EDM) hardware and software development and integration - Continue review and assessment of contract deliverables - Conduct and execute LRIP delivery and associated acquisition documentation - Provide engineering oversight of development for combat system integration…

Read the FY2027 plan →
Who's building it

Named performers on project 3243

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

L3Harris
$25.7M · 56%
Lockheed Martin
$7.5M · 16%
APL
$2.7M · 5.9%
NRL
$2.1M · 4.6%