RDT&E Program Element · President's Budget PB2027

Advanced Above Water Sensors

PE 0604501N·U.S. Navy·Approp. 1319 — RDT&E·BA5 — System Development & Demonstration
FY2027 Request
$67.9M
Navy · RDT&E
HitchAI read

U.S. Navy requests $67.9M in FY2027. In the FY2027 defense authorization, the House funded it in full; the Senate funded it in full; House appropriators funded it in full. L3Harris leads the industry work, though an unusually large share flows to government labs and warfare centers.

FY2027 Request
$67.9M
▲ 0.0% vs FY2026
FY2026 Enacted
$67.9M
▼ 37% vs FY2025
FY2025 Actual
$108.6M
Prior year

Roll-up of 2 projects. Projects are the summable leaves — the PE total is their sum, never added to it.

For fiscal year 2027, the U.S. Navy is requesting $67.9M for Advanced Above Water Sensors under RDT&E program element 0604501N, up 0.0% over FY2026.

Funding trajectory

Funding profile, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure.

2550751000108.6FY25ACTUAL67.9FY26ENACTED67.9FY27REQUEST42.9FY2841.7FY2940.9FY3041.8FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual108.6
FY2026Enacted67.9
FY2027Request67.9
FY2028Outyear42.9
FY2029Outyear41.7
FY2030Outyear40.9
FY2031Outyear41.8
Where it sits

Acquisition lifecycle

This program is funded in RDT&E Budget Activity 5 — System Development & Demonstration.

Complete
Research
BA 1–2
Complete
Advanced Technology
BA 3
Complete
Prototyping
BA 4
Current
Development & Fielding
BA 5–7
Inside the program element

2 projects roll up into PE 0604501N

Projects are the summable leaves — the PE total is their sum, never added to it. Program elements and projects carry the full five-year plan; activities stop at the budget year. This PE moves 0% overall, which can hide much larger swings below.

Congressional action

Congressional marks

Committee marks on the FY2027 request. Adds and cuts are reconciled in conference before they become law.

RequestPresident's Budget
$67.9M
House NDAA (HASC)HASC
$67.9M full · +$0
Senate NDAA (SASC)SASC
$67.9M full · +$0
House Approps (HAC-D)HAC_D
$67.9M full · +$0
unresolved as of 2026-07-27. These are FY2027 authorization marks (NDAA); appropriations and the conference agreement may differ.
Who's building it

Where the FY2027 request goes

Performers named in the R-3 exhibit, resolved into industry, government-lab, and unspecified shares. Budget-justification contract funding, not obligations.

L3Harris
$25.7M · 38%
SPEIR Block 1 Development · CPIF
Lockheed Martin
$7.5M · 11%
SPEIR Block 1 Combat System Integration · CPIF
Where FY2027 funding flowsShare$M
Industry primes65%44.2
Government labs & warfare centers35%23.7
FY2027 request100%67.9
See L3Harris's full federal contract ledger members
Program detail

Mission & acquisition strategy

Multi-Mission Signal Processor (MMSP): The development of MMSP provides simultaneous Anti-Air Warfare (AAW)/Ballistic Missile Defense (BMD) multi-mission capability for DDG 51 class ships as part of the Aegis Modernization Program. This capability is utilized for DDG 113 and follow new construction and Aegis Ashore. Modifies SPY-1D transmitters to enable dual beam for reduced frame times and better reaction time, provides stability for all D(V) waveforms, and avoids operational degradation. The SPY-1 radar system detects, tracks, and supports engagements of a broader range of threats.

Improved Capabilities SPY-1 Reliability, Maintainability, and Availability (RM&A) will design and develop an Ordnance Alterations (ORDALT) Package for fixes and modifications to known transmitter, signal processor, microwave tube (MWT), and logistic shortcomings. Lockheed Martin Corporation (Moorestown, New Jersey) was awarded a sole source, cost- plus-fixed-fee, level-of-effort job order under a Basic Ordering Agreement (BOA) via Naval Surface Warfare Center (NSWC) Crane. The contract supports the development and fielding of AN/SPY-1 Radar capability upgrades and reliability improvements in support of AEGIS combat system. Investment in development of SPY-1 RM&A improvements to address failure mechanisms and improve reliability.

Project 3243, 3301 — Shipboard Passive Electro-Optical Infrared Development
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
Ask Hitch

Ask this program element

Answers are generated from the figures on this page — the FY2027 justification exhibits and the marks tracked above — and nothing else is consulted. Confirm any figure against the cited exhibit before you use it externally.

H
Questions this page can answer
How does the FY2027 request compare with FY2026, and what does the five-year plan show?What did the FY2027 NDAA committees do to this request?Which project inside PE 0604501N is growing fastest, and which is shrinking?How is the FY2027 request split between industry and government performers?

This page carries the budget justification and the NDAA marks — nothing else. For what L3Harris has actually been obligated, the ledger is at hitchintel.com/vendors; for live solicitations, hitchintel.com/opportunities. Both are member surfaces.

Provenance

Cite this page

Sources
FY2027 Department of the Navy RDT&E Budget Justification · Exhibits R-2 / R-3 · PE 0604501N (President's Budget PB2027) — and FY2027 NDAA committee marks, as tracked 2026-07-27.
Suggested citation
HitchAI, "Advanced Above Water Sensors (PE 0604501N)," federal budget intelligence, PB2027 vintage. hitchintel.com/programs/0604501N
Machine access
Markdown twin /programs/0604501N.md · MCP mcp.hitchintel.combudget_get_program_element, budget_get_cong_marks
FY2027 Request
$45.7M
▼ 15% vs FY2026
FY2026 Enacted
$54.0M
▼ 41% vs FY2025
FY2025 Actual
$91.9M
Prior year

Shipboard Passive Electro-Optical Infrared Development — one RDT&E project inside PE 0604501N. Congressional marks are recorded on the program element, not on a project.

Project 3243 — Shipboard Passive Electro-Optical Infrared Development — requests $45.7M in FY2027, 67% of the $67.9M requested for program element 0604501N. Year over year it falls 15% against FY2026.

Funding trajectory

Project 3243 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

255075091.9FY25ACTUAL54.0FY26ENACTED45.7FY27REQUEST11.5FY2811.0FY2911.0FY3011.2FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual91.9
FY2026Enacted54.0
FY2027Request45.7
FY2028Outyear11.5
FY2029Outyear11.0
FY2030Outyear11.0
FY2031Outyear11.2
Inside the project

2 accomplishments / planned programs

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$30.6M
FY2026 enacted$17.8M
FY2027 request$12.5M

- Complete support and oversight of Engineering Development Model (EDM) hardware and software development and integration - Continue review and assessment of contract deliverables - Conduct and execute LRIP delivery and associated acquisition documentation - Provide engineering oversight of development for combat system integration…

Read the FY2027 plan →
FY2025 actual$61.3M
FY2026 enacted$36.2M
FY2027 request$33.2M

- Continue support and oversight of Engineering Development Model (EDM) activities - Continue and complete Hardware & Software Integration - Continue development for Combat System Integration (CSI) - Complete SPEIR Test & Certification events - Deliver LRIP for commencement of installation to the initial Test Ship - Complete…

Read the FY2027 plan →
Project 3243 — every activity in full →
Who's building it

Named performers on project 3243

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

L3Harris
$25.7M · 56%
Lockheed Martin
$7.5M · 16%
APL
$2.7M · 5.9%
NRL
$2.1M · 4.6%
Project detail

What project 3243 buys

Shipboard Passive Electro-Optical/ Infrared (SPEIR) Block I provide surface ships a common 360-degree EO/IR Electronic Support (ES) capability that will passively find, fix, track, and target current/emerging threats in support of the following warfare missions: Anti-Ship Cruise Missile (ASCM) Defense, Counter-Unmanned Aircraft Systems (UAS), Counter-Fast Attack Craft / Fast Inshore Attack Craft (FAC/FIAC), and Mobility. SPEIR Block I will consist of a passive Wide Field of View (WFOV) capability with a persistent 360-degree field-of-view optical sensors for autonomous detection and tracking for 24/7 situational awareness. SPEIR Block I will also include an enhanced, high-resolution Narrow-Medium Field of View (NFOV) and laser range-finding capability to provide 3D target tracking, identification, and threat assessment. SPEIR Block II will be a future program that will build on the modular open systems architecture of Block I with an expanded spatial coverage envelope and will add the capability for Periscope Detection and Discrimination (PDD), Mine Like Object (MLO) avoidance, networked operations, and full integration with the Future Integrated Combat System. Status of SPEIR Block I Major Milestones: Milestone B completed 3QFY22, and procurement of Low Rate Initial Production (LRIP) Lot 1 Long Lead Material (LLM) (2QFY25) and LRIP (3QFY26). The FY27 budget request supports software upgrades and the associated integration effort, and program testing. Scope also includes LRIP delivery, training curriculum development, commencement of Land Based Testing and continuing the Engineering & Manufacturing Development phase. Additionally, the completion of Modeling and Simulation (M&S) development and maturation, and completion of SPEIR Test and Certification are also planned in FY27. FY26 to FY27 funding decreases are due to the ramp down of developmental activities. Efforts will also include development of capability to integrate SPEIR with the AEGIS Combat System. RDT&E costs are ramping down in FY27 as a result of completion of Integration & Development Test planning, the majority of core software development, EDM material procurements, and all three (3) EDMs are assembled and integrated to support the execution of developmental test events prior to program transition to the Production phase.

R-3 lines of work
  • Product Development
  • Support
  • Test and Evaluation
  • Management Services
FY2027 Request
$22.2M
▲ 60% vs FY2026
FY2026 Enacted
$13.9M
▼ 17% vs FY2025
FY2025 Actual
$16.7M
Prior year

Improved Capabilities SPY-1 Radar — one RDT&E project inside PE 0604501N. Congressional marks are recorded on the program element, not on a project.

Project 3301 — Improved Capabilities SPY-1 Radar — requests $22.2M in FY2027, 33% of the $67.9M requested for program element 0604501N. Year over year it grows 60% against FY2026.

Funding trajectory

Project 3301 funding, FY2025–FY2031

Prior years are actuals, the budget year is the request, and the outyears are the FYDP plan. Estimate types are colored and never summed into one figure. Projects carry the full five-year plan; the activities inside them stop at the budget year.

25016.7FY25ACTUAL13.9FY26ENACTED22.2FY27REQUEST31.4FY2830.7FY2929.9FY3030.6FY31
Actual Enacted Request Outyear (FYDP)
Fiscal YearEstimate TypeAmount ($M)
FY2025Actual16.7
FY2026Enacted13.9
FY2027Request22.2
FY2028Outyear31.4
FY2029Outyear30.7
FY2030Outyear29.9
FY2031Outyear30.6
Inside the project

1 accomplishment / planned program

The R-2A exhibit. Activities carry the prior, current and budget year only — no five-year plan — and they are descriptive: coverage is partial and they do not always add back to the project, so count them, never total them. Opening lines only here — the full year-by-year narrative is on the project page.

FY2025 actual$16.7M
FY2026 enacted$13.9M
FY2027 request$22.2M

- Continue ACE Phase 2 development and complete demo - Continue SBNCTR Phase 2A development to include integration of other sensors, and complete Integration and Test - Continue TNC Phase 1/2 development - Continue EA improvements technology development - Continue Radar Improvements Analysis - Continue ERACE Backfits - Continue ERACE…

Read the FY2027 plan →
Project 3301 — every activity in full →
Who's building it

Named performers on project 3301

Performers named in the R-3 exhibit under this project. Share is of the project's whole FY2027 R-3 total — the same denominator the program-element split uses, so the two read on one scale and will not sum to 100% when unnamed or government work is in the mix. Budget-justification contract funding, not obligations.

AEGIS Techrep
$1.4M · 6.2%
NRL
$1.1M · 5.1%
SPA
$0.8M · 3.4%
MIT/LL
$0.4M · 1.7%
Project detail

What project 3301 buys

Improved Capabilities for SPY-1 Radar: These Reliability, Maintainability, and Availability (RM&A) improvements and solid state technology insertions are intended to reduce cascading failures, mitigate obsolescence issues, and improve reliability in support of Anti-Air Warfare (AAW) and Ballistic Missile Defense (BMD) missions while still providing AN/ SPY-1 Radar Total Ownership Cost Reductions. Improvements, such as Solid State Insertion to address Diminishing Manufacturing Sources and Material Shortages (DMSMS), will yield reductions in annual fleet maintenance costs and is a top fleet requirement as part of the AEGIS Wholeness initiative. In addition to RM&A improvements, warfighting improvements funded in this line includes the following: Transmitter Noise Cancellation (TNC) development includes hardware/software to counter low radar cross section, low altitude threats. The Ship-Based Non-Cooperative Target Recognition (SBNCTR) program Phase 2A will develop algorithms to provide classification for targets. Advanced Calibration Experiment (ACE) Phase 2 is being incorporated into Baseline 9. Elevated Radar Advanced Calibration Experiment (ERACE) Backfits and Phase 3 will incorporate into Baseline 9. Electronic Attack (EA) and Rapid Radar Capability Improvement Program (R2CIP) develop solutions for evolving EA threats. The development of MMSP provides simultaneous Anti-Air Warfare (AAW)/Ballistic Missile Defense (BMD) multi-mission capability for DDG 51 class ships as part of the Aegis Modernization Program. This capability is utilized for DDG 113 and follow new construction and Aegis Ashore. Modifies SPY-1D transmitters to enable dual beam for reduced frame times and better reaction times, provides stability for all D(V) waveforms, and avoids operational degradation. The SPY-1 radar system detects, tracks, and supports engagements of a broader range of threats. MMSP improves performance in littoral, ducted clutter, electronic attack (EA), and chaff environments and provides greater commonality in computer programs and equipment. This effort also provides for the development of MMSP-Restoration (MMSP-R) to support system security requirements on Destroyers Commercial Off The Shelf (COTS) refresh and MMSP/MMSP-R technology refresh.

R-3 lines of work
  • Product Development
  • Management Services